CN2771278Y - Crossroads ore body bridge - Google Patents

Crossroads ore body bridge Download PDF

Info

Publication number
CN2771278Y
CN2771278Y CN 200420000020 CN200420000020U CN2771278Y CN 2771278 Y CN2771278 Y CN 2771278Y CN 200420000020 CN200420000020 CN 200420000020 CN 200420000020 U CN200420000020 U CN 200420000020U CN 2771278 Y CN2771278 Y CN 2771278Y
Authority
CN
China
Prior art keywords
bridge
road
crossroads
car
roads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420000020
Other languages
Chinese (zh)
Inventor
张彦修
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420000020 priority Critical patent/CN2771278Y/en
Application granted granted Critical
Publication of CN2771278Y publication Critical patent/CN2771278Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a conjoined bridge for crossroads, particularly a building facility for crossroads of roads. A combined body of a bridge and roads is built on the crossroads of the roads so that a direct-driving car, a right-turning car, a left-turning car, a turning-around car and pedestrians of all directions walk on own roads without traffic jam, and traffic lights are cancelled forever. The utility model has the technical scheme that an integral bridge is built on any two opposite roads of the crossroads, three holes are arranged below the bridge, both side roads of the crossroads are respectively built with a bridge below which a hole is arranged, and are respectively built with a conjoined road connected with the integral bridge, and the holes of four road ports are all provided with sidewalks. The facility is the conjoined bridge for crossroads. The project is suitable for crossroads with road width of more than 35 meters.

Description

Crossroad disjunctor bridge
Technical field
The utility model relates to the building facilities of road crossroad.
Background technology
All in traffic congestion, very the person is up to a hundred for each metropolis road traffic of the whole world.In Reference News's newspaper the 4th edition " the crossing traffic congestion is alleviated in the short-term transformation " literary composition on November 1st, 2003, reported the even more serious situation of Washington, DC crossing traffic congestion: thousands of up to ten thousand.Its main cause is that traffic lights have been set up in the crossroad---it is the chief-criminal.The few traffic lights of car work.Current car is surprisingly many, equidirectional six track horizontal slidings.Also direct traffic with traffic lights in this case, green light had only been given and to have been crossed tens, red light is bright again back traffic congestion or long queue.
Build a bridge on a road at the parting of the ways, can only solve the straightgoing vehicle on the bridge, ground straightgoing vehicle and all turn left car it don't work, under bridge, also have traffic lights in traffic congestion.This is that all vehicles that four directions come are handled well simultaneously, has formed the traffic disturbance situation that car traffic congestion, the stifled people of car, people wear car sky, the stifled people of people.
The modernization overpass bridge has four layers, five layers ... up to more than 30 meters, take up an area of several square kilometres, bridge construction took time more than two, three years, but ground also has traffic lights in traffic congestion under its bridge, because go vehicle at a distance to walk overpass bridge, removes the road of ground surface of walking nearby.The modernization overpass bridge has only played the shunting vehicle, does not have to solve the problem of crossing traffic congestion comprehensively.
Summary of the invention
The utility model design scheme is to build the combination of forming with bridge and road on the road crossroad.In combination, give straightgoing vehicle, the car of turning right, the car of turning left, turn around car and pedestrian built the circuit that travels separately, taking their own roads, to have realized up hill and dale unblocked comprehensively.Cancelled traffic lights forever!
The utility model design technology project:
Crossroad disjunctor bridge
It is to build a whole bridge on relative two roads arbitrarily at the parting of the ways, and three bridge openings are arranged under the bridge.Whole bridge both sides road is built a bridge separately, and a bridge opening is arranged under the bridge, and builds a disjunctor road separately and whole bridge joins.Article four, the intersection of roads bridge opening all has the sidewalk.
Its design scheme be the most comprehensive, solved cubic straightgoing vehicle, the car of turning right, the car of turning left, turn around car and the pedestrian who comes the most up hill and dale, all take their own roads, unblocked, without any intersection.Driving with not have the crossing to travel the same at forthright, traffic and technique effect are the best, crossroad more than 35 meters is suitable for having a lot of social connections.
Description of drawings
Accompanying drawing is the schematic top plan view of the utility model crossroad disjunctor bridge;
The specific embodiment
As shown in drawings, each toponym of the structure of crossroad disjunctor bridge: the disjunctor bridge is to go up with three bridges, five hole disjunctors together at the parting of the ways.Article four, the road is called A, B, C, D road.A whole bridge 1 is built up on A, C road, and three holes are arranged under the bridge, A bridge 2 by name, C bridge 4, A bridge opening 6, C bridge opening 8, middle bridge opening 10.A bridge 11 is built on its a side B road.A bridge one hole D bridge 5 by name is built on its opposite side D road, there is disjunctor road 11 in D bridge opening 9 with C bridge 4, A bridge about 2 respectively, but on the opposite of B bridge 3.
The route on each road, near road center line 12 be first road 13, inferior be second road 14, be the 3rd road 15 once more, below be the 4th road 16, each bridge opening all has an outlet 20 to turn car 19 about second road 14, right side is convenient to turn to.
Each road traffic route, the straightgoing vehicle 17 on A, B, C, D road first road 13 of all keeping to the right away, straight line goes to the other side separately.Walking on whole bridge 1 of A, C road, the following bridge of going up on B, D road passes middle bridge opening 10.
The A A bridge 2 of turning right on the road on the car 18 is walked the 3rd road 15, and the row of turning right is in AB disjunctor road 11, and last B bridge 3 is walked the 3rd road 15.
The A A bridge 2 of turning left on the road on the car 19 is walked the 4th road 16, and the A bridge 2 of turning right down enters B hole 7 turns left to come out from B bridge opening bottom outlet 20, in the middle of passing on the bridge opening 10 D bridge 5 walk second road 14.
The B B bridge 3 of turning right on the road on the car 18 is walked the 3rd road 15 and is turned right row in BC disjunctor road 11, and last C bridge 4 is walked the 3rd road 15.
The B B bridge 3 of turning left on the road on the car 19 is walked the 4th road 16 B bridge 3 of turning right down and is entered C bridge opening 8 and turn left to come out from C bridge opening bottom outlet 20, and last AC bridge goes to away second road 14 toward A bridge 2.
The car 18 of turning right on C, D road, the car 18 of turning right on car 19 and A, B road of turning left, the car 19 of turning left are all tossed about corresponding respectively, and traffic route is also all tossed about identical respectively.The C car 18 of turning right on the road goes to the D road, and the C car 19 of turning left on the road goes to the B road.The D car 18 of turning right on the road goes to the A road, and the D car 19 of turning left on the road goes to the C road.
Each road bus or train route line that turns around to walk to turn left behind the Che Shangqiao connects and wears two bridge openings, in second bridge opening just the bridge opening, opposite of incoming road from hole bottom outlet 20 second road 14 that comes out away.
In construction, to note following problem:
1, A, B, C, D, road can arbitrarily be placed on the road of the four corners of the world.
2, the ramp of bridge, length are 120-150 rice.
3, the bridge opening height is that the bottom surface, bridge opening can not be less than 5 meters to the distance of road under bridge face.Preferably the bridge opening is protruding 3 meters, recessed 2 meters of road under bridge face (is certificate with the ground line).

Claims (1)

1, a kind of crossroad disjunctor bridge, it is characterized in that: build into a whole bridge on relative two roads arbitrarily at the parting of the ways, three bridge openings are arranged under the bridge, its both sides road is built a bridge separately, the next bridge opening of bridge, and build a disjunctor road separately and whole bridge joins, four intersection of roads bridge openings all have the sidewalk.
CN 200420000020 2004-01-05 2004-01-05 Crossroads ore body bridge Expired - Fee Related CN2771278Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420000020 CN2771278Y (en) 2004-01-05 2004-01-05 Crossroads ore body bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420000020 CN2771278Y (en) 2004-01-05 2004-01-05 Crossroads ore body bridge

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN 200520002179 Division CN2825719Y (en) 2004-01-05 2004-01-05 Double-opening bridge on T-shape crossroad
CN 200520002176 Division CN2825718Y (en) 2004-01-05 2004-01-05 Bridge on crossroad with one opening and four round ramps
CN 200520002178 Division CN2828118Y (en) 2004-01-05 2004-01-05 Crossroad crossing

Publications (1)

Publication Number Publication Date
CN2771278Y true CN2771278Y (en) 2006-04-12

Family

ID=36705064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420000020 Expired - Fee Related CN2771278Y (en) 2004-01-05 2004-01-05 Crossroads ore body bridge

Country Status (1)

Country Link
CN (1) CN2771278Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008089646A1 (en) * 2007-01-18 2008-07-31 Baomin Wang City road intersection
CN102677560A (en) * 2011-03-18 2012-09-19 王晓川 Four-bent-ramp low-span flyover
CN108330757A (en) * 2018-01-15 2018-07-27 石家庄铁道大学 Intersection road structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008089646A1 (en) * 2007-01-18 2008-07-31 Baomin Wang City road intersection
CN102677560A (en) * 2011-03-18 2012-09-19 王晓川 Four-bent-ramp low-span flyover
CN108330757A (en) * 2018-01-15 2018-07-27 石家庄铁道大学 Intersection road structure
CN108330757B (en) * 2018-01-15 2020-04-21 石家庄铁道大学 Road structure of intersection

Similar Documents

Publication Publication Date Title
CN207073044U (en) Bridge tunnel composite cross crossing road
CN1916281A (en) Underground system for dividing flow of vehicles and foot passengers at crossroad
CN105155374A (en) Multifunctional cross-shaped overpass
CN106192642A (en) A kind of multi-functional cross overpass
CN102296504A (en) Viaduct with a junction of three roads
CN101709561B (en) Unblocked cloverleaf intersection at traffic crossroad
CN102787541A (en) Crossroad traffic system with no traffic light
CN1776094A (en) Semi-submersible full-interpass man-vehicle separate flyover
CN2771278Y (en) Crossroads ore body bridge
CN101387095B (en) Full interchange crossroad
CN107988866B (en) Simple overpass
CN101078191A (en) Symmetrical viaduct
CN102383350A (en) U-shaped combined passageway for crossroad
CN2825718Y (en) Bridge on crossroad with one opening and four round ramps
CN2828118Y (en) Crossroad crossing
CN103321116B (en) Cross way structure for dispersing traffic flow based on speeds at cross road
CN2825719Y (en) Double-opening bridge on T-shape crossroad
CN1222664C (en) Two-layer intercommunication footway and vehicular travelway separated overpass
CN1344838A (en) Two-layer intercommunicated overpass with separated traffic lanes and pavements
CN203451962U (en) Intersection fast-slow diverging cross road structure
CN1908304A (en) Crossroad access bridge
CN202744915U (en) Intersection traffic system without traffic light
CN107503254A (en) The bridge floor viaduct of crossroad four
CN200996121Y (en) Arced bridge at crossroad
CN202181491U (en) U-shaped combined passage of crossroad

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Patentee address after: 11 groups of two crossing committees of North Ditch Street community, Tiexi District, Siping City, Jilin

Patentee address before: Five sets of the South Bridge Committee of loess street, Siping City, Siping City, Jilin

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee