CN2761560Y - Griping device for installation operation of high-altitude mechanical - Google Patents
Griping device for installation operation of high-altitude mechanical Download PDFInfo
- Publication number
- CN2761560Y CN2761560Y CN 200420085562 CN200420085562U CN2761560Y CN 2761560 Y CN2761560 Y CN 2761560Y CN 200420085562 CN200420085562 CN 200420085562 CN 200420085562 U CN200420085562 U CN 200420085562U CN 2761560 Y CN2761560 Y CN 2761560Y
- Authority
- CN
- China
- Prior art keywords
- plate
- shaft
- fixed orifice
- vertical
- suspension hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a griping device for mechanical installing operation in high altitude, which belongs to the technical field of a hoisting device and can conveniently and quickly finish the installation of a vertical shaft and a vertical pipeline in high altitude. The utility model has the technical scheme that the griping device is composed of two shaft clamping plates, wherein the middle part on the plate surface of each shaft clamping plate is provided with an outward half circular arc-shaped bulge, and fixing holes are arranged on the plate faces on both sides of the bulge. The griping device for mechanical installing operation in high altitude can clamp and fix the vertical shaft or the vertical pipeline needed to be installed tightly through two shaft clamping plates, then a hoisting machine is used for hooking the fixing holes at both ends of the shaft clamping plates to hoist the vertical shaft or the vertical pipeline and the shaft clamping plates can be moved to move and position the vertical shaft or the vertical pipeline for installation. The utility model can be used for installation conveniently, quickly and safely.
Description
Technical field
The utility model relates to a kind of high-altitude machinery installation exercise anchor clamps, belongs to the lifting device technical field.
Background technology
In the modern industry construction and producing, usually need to carry out high-altitude machinery installation exercise, in most installation exercises, all adopt common apparatus, as tower crane, crawler crane, overhead traveling crane etc., also need utensil cooperations such as jack sometimes.But, because the special construction of some equipment, very difficult, time-consuming when using common apparatus to install, effort, also be easy to take place accident on duty.In the installation exercise as some vertical mill, just there is great difficulty in reductor with being connected of oscillating axle, it mainly is the high-altitude that the reductor catcher is positioned at several meters, oscillating axle is below reductor, between catcher and the oscillating axle is that thru-bolt is connected, and centering centering is difficulty quite, use overhead traveling crane and jack coordinating operation during installation, effect is still undesirable, need expend a large amount of personnel and man-hour.Therefore, it is very necessary adopting special-purpose auxiliary mould anchor clamps for this kind equipment when the installation exercise.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of high-altitude machinery installation exercise anchor clamps, and is convenient, fast to realize, finish the installation of high-altitude vertical shaft and riser safely.
The technical scheme that addresses the above problem is: a kind of high-altitude machinery installation exercise anchor clamps, and it is made up of two bobbin clamping plate, and the plate face middle body of every bobbin clamping plate has outside semicircle arcuation projection, is provided with fixed orifice on the plate face of protruding both sides.
Above-mentioned high-altitude machinery installation exercise anchor clamps, described fixed orifice is arranged in the plate face upper edge plate face length degree direction of semicircle arcuation projection both sides, and the quantity of fixed orifice is every side 3-4, and the plate face of described protruding both sides is a rectangular steel plates.
Above-mentioned high-altitude machinery installation exercise anchor clamps, it also has two suspension hook plates, and the suspension hook plate is a rectangular steel plates, and suspension hook groove and fixed orifice are arranged on the suspension hook plate, and fixed orifice is arranged along plate face length degree direction, and quantity is 2-3.
Vertical shaft that this high-altitude machinery installation exercise anchor clamps can be installed needs or riser are with two bobbin clamping plate clamp fittings, hook the fixed orifice at axle clamp plate two ends then with lifting machine, vertical shaft or riser are sling, the shifting axle clamping plate can be with vertical shaft or riser running fix, very convenient, quick, safety are installed.
Description of drawings
Fig. 1 is the front elevation of axle clamp plate of the present utility model;
Fig. 2 is the birds-eye view of Fig. 1;
Fig. 3 is the structural representation of suspension hook plate;
Mark is as follows among the figure: axle clamp plate 1, projection 2, fixed orifice 3, suspension hook plate 4, suspension hook groove 5
The specific embodiment
As seen, this anchor clamps are made up of two bobbin clamping plate 1 from Fig. 1,2,3, and when two bobbin clamping plate 1 lumped together, middle two semicircle arcuations projection 2 was formed a cylindrical space, axle or pipeline etc. can be clipped in wherein.If be special-shaped axis or pipeline, the inner wall shape with protruding 2 is designed to get final product with the profile coupling of axle or pipeline.During installation, the axle clamp plate 1 that axle of selecting earlier and will installing or pipe diameter are complementary, axle or pipeline are put into the semi arch of axle clamp plate 1, passing fixed orifice 3 with binding bolt then clamps two bobbin clamping plate, hook the fixed orifice 3 at axle clamp plate 1 two ends again with the suspension hook of lifting machine, just vertical shaft or riser can be sling, shifting axle clamping plate 1 can be with vertical shaft or riser running fix, very convenient, quick, safety are installed.In the installation exercise of vertical mill, oscillating axle can be clamped with axle clamp plate 1, suspension hook plate 4 is fixed on reductor outer container floor both sides, utilizes jack that axle clamp plate 1 is hung on the suspension hook plate 4, and lift shaft clamping plate 1 put oscillating axle in place, install.This method is saved tens times of man-hours than adopting common apparatus to install.
Claims (3)
1. high-altitude machinery installation exercise anchor clamps, it is characterized in that: it is made up of two bobbin clamping plate [1], and the plate face middle body of every bobbin clamping plate [1] has outside semicircle arcuation projection [2], is provided with fixed orifice [3] on the plate face of protruding [2] both sides.
2. high-altitude according to claim 1 machinery installation exercise anchor clamps, it is characterized in that: described fixed orifice [3] is arranged in the plate face upper edge plate face length degree direction of semicircle arcuation projection both sides, the quantity of fixed orifice is every side 3-4, and the plate face of described projection [2] both sides is a rectangular steel plates.
3. high-altitude according to claim 1 and 2 machinery installation exercise anchor clamps, it is characterized in that: it also has two suspension hook plates [4], and suspension hook plate [4] is a rectangular steel plates, and suspension hook groove [5] and fixed orifice [3] are arranged on suspension hook plate [4], fixed orifice [3] is arranged along plate face length degree direction, and quantity is 2-3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420085562 CN2761560Y (en) | 2004-11-23 | 2004-11-23 | Griping device for installation operation of high-altitude mechanical |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420085562 CN2761560Y (en) | 2004-11-23 | 2004-11-23 | Griping device for installation operation of high-altitude mechanical |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2761560Y true CN2761560Y (en) | 2006-03-01 |
Family
ID=36094692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420085562 Expired - Fee Related CN2761560Y (en) | 2004-11-23 | 2004-11-23 | Griping device for installation operation of high-altitude mechanical |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2761560Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081471A (en) * | 2016-06-27 | 2016-11-09 | 河南中托力合化学有限公司 | A kind of pipeline uplifting device |
CN106744284A (en) * | 2017-02-24 | 2017-05-31 | 马鞍山万普实业发展有限公司 | A kind of stone tongs for the transport of workshop steel construction |
-
2004
- 2004-11-23 CN CN 200420085562 patent/CN2761560Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081471A (en) * | 2016-06-27 | 2016-11-09 | 河南中托力合化学有限公司 | A kind of pipeline uplifting device |
CN106744284A (en) * | 2017-02-24 | 2017-05-31 | 马鞍山万普实业发展有限公司 | A kind of stone tongs for the transport of workshop steel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108660946B (en) | Method for replacing main cable of suspension bridge | |
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN101966965A (en) | Special hanger with guide cover wheel hub and turning and hanging method | |
CN109987546B (en) | Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof | |
CN105384060A (en) | Lifting appliance suitable for lifting pipelines | |
CN209081261U (en) | Cable and optical cable pipe network pipeline auxiliary hoisting device | |
CN210655973U (en) | Movable vertical lifting device with adjustable height | |
CN202400722U (en) | Device for hoisting heavy object with large length-width ratio | |
CN2761560Y (en) | Griping device for installation operation of high-altitude mechanical | |
CN205151546U (en) | Quick assembly disassembly formula multilayer piping lane poling device | |
CN202542770U (en) | Tube joint turning over device of pressure steel tube in hole chamber | |
CN105006924B (en) | Motor core threading device and its punching method | |
CN207671613U (en) | A kind of lift cart of Pipe installing | |
CN216512739U (en) | Heavy well lid start-stop equipment of inspection shaft | |
CN209781857U (en) | Pipeline installation car in piping lane | |
CN212639653U (en) | Stereoplasm infusion pipeline gate bridge hoist and mount gyro wheel device | |
CN206680096U (en) | One kind is used for restricted clearance hanging apparatus | |
CN204906130U (en) | Motor punching device | |
CN209367153U (en) | Pipeline transportation mould | |
CN203998724U (en) | A kind of tower machine attached wall assembling and disassembling stand | |
CN209681505U (en) | It is a kind of that conduit saddle installation effectiveness fixture easy to make can be improved | |
CN220300141U (en) | Pipeline hoist device | |
CN205170253U (en) | Detachable removal hoist device | |
CN207451512U (en) | A kind of four-wheel /V lifts dragging device | |
CN218520968U (en) | Steel reinforcement cage pulls positioner for building installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |