CN2756806Y - New vertically mounting and lifting drilling bit derrick - Google Patents

New vertically mounting and lifting drilling bit derrick Download PDF

Info

Publication number
CN2756806Y
CN2756806Y CN 200420041616 CN200420041616U CN2756806Y CN 2756806 Y CN2756806 Y CN 2756806Y CN 200420041616 CN200420041616 CN 200420041616 CN 200420041616 U CN200420041616 U CN 200420041616U CN 2756806 Y CN2756806 Y CN 2756806Y
Authority
CN
China
Prior art keywords
section
hypomere
hoisting
wait
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420041616
Other languages
Chinese (zh)
Inventor
刘玉杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420041616 priority Critical patent/CN2756806Y/en
Application granted granted Critical
Publication of CN2756806Y publication Critical patent/CN2756806Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a new vertically mounting and lifting driller derrick. The utility model is characterized in that the utility model comprises a lower section and rest sections to be lifted, the lower section and the rest sections are all rectangular frames which are absent of one edge, and simultaneously the size of the lower section is larger than that of the rest section, the lower section is a base section of the vertical lift of the rest sections, and the rest sections are vertically lifted level by level in the lower section after the rest sections are gradually arranged in the lower section, an upper section (1) contains a day vehicle, the upper section and the day vehicle are locked by a locking device which is arranged at the lower section after the upper section is arranged in the lower section, the front lower parts of the upper section and the rest sections to be lifted are provided with hanging pin ears (1A), and the front upper parts of the rest sections to be lifted are provided with hanging pin ears (1B), and after the hanging pin ears of the front upper part of the sections to be lifted are connected with hanging pin ears of the front lower part of sections which are lifted in a hanging mode, the sections to be lifted can be wound around the hanging connection point of the hanging pin ears from a horizontal swing state to a vertical state to enter the inner part of opening gears of the lower section. Three different rope penetration fashions are provided according to different situations. Because the utility model has the advantage of simple installation lift fashion, the utility model saves occupation areas and reduces well drilling costs.

Description

The trepan derrick that new vertical is installed and risen
Technical field
The utility model belongs to oil-well drilling equipment, the trepan derrick that particularly a kind of new vertical is installed and risen.
Background technology
The low level of present domestic use is installed and is revolved the lift-type derrick, though solved the high-altitude installation question, but brought the floor mounted workload big, the rig floor space is big, the problem that drilling cost is high.
Summary of the invention
The drilling derrick that the utility model aims to provide a kind of vertical installation and hoists.Specifically, a kind of vertical installation and the drilling derrick that hoists, it comprises that hypomere and all the other wait each section that hoists, and hypomere and all the other each sections are and lack rectangle frame on one side, and the while, the hypomere size was greater than all the other each section sizes; Hypomere is the section of foundation that other each section vertically hoists, and all the other each sections will vertically rise in hypomere behind the hypomere of progressively packing into step by step; Epimere (1) contain overhead traveling crane and the hypomere of packing into after in, hypomere is provided with locking device, with the two locking; Wait that at epimere and other preceding bottom of section of hoisting is provided with extension pin ear (1A), wait at other that section of hoisting front upper part is provided with and hang pin ear (1B), wait after waiting the section of hoisting front upper part and the extension pin ear-hang of the preceding bottom of the section of hoisting having connect that the section of hoisting can articulate around the two a little from the horizontal hunting to the plumbness, to enter hypomere and open in the shelves; The hypomere top is provided with assembly pulley (6), a termination movable pulley (7) of derrick big lifting rope (5) and pass assembly pulley after make its other end receive section to be hoisted after (6); One of lift rope (4) terminates on the rig floor, and the other end passes movable pulley (7) and is wrapped on the reel (8) of lifting means; Spur the big lifting rope section to be hoisted that in hypomere, vertically hoists by lift rope during the reel elevator.
Big lifting rope (5) one is terminated at pars infrasegmentalis to be risen, and after passing the assembly pulley (6) at hypomere top, its other end is wrapped on the reel (8), during the reel elevator, directly by big lifting rope vertical rise section to be hoisted in hypomere.
Two of big lifting rope (10) terminated at hypomere or wait the bottom of the section of hoisting both sides, big rope passes the pulley (15) that passes the pars infrasegmentalis of waiting to hoist behind the pulley (11) at hypomere top again, and the middle part of will restricting greatly hangs on drilling well hook block or the tourist bus (16); Winch (14) is when starting, and the big rope of drilling well (12) makes with tourist bus (16) pulling big lifting rope (10) by overhead traveling crane (13) and waits the section of hoisting vertical rise in hypomere.
For the bigger derrick of width dimensions, every section derrick is carried on the back beam (17) punishment from it and is left and right two halves, connects with bearing pin (18) between two halves.
Big lifting rope (10) can be two, and one of every rope terminates at hypomere or pars infrasegmentalis to be hoisted, and big rope passes the pulley (15) that passes the pars infrasegmentalis of waiting to hoist behind the pulley (11) at hypomere top again, and the other end of will restricting greatly ties up on tourist bus or the hook block (16).
Mode is simple because installation hoists for the utility model, can save floor occupying area, and reduces drilling cost.
Description of drawings
Fig. 1, Fig. 2, Fig. 3, Fig. 4,, Fig. 5 is the derrick installation schematic diagram.
Fig. 4 ' is the A-A view of Fig. 4.
Fig. 6 (A) is whole section derrick hypomere sectional view
Fig. 6 (B) is whole all the other each section sectional views of waiting to hoist of section derrick.
Fig. 7 (A) is a split section derrick hypomere sectional view.
Fig. 7 (B) is all the other each section sectional views of waiting to hoist of split section derrick.
Fig. 8 (A) is a derrick hypomere travel position sectional view.
Fig. 8 (B) is all the other each section travel position sectional views of waiting to hoist of derrick.
The specific embodiment
The trepan derrick that a kind of new vertical is installed and risen is shown in figure one.Its installation process is with lifting appliance hypomere (3) to be lifted the diagram plumbness earlier.Hypomere is the section of foundation that other each section vertically hoists, and all the other each sections will vertically rise in hypomere behind the hypomere of progressively packing into step by step.Epimere (1) contains overhead traveling crane, pack in the hypomere by shown position after, hypomere is provided with locking device, with the two locking.To go up stage casing (2) and sling by level (dotted portion among Fig. 1), after its top and the preceding bottom of epimere are articulated, last stage casing will articulate spot wobble around the two and enter hypomere to plumbness and open in the crotch, will go up the stage casing and epimere connects.Epimere also can connect before lifting with last stage casing, vertically hangs in the hypomere then, and with the two locking.The hypomere top is provided with assembly pulley (6), a termination movable pulley (7) of derrick big lifting rope (5) and pass assembly pulley (6) after its other end is received wait the bottom of the section of hoisting (Fig. 1 is last stage casing).One of lift rope (4) terminates on the rig floor, and the other end passes movable pulley (7) and is wrapped on the reel (8) of lifting means, and lifting means can utilize winch drum or cat head, sand reel etc.Open the locking device on the hypomere (3), when starting reel (8) elevator, lift rope (4) makes epimere (1) and last stage casing (2) vertical rise in hypomere (3) by movable pulley (7) pulling big lifting rope (5).When being raised to the epimere original position, last stage casing as shown in Figure 2, will go up the locking of stage casing and hypomere.Using the same method hangs in stage casing (9) in the hypomere crotch, and connects with epimere, and vertical rise the again uses the same method.Finish the installation of a whole set of each section of derrick successively and hoist.
Shown in Figure 3, be that big lifting rope (5) is terminated at pars infrasegmentalis to be risen, and after passing the assembly pulley (6) at hypomere top, its other end be wrapped on the reel (8), during the reel elevator, directly by big lifting rope vertical rise section to be hoisted in hypomere.
The lifting method of Fig. 1 is laborsaving.The lifting method of Fig. 3 is simple in structure.
The wire rope handling method of Fig. 4 and Fig. 4 ' is, two of big lifting rope (10) is terminated at the bottom of hypomere both sides, big rope passes the pulley (15) that passes the pars infrasegmentalis of waiting to hoist behind the pulley (11) at hypomere top again, and the middle part of will restricting greatly hangs over drilling well hook block (or tourist bus) (16) and goes up (seeing that A is to diagrammatic sketch).Winch (14) is when starting, and the big rope of drilling well (12) makes with tourist bus (16) pulling big lifting rope (10) by overhead traveling crane (13) and waits the section of hoisting vertical rise in hypomere.
Whenever hoisted after one section, hook block (or tourist bus) has been fallen, hung in next section to be hoisted, hoisted by Fig. 4 method lanyard again, finished the installation of a whole set of each section of derrick successively and hoist by hanging method shown in Figure 1.
Fig. 4 is when finishing in Fig. 5 after epimere or epimere and last stage casing hoist, with the fag end reconfiguration in the method for waiting that the section of hoisting lower end hoists.Big lifting rope wire rope handling state is constant.This method can be laborsaving half, the hook block stroke doubles.
The big lifting rope of Fig. 4, Fig. 5 (10) can be two, and one of every rope terminates at down pars infrasegmentalis (shown in Figure 4) or pars infrasegmentalis to be hoisted (shown in Figure 5), and the other end passes pulley (11) and pulley (15) is connected on the hook block (or tourist bus) (16).
For the structure of all each sections of suit telescope pole that reach other as previously mentioned, a kind of is all-in-one-piece (seeing Fig. 6, whole section derrick cross section), is applicable to the less derrick of width B (b) size.
For the larger-size derrick of width B (b),, adopted split-type structural whole Transporting scheme (seeing Fig. 7, split section derrick cross section) in order to solve every section whole Transporting problem.Every section derrick is carried on the back beam (17) punishment from it and is left and right two halves, remove other connector between two halves during transportation, keep the perpendicular bearing pin (18) of connection between two halves, second half connects perpendicular bearing pin (18) rotation and is fastened on one (seeing Fig. 8, the travel position cross section) around it relatively with half of derrick section.

Claims (5)

1, the drilling derrick of a kind of new vertical installation and rise, it is characterized in that comprising that hypomere and all the other wait each section that hoist, hypomere and all the other each sections are and lack rectangle frame on one side, and each section vertically hoists the hypomere size of section of foundation greater than all the other each section sizes as other simultaneously; Epimere (1) contain overhead traveling crane and the hypomere of packing into after in, hypomere is provided with the locking device with the two locking; Wait at epimere and other that preceding bottom of section of hoisting is provided with and hang pin ear (1A), wait at other that section of hoisting front upper part is provided with and hang pin ear (1B), wait the section of hoisting front upper part and the extension pin ear-hang of the preceding bottom of the section of hoisting connect; The hypomere top is provided with assembly pulley (6), a termination movable pulley (7) of derrick big lifting rope (5) and pass assembly pulley after make its other end receive section to be hoisted after (6); One of lift rope (4) terminates on the rig floor, and the other end passes movable pulley (7) and is wrapped on the reel (8) of lifting means.
2, a kind of new vertical drilling derrick installing and rise is characterized in that comprising that hypomere and all the other wait each section that hoists, and hypomere and all the other each section cross sections are and lack rectangle frame on one side, and the while, the hypomere size was greater than all the other each section sizes; Progressively pack into as other each section of all the other each sections vertically hoists and vertically rises step by step within it behind the hypomere of section of foundation; Epimere (1) contain overhead traveling crane and the hypomere of packing in after, hypomere is provided with can be with the locking device of the two locking; Wait at epimere and other that preceding bottom of section of hoisting is provided with and hang pin ear (1A), wait at other that section of hoisting front upper part is provided with and hang pin ear (1B), wait the section of hoisting front upper part and the extension pin ear-hang of the preceding bottom of the section of hoisting connect; The hypomere top is provided with assembly pulley (6), and big lifting rope (5) terminates at pars infrasegmentalis to be risen, and after passing the assembly pulley (6) at hypomere top, its other end is wrapped on the reel (8).
3, a kind of new vertical drilling derrick installing and rise is characterized in that comprising that hypomere and all the other wait each section that hoists, and hypomere and all the other each sections are and lack rectangle frame on one side, and the while, the hypomere size was greater than all the other each section sizes; All the other each sections are progressively packed into and are vertically risen step by step in hypomere behind the hypomere of the section of foundation that each section vertically hoists as other; Epimere (1) contain overhead traveling crane and the hypomere of packing in after, hypomere is provided with can be with the locking device of the two locking; Wait at epimere and other that preceding bottom of section of hoisting is provided with and hang pin ear (1A), wait at other that section of hoisting front upper part is provided with and hang pin ear (1B), wait the section of hoisting front upper part and the extension pin ear-hang of the preceding bottom of the section of hoisting connect; Two of big lifting rope (10) terminates at hypomere or waits the bottom of the section of hoisting both sides, and big rope passes the pulley (15) that passes the pars infrasegmentalis of waiting to hoist behind the pulley (11) at hypomere top again, and big rope middle part hangs on drilling well hook block or the tourist bus (16); And the big rope of drilling well (12) makes with tourist bus (16) pulling big lifting rope (10) by overhead traveling crane (13) and waits the section of hoisting vertical rise in hypomere.
According to the drilling derrick of claim 1 or 2 or 3 described new vertical installations and rise, it is characterized in that 4, every section derrick is carried on the back beam (17) punishment from it and is left and right two halves, uses bearing pin (18) connection between two halves for the bigger derrick of width dimensions.
5, the new vertical according to claim 3 drilling derrick installing and hoist, it is characterized in that big lifting rope (10) can be two, one of every rope terminates at hypomere or pars infrasegmentalis to be hoisted, big rope passes the pulley (15) that passes the pars infrasegmentalis of waiting to hoist behind the pulley (11) at hypomere top again, and the other end of restricting greatly ties up on tourist bus or the hook block (16).
CN 200420041616 2004-02-17 2004-02-17 New vertically mounting and lifting drilling bit derrick Expired - Lifetime CN2756806Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420041616 CN2756806Y (en) 2004-02-17 2004-02-17 New vertically mounting and lifting drilling bit derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420041616 CN2756806Y (en) 2004-02-17 2004-02-17 New vertically mounting and lifting drilling bit derrick

Publications (1)

Publication Number Publication Date
CN2756806Y true CN2756806Y (en) 2006-02-08

Family

ID=35965192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420041616 Expired - Lifetime CN2756806Y (en) 2004-02-17 2004-02-17 New vertically mounting and lifting drilling bit derrick

Country Status (1)

Country Link
CN (1) CN2756806Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632085A (en) * 2013-11-13 2015-05-20 中国石油化工股份有限公司 Derrick lifting holding pole for oil well and lifting method
CN104777009A (en) * 2015-04-04 2015-07-15 内蒙古农业大学 Rock-core sampler for bottom mud of lakes and oceans and use method thereof
WO2018107557A1 (en) * 2016-12-16 2018-06-21 四川宏华石油设备有限公司 Vertical lifting drilling rig
CN109736716A (en) * 2018-12-14 2019-05-10 大连中远海运重工有限公司 Derrick well system installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632085A (en) * 2013-11-13 2015-05-20 中国石油化工股份有限公司 Derrick lifting holding pole for oil well and lifting method
CN104777009A (en) * 2015-04-04 2015-07-15 内蒙古农业大学 Rock-core sampler for bottom mud of lakes and oceans and use method thereof
WO2018107557A1 (en) * 2016-12-16 2018-06-21 四川宏华石油设备有限公司 Vertical lifting drilling rig
US11028651B2 (en) 2016-12-16 2021-06-08 Sichuan Honghua Petroleum Equipment Co., Ltd. Drilling rig
CN109736716A (en) * 2018-12-14 2019-05-10 大连中远海运重工有限公司 Derrick well system installation method

Similar Documents

Publication Publication Date Title
EP1854759A2 (en) Boom hoisting device of a crane
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN2756806Y (en) New vertically mounting and lifting drilling bit derrick
CN214989776U (en) Bridge crane with anti-swing function
CN103556812A (en) Installation structure of attached lifting scaffold electric hoist
CN207061699U (en) A kind of large-scale tower crane tower section introduces jacking system
CN2270772Y (en) Lattice framed structure integral lifting device
CN206128755U (en) Vehicle fixture for intelligent stereo garage
CN214527827U (en) Auxiliary hanging bracket for traffic road and bridge construction
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN210029781U (en) Anti-shaking device for hoisting
CN211733697U (en) Horizontal type suspender driving machine for simultaneously lifting single winding drum and multiple ropes of performance stage
CN203547112U (en) Electric hoist installation structure for attached lifting scaffold
CN210260980U (en) Pole-mounted circuit breaker mounting device
CN206091466U (en) Vehicle fixture for intelligent stereo garage
CN217708704U (en) Self-climbing type roof beam lifting device used in hoistway
CN210973649U (en) Lifting device for construction machinery
CN220564074U (en) Hanging device for constructional engineering
CN105438958B (en) Rotating lifting steel-fastening structure component boom hoisting
CN102874680B (en) Device and method for hoisting components in dead zone of tower crane
CN211056554U (en) Small-size lifting device is used in big glass construction of high-rise building exterior window
CN212246037U (en) C-shaped lifting hook device
CN214570084U (en) Lifting appliance for steel structure installation
CN2682048Y (en) Self-lifting section, self-lifting section lifting device and self-lifting type section expansion device
CN215558364U (en) Automobile parts hoists conveyer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Baoji Hongxiang Petroleum Electromechanical Technology Institute

Assignor: Liu Yujie

Contract record no.: 2011610000084

Denomination of utility model: New vertically mounting and lifting drilling bit derrick

Granted publication date: 20060208

License type: Exclusive License

Record date: 20110707

EC01 Cancellation of recordation of patent licensing contract

Assignee: Baoji Hongxiang Petroleum Electromechanical Technology Institute

Assignor: Liu Yujie

Contract record no.: 2011610000084

Date of cancellation: 20120601

CX01 Expiry of patent term
CX01 Expiry of patent term

Expiration termination date: 20140217

Granted publication date: 20060208