CN2752425Y - High-efficiency wire-line workover unit - Google Patents

High-efficiency wire-line workover unit Download PDF

Info

Publication number
CN2752425Y
CN2752425Y CNU2004201206592U CN200420120659U CN2752425Y CN 2752425 Y CN2752425 Y CN 2752425Y CN U2004201206592 U CNU2004201206592 U CN U2004201206592U CN 200420120659 U CN200420120659 U CN 200420120659U CN 2752425 Y CN2752425 Y CN 2752425Y
Authority
CN
China
Prior art keywords
utility
model
efficiency
line
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2004201206592U
Other languages
Chinese (zh)
Inventor
徐宏权
管恩东
胡延民
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CNU2004201206592U priority Critical patent/CN2752425Y/en
Application granted granted Critical
Publication of CN2752425Y publication Critical patent/CN2752425Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a high-efficiency wire-line workover unit used for carrying out job execution for technology service wells for steaming operation, fracturing, etc., which is composed of a main body (1), 2 (1/2), a short joint (2) and a coupling (3). The utility model has the advantages of simple structure, convenience and practicability, two construction tasks of cleaning bur and dirt for the bushings for oil wells and sand surface exploration can be completed smoothly with high efficiency nothing remains but to disassemble a pipe column once, the construction efficiency is increased and the labor intensity of workers is lightened.

Description

A kind of efficient drift size gauge tool
Technical field:
The utility model relates to a kind of downhole tool that technological measure wells such as vapour, pressure break carry out job execution that is used to annotate.
Background technology:
Annotate technological measure wells such as vapour, pressure break when carrying out job execution, must carry out the casing inner diameter drifting earlier and visit sand face twice important procedure.Whether at present, on-the-spot common way was lowered to drift size gauge tool before this oil well casing was carried out drifting, remove the burr on the Jing Neitaoguanbi and implement sleeve pipe intact, also will trip out former tubing string then and be lowered to light pipe and visit the sand face.Like this, need remove tubing string twice, not only increase the labour intensity of operating worker, and spended time is long, operating efficiency is low, and the construction cost height influences the raising of oil well ordinary production and economic benefit.
Summary of the invention:
The purpose of this utility model is to provide a kind of can simplify service shaft job execution operation, save the efficient drift size gauge tool of a large amount of human and material resources, financial resources.
The utility model is to realize like this." box cupling is connected with 2  with body with screw thread respectively for this kind drift size gauge tool is by drift size gauge tool body, 2  " pipe nipple and box cupling are formed, and one 2  are set in the drift size gauge tool body " pipe nipple, pipe nipple upper and lower end.During use, drift size gauge tool body upper end is connected with corresponding tubing string, 2  " connect the tail pipe of respective length under the box cupling.During construction operation, along with the intensification of underground work tubing string, this drift size gauge tool body part carries out scraping to the oil well casing wall, removes the foul in burr and the sleeve pipe, and implements sleeve pipe and whether meet standard-required.Needn't rise under the lower tubular column situation, with this drift size gauge tool with down connect the tail pipe co-operation and arrive sand face or artificial bottom of a well at last, can further finish the construction task of spy sand face.
The utility model is simple in structure, practical and convenient, adopt this drift size gauge tool only to need one trip can finish the clear burr of oil well casing, dirt drifting and two construction tasks of spy sand face smoothly, efficiently, improve efficiency of construction greatly, alleviate labor strength, save a large amount of operating costs, be suitable for and apply.
Description of drawings:
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment:
The utility model is provided by following examples, is illustrated below in conjunction with accompanying drawing.
As shown in the figure, " box cupling 3 is connected with 2  with body 1 with screw thread respectively for the utility model is by body 1,2  " pipe nipple 2 and box cupling 3 are formed, and its assembled relation is as follows: one 2  are set in the body 1 " pipe nipple 2, pipe nipple 2 upper and lower ends.Wherein, body 1 is the up-small and down-big hollow round tube body of diameter, and its material specification is identical with normally used drift size gauge tool.2  " pipe nipple 2 and box cupling 3 can adopt 2  respectively " tubing nipple and box cupling.

Claims (1)

1, a kind of efficient drift size gauge tool is by body (1), 2  " pipe nipple (2) and box cupling (3) are formed, and it is characterized in that: body is provided with one 2  in (1) " pipe nipple (2), " box cupling (3) is connected pipe nipple (2) upper and lower end with body (1) and 2  with screw thread respectively.
CNU2004201206592U 2004-12-15 2004-12-15 High-efficiency wire-line workover unit Expired - Fee Related CN2752425Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2004201206592U CN2752425Y (en) 2004-12-15 2004-12-15 High-efficiency wire-line workover unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2004201206592U CN2752425Y (en) 2004-12-15 2004-12-15 High-efficiency wire-line workover unit

Publications (1)

Publication Number Publication Date
CN2752425Y true CN2752425Y (en) 2006-01-18

Family

ID=35913834

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2004201206592U Expired - Fee Related CN2752425Y (en) 2004-12-15 2004-12-15 High-efficiency wire-line workover unit

Country Status (1)

Country Link
CN (1) CN2752425Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127970A (en) * 2023-10-26 2023-11-28 四川圣诺油气工程技术服务有限公司 Liquid detection sampling open well integrated operation tool and use method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127970A (en) * 2023-10-26 2023-11-28 四川圣诺油气工程技术服务有限公司 Liquid detection sampling open well integrated operation tool and use method
CN117127970B (en) * 2023-10-26 2024-01-12 四川圣诺油气工程技术服务有限公司 Liquid detection sampling open well integrated operation tool and use method

Similar Documents

Publication Publication Date Title
CN202273618U (en) Reliable releasing running tool
CN204827314U (en) Borehole operation leads to integrated instrument of scraping
CN2752425Y (en) High-efficiency wire-line workover unit
CN203081349U (en) Drill rod screw-off mechanism
CN204920823U (en) Oil and gas drilling is with anti - circulating air hammer double -walled conversion nipple joint
CN201068760Y (en) Oilfield down-hole salvager
CN201068761Y (en) Down-hole salvaging tool
CN201047279Y (en) On-off connector sanding machines
CN200940451Y (en) Sleeve hydraulic variable diameter centralizer
CN208900027U (en) A kind of flexible pressuring device suitable for radial bore operation
CN205154082U (en) Novel double entry fishing tool
CN205521106U (en) Nut extracting tool
CN2450374Y (en) Strong sand washing device
CN206409212U (en) Multistage chain of rings Cut Block blocking device
CN2906039Y (en) Underground broken pipes dragging tools
CN103670279B (en) Multilateral Wells construction tool
CN2534360Y (en) Downhole mechanical fishing spear
CN205503077U (en) Multi -purpose lance that drags for of down -hole junk
CN203559816U (en) Portable rat-hole scabbard for well drilling and repairing
CN201045281Y (en) Well bore guiders
CN205689154U (en) A kind of drifting pipe cleaning integration tool
CN203499612U (en) Fishing spear special for packer
CN201218065Y (en) Special pincers for telescopic pumping rod
CN202866721U (en) Compound combination washover catch sleeve
CN206942699U (en) A kind of automatic well workover lift hydraulic tongs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee