CN2752237Y - Arrangement for moving integral petroleum drilling machine - Google Patents

Arrangement for moving integral petroleum drilling machine Download PDF

Info

Publication number
CN2752237Y
CN2752237Y CN 200420061826 CN200420061826U CN2752237Y CN 2752237 Y CN2752237 Y CN 2752237Y CN 200420061826 CN200420061826 CN 200420061826 CN 200420061826 U CN200420061826 U CN 200420061826U CN 2752237 Y CN2752237 Y CN 2752237Y
Authority
CN
China
Prior art keywords
jack
utility
supporting seat
model
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420061826
Other languages
Chinese (zh)
Inventor
田雨
刘盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONGHUA CO Ltd GUANGHAN CHUANYOU
Original Assignee
HONGHUA CO Ltd GUANGHAN CHUANYOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONGHUA CO Ltd GUANGHAN CHUANYOU filed Critical HONGHUA CO Ltd GUANGHAN CHUANYOU
Priority to CN 200420061826 priority Critical patent/CN2752237Y/en
Application granted granted Critical
Publication of CN2752237Y publication Critical patent/CN2752237Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to an arrangement for moving an integral petroleum drilling machine, which is used for the integral movement of the drilling machine in a well site in a petroleum drilling well and a natural gas drilling well. The utility model belongs to the technical field of a petroleum drilling extracting device. The utility model is composed of a top lift moving mechanism of the drilling machine and a draw moving mechanism. The utility model comprises a top lift hydraulic oil cylinder, a supporting seat, a hydraulic winch, a pulley group, a walking pulley and a swing disk. The supporting seat is provided with an installation position and a swing position which can be disassembled to realize the integral movement of the drilling machine in a longitudinal direction, a transversal direction and an oblique direction. The installation position and the swing position are mutually vertical to two directions. The utility model changes the problems that the integral movement of the prior art needs carrying out in a guide rail, operation of the integral movement is complicated and movement efficiency is low. The utility model can satisfy the requirements of the integral movement of multiple well position drilling machines of cluster type wells at drilling time.

Description

The whole mobile device of a kind of oil-well rig
Technical field: the whole mobile device of a kind of oil-well rig, be used for the petroleum drilling machine and moving with the well site single-piece, belong to oil drilling and extracting equipment manufacturing technology field.
Background technology: the whole mobile problem of multi-well location of rig in the well site when boring cluster wells in the oil and gas well drilling in order to solve, existing technology is to utilize hydraulic ram to carry out the step wise translation, promptly with the hydraulic ram push-and-pull rig is moved by hydraulic ram after with the rig lifting, prior art can actv. moves to rig integral body the position of new well location; The shortcoming of prior art is: owing to move wheel is to carry out on guide rail, so existing stepwise type borer motion device miles of relative movement each time is very limited, when carrying out the rig translation, need repeatable operation hydraulic ram lifting and translation, could move into place by rig, efficient is lower, simultaneously, moving of prior art must be used guide rail, and range of use also is restricted.
The utility model is the shortcoming at prior art, utilizes winch and fixed object to draw mobile principle, designs the whole mobile device of a kind of oil-well rig.
Summary of the invention: the utility model comprises traction travel mechanism and jacking support travel mechanism, traction travel mechanism is installed on the supporting seat that is fixed on rig substructure, comprise hydraulic wireline winch, assembly pulley, pull line, assembly pulley is fixed on the fixed object or earth anchor in well site, and the hydraulic wireline winch that is arranged on the supporting seat connects assembly pulley by pull line; Jacking is supported travel mechanism below supporting seat, comprise jack-up hydraulic ram, wobble-plate and walking coaster, the top of jack-up hydraulic ram withstands in the wobble-plate, wobble-plate is connected with supporting seat, the bottom of jack-up hydraulic ram is fixed on the walking coaster, and when mobile, picoliter plays the jacking hydraulic ram, make the rig built on stilts, start hydraulic wireline winch and just rig can be pulled to new position.The utility model has the advantages that: the walking coaster does not have fixing guide rail, can answer this in ground taxi, on position of setting and distance, rig integral body is moved into place, because the effect of wobble-plate can make the relative supporting base rotating certain angle of rig, be convenient to moving of rig.
Marginal data:
Fig. 1 is a structural representation of the present utility model.
Specific embodiments: provide embodiment of the present utility model below in conjunction with accompanying drawing: the utility model comprises traction travel mechanism and jacking supporting travel mechanism, traction travel mechanism comprises hydraulic wireline winch 3, assembly pulley 7, pull line 1, hydraulic wireline winch 3 is installed in the top of supporting seat 10 by bearing pin, supporting seat 10 is installed in the connection earrings 11 that is provided with on the rig substructure 4 by bearing pin, on four faces of rig substructure 4, all be provided with and connect earrings 11, assembly pulley 7 is fixed on the fixed object 5 or earth anchor in well site, the hydraulic wireline winch 3 that is arranged on the supporting seat 10 connects assembly pulley 7 by pull line 1, jacking supporting travel mechanism is below supporting seat 10, comprise jack-up hydraulic ram 9, wobble-plate 2 and walking coaster 8, wobble-plate is arranged between jack-up hydraulic ram 9 and the supporting seat 10, the position that jack-up hydraulic ram 9 is set at supporting seat 10 and the centre of wobble-plate 2 have the hole of an identical size, the top of jack-up hydraulic ram 9 upwards also has a jack, be passed down through the jack that wobble-plate 2 has bearing pin insertion jack-up hydraulic ram 9 tops from the hole of supporting seat 10, the bottom of jack-up hydraulic ram 9 is equipped with the walking coaster; When mobile, determine mobile direction earlier, with the wheel of walking coaster 8 towards the direction that moves, operate jack-up hydraulic ram 9 then earlier with rig jack-up, make rig substructure 4 leave ground 6 certain height, the control cock of operating hydraulically operated then winch 3 makes hydraulic wireline winch 3 regain pull line 1 and draws, make the support lower edge lead of many covers jack-up hydraulic ram that oil-well rig installs on base move to the desired location, last operation jack-up hydraulic ram 9 puts down the integral body of promptly finishing rig with rig and moves; If the direction of Yi Donging is 90 ° of angles with the last direction that moves next time, just earlier be installed in supporting seat 10 on the connection earrings 11 that is provided with on rig substructure 4 two other faces by bearing pin, the jackings supporting travel mechanisms that will be arranged on the traction travel mechanism above the supporting seat 10 simultaneously and be arranged on below the supporting seat 10 also move to corresponding position, and then implement jacking and the step that moves can move rig to other both direction; In order to realize moving on the different directions, the position of the installation hydraulic wireline winch 3 and the assembly pulley 7 of two different directions also can be set on supporting base 10, hydraulic wireline winch 3 can be installed towards two different directions with assembly pulley 7, like this, also can realize moving of different directions as long as change the working direction of walking coaster 8; In addition, be arranged on the top of jack-up hydraulic ram 9 and the wobble-plate 2 between supporting seat 10 bottoms and can be used as the adapter plate that relatively rotates certain angle, make the walking coaster 8 relatively supporting base 10 turn an angle, before moving, regulate the angle of coaster, rig can move along the direction of needs, and the well site fixture can be the objects such as earth anchor in the well site.

Claims (3)

1. the whole mobile device of oil-well rig comprises traction travel mechanism and jacking supporting travel mechanism, it is characterized in that:
A. the hydraulic wireline winch of described traction travel mechanism be installed in supporting seat above, assembly pulley is connected with hydraulic wireline winch by pull line;
The jack-up hydraulic ram of b. described jacking supporting travel mechanism be arranged on supporting seat below, wobble-plate is arranged between jack-up hydraulic ram and the supporting seat, there is the hole of an identical size centre that the position of jack-up hydraulic ram and wobble-plate are set at supporting seat, the top of jack-up hydraulic ram upwards has a jack, be passed down through the jack that wobble-plate has a bearing pin insertion jack-up hydraulic ram top from the hole of supporting seat, the bottom of jack-up hydraulic ram is equipped with the walking coaster.
2. the whole mobile device of a kind of oil-well rig according to claim 1 is characterized in that: be provided with the installation hydraulic wireline winch of two different directions and the position of assembly pulley on described supporting base.
3. the whole mobile device of a kind of oil-well rig according to claim 1 is characterized in that: all be provided with the connection earrings on four faces of rig substructure.
CN 200420061826 2004-10-28 2004-10-28 Arrangement for moving integral petroleum drilling machine Expired - Fee Related CN2752237Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420061826 CN2752237Y (en) 2004-10-28 2004-10-28 Arrangement for moving integral petroleum drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420061826 CN2752237Y (en) 2004-10-28 2004-10-28 Arrangement for moving integral petroleum drilling machine

Publications (1)

Publication Number Publication Date
CN2752237Y true CN2752237Y (en) 2006-01-18

Family

ID=35913646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420061826 Expired - Fee Related CN2752237Y (en) 2004-10-28 2004-10-28 Arrangement for moving integral petroleum drilling machine

Country Status (1)

Country Link
CN (1) CN2752237Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230358A (en) * 2011-06-03 2011-11-02 中国石化集团江汉石油管理局第四机械厂 Integrally moving and cluster well switching device of drilling machine
CN106639894A (en) * 2016-12-27 2017-05-10 天时集团能源有限公司 Stepping type self-balancing derrick workover rig

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230358A (en) * 2011-06-03 2011-11-02 中国石化集团江汉石油管理局第四机械厂 Integrally moving and cluster well switching device of drilling machine
CN106639894A (en) * 2016-12-27 2017-05-10 天时集团能源有限公司 Stepping type self-balancing derrick workover rig
CN106639894B (en) * 2016-12-27 2018-08-14 天时集团能源有限公司 Step-by-step movement self-balancing derrick workover rig

Similar Documents

Publication Publication Date Title
CN202321556U (en) Integral translation device for drilling machine
CN103669351B (en) Full-stroke hole-leading hydraulic static pile driver
CN102304922B (en) Full-pile casing construction device
CN200975217Y (en) Canula drilling machine
CN103603601A (en) Inclined and vertical well drilling machine
CN201671551U (en) Inclined oil well drilling machine base
CN201990456U (en) Whole translation device for drilling machine
CN203716150U (en) Drilling press pile combined type pile machine
CN201193478Y (en) Drivage face emulsion drill against outburst
CN2752237Y (en) Arrangement for moving integral petroleum drilling machine
CN106149723A (en) Civil engineering piling machine
CN205063812U (en) Novel drilling machine
CN107420041B (en) Full hydraulic power head core drill without drilling tower
CN202227346U (en) Construction device for full casing construction method
CN106812460A (en) Large oilfield drilling equipment
CN109236211A (en) A kind of production rig
CN110029946B (en) Installation method of vertical lifting derrick
CN201186876Y (en) Artificial well site host platform mobile device
CN201013249Y (en) Novel oil-well rig lifting foundation
CN2931755Y (en) Wheeled type rotary digging driller
CN201650134U (en) Drilling rig telescopic mast structure for drilling equipment
CN209940356U (en) Jack device with torsion function
CN112459700A (en) Well-digging and well-washing integrated equipment for building construction
CN201943623U (en) Oil pipe hydraulic jacking struck releasing device for ocean oil gas producing platform well repairing
CN2746110Y (en) Integrated device of blowout preventer moving and driller room lifting for petroleum drilling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060118

Termination date: 20111028