CN2739272Y - Binding-construction-convenient reinforcing steel - Google Patents
Binding-construction-convenient reinforcing steel Download PDFInfo
- Publication number
- CN2739272Y CN2739272Y CN 200420010644 CN200420010644U CN2739272Y CN 2739272 Y CN2739272 Y CN 2739272Y CN 200420010644 CN200420010644 CN 200420010644 CN 200420010644 U CN200420010644 U CN 200420010644U CN 2739272 Y CN2739272 Y CN 2739272Y
- Authority
- CN
- China
- Prior art keywords
- phi
- rib
- bamboo joint
- paths
- convenient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a new pattern steel bar which is convenient for the laying operation. The outer surface of the steel bar is provided with bamboo joint ribs 2, 3, 4, 5, 6 with the interval of 5cm and the crescent rib 7 is arranged among each bamboo joint rib which is non-intersect into 60 degrees with the main rib. The corresponding number of paths of the crescent ribs are arranged according to the bar diameters which vary in size. The phi 10, phi 12 and phi 14 are provided with five paths. The phi 16, phi 18, phi 20 and phi 22 are provided with four paths. The phi 25and phi 28are provided with three paths. The phi 32, phi 36 and phi 40 are provided with two paths. When working, laborers make no use of equinox scribed line and can select directly conveniently according to the distances which are needed to band. The distance between the bamboo joint rib 2 and the bamboo joint rib 3 is 5cm. The distance between the bamboo joint rib 2 and the bamboo joint rib 4 is 10cm. The distance between the bamboo joint rib 2 and the bamboo joint rib 5 is 15cm. The distance between the bamboo joint 2 and the bamboo joint rib 6 is 20cm. So the construction of the steel bar can be convenient.
Description
Affiliated technical field
The utility model relates to a kind of construction of being more convenient for, and especially more can embody the new reinforcing steel bar of its superiority in the bigger civil engineering of amount of reinforcement.
Background technology
At present, the hot-rolled reinforced bar of China's production is that cross rib becomes 60 ° of angle non-intersect crescent cross rib notched barss with main rib.In work progress, the workman need be according to the mesh size of beam, tie muscle spacing or wall, slab muscle, to reinforcing bar with chalk rule branch, colligation then.Because the workman draws mark to each root reinforcing bar, particularly joist, plate muscle, add that the mark that chalk is done is easy to come off in handling process, so workmanship is difficult to be guaranteed, and line is very time-consuming again, effort, and especially in the middle of the modern high-rise building construction, each procedure operation is all raced against time, present traditional line mode needs of development that have been out of step with the times press for a kind of need not the line and can make things convenient for the reinforcing bar binding technology to occur.
Summary of the invention
In order to overcome the problem that existing reinforcing bar is not easy to constructing operation, this appearance design provides a kind of new reinforcing steel bar.This new reinforcing steel bar can not only convenient construction, and more can guarantee construction quality, can also reduce the pollution of chalk dust, saves time, laborsaving, has improved work efficiency of workers, has shortened the duration of construction, and has not increased cost of production.
The technical scheme that its technical problem that solves the utility model adopts is: every interval 5cm design is intersected at an angle of 90 ring rib with main rib together on the scale notched bars, this rib height, wide the same with main rib, in each ring rib, establish original shape and become 60 ° of non-intersect crescent moon ribs in angle with main rib, its size, area is to guarantee that meeting GB requires to be as the criterion, the model of reinforcing bar, sign is located at the centre of ring rib, the quantity of crescent moon rib is respectively according to the bar diameter size in each ring rib: Ф 10, Ф 12, Ф 14 establishes 5 roads, Ф 16, Ф 18, Ф 20, Ф 22 establishes 4 roads, Ф 25, Ф 28 establishes 3 roads, and Ф 32, Ф 36, Ф 40 establishes 2 roads.Modal colligation spacing is: @100mm, @150mm, @200mm in the middle of architectural design, encryption place Shi @50mm, the spacing of other size is seldom used, so the workman need not rule and just can represent 5cm with one ring rib in work progress, two road ring ribs are represented 10cm, three road ring ribs are represented 15cm, and on behalf of 20cm, four road ring ribs come assembling reinforcement just to be easy to.If any the spacing of specific (special) requirements, by former method construction also not influence because the work of this part workload is considerably less comparatively speaking.Skilled bar bender's a glance just can be told the reinforcing bar model of all size, and selecting a few road of this usefulness ring rib in process of binding is lead-pipe cinch as spacing.
The beneficial effects of the utility model are: save crossed process one, reduce labour cost, steel manufacturer does not increase cost just can make reinforcing bar appreciate, unit in charge of construction can guarantee easily that more workmanship is (because of all there is the ring rib at each position of each root reinforcing bar, be convenient to colligation and location), environmental protection (reducing chalk pollutes) helps the reduction of erection time, also can be convenient to the examination (need not measure spacing with a yardstick) of supervisor.
Description of drawings
Below in conjunction with accompanying drawing and example this appearance design is further specified:
Fig. 1-the 1st, this appearance design φ 10, φ 12, φ 14 reinforcing bar front projection figure
Fig. 1-2 is this appearance design φ 10, φ 12, φ 14 reinforcing bar side projection figure
Fig. 2-the 1st, this appearance design φ 16, φ 18, φ 20, φ 22 reinforcing bar front projection figure
Fig. 2-the 2nd, this appearance design φ 16, φ 18, φ 20, φ 22 reinforcing bar side projection figure
Fig. 3-the 1st, this appearance design φ 25, φ 28 reinforcing bar front projection figure
Fig. 3-the 2nd, this appearance design φ 25, φ 28 reinforcing bar side projection figure
Fig. 4-the 1st, this appearance design φ 32, φ 36, φ 40 reinforcing bar front projection figure
Fig. 4-the 2nd, this appearance design φ 32, φ 36, φ 40 reinforcing bar side projection figure
The specific embodiment
In the reinforcing bar binding process of plate, wall, the reinforcing bar cutting length is not the integral multiple of 5cm sometimes, has the remnant less than 5cm.Because job specfication stipulates that the first road horizontal bar (vertical muscle) is apart from vertical muscle (horizontal bar) end 5cm, if tie up the first road horizontal bar (vertical muscle) so just get odd part when the remnant is arranged, when spacing is 5cm such as accompanying drawing 1-1, get ring rib together between the ring rib 2 and 3, when spacing is 10cm, as accompanying drawing 2-1, between the ring rib 2 and 4, get two road ring ribs, when spacing is 15cm, as accompanying drawing 3-1, between the ring rib 2 and 5, get three road ring ribs, when spacing is 20cm, as accompanying drawing 4-1, between the ring rib 2 and 6, get four road ring rib colligations.In wall, slab muscle process of binding, guarantee on the first road horizontal bar, vertical muscle or the major and minor muscle all colligation points at grade, the body of wall reinforcing bar is connecing when high, lap length will be consistent, cutting length is selected the integral multiple of 5cm for use, to guarantee all levels of corresponding ring rib.
In the reinforcing bar binding process of beam column, the first road stirrup will guarantee that all colligation points all on same plane, select the ring rib colligation of a few road of this usefulness according to design pitch again.The connecing height and will guarantee that also cutting length is a just integral multiple of 5cm of post muscle, overlap joint (welding) length is wanted unanimity.In a word, the workman is as long as skillfully hold once the spacing assembling reinforcement easily to four ring rib representatives.
Certainly, each ring rib also can be done round dot on former reinforcing bar, triangle comes mark, or the mark of other display scales is all within the utility model protection domain.
Claims (2)
1, a kind of new reinforcing steel bar of being convenient to colligation construction is characterized in that: every interval 5cm establishes together with main rib and intersects at an angle of 90 ring rib on the external surface of reinforcing bar.
2, according to the described new reinforcing steel bar of being convenient to colligation construction of claim 1, it is characterized in that: establish the non-intersect crescent moon rib that becomes 60 ° of angles of original shape and main rib in the middle of each ring rib, the quantity of crescent moon rib is looked the bar diameter size and is followed successively by:
φ10,
φ12,
φ14 establish 5 roads,
φ16,
φ18,
φ20,
φ22 establish 4 roads,
φ25,
φ28 establish 3 roads,
φ32,
φ36,
φ40 establish 2 roads.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420010644 CN2739272Y (en) | 2004-04-12 | 2004-04-12 | Binding-construction-convenient reinforcing steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420010644 CN2739272Y (en) | 2004-04-12 | 2004-04-12 | Binding-construction-convenient reinforcing steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2739272Y true CN2739272Y (en) | 2005-11-09 |
Family
ID=35354338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420010644 Expired - Fee Related CN2739272Y (en) | 2004-04-12 | 2004-04-12 | Binding-construction-convenient reinforcing steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2739272Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101929249A (en) * | 2010-08-10 | 2010-12-29 | 中铁一局集团有限公司 | Double line stream-line type round end entity pier cap steel bar overall binding construction method |
CN104563394A (en) * | 2014-11-06 | 2015-04-29 | 张军 | Rebar with length indicators |
-
2004
- 2004-04-12 CN CN 200420010644 patent/CN2739272Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101929249A (en) * | 2010-08-10 | 2010-12-29 | 中铁一局集团有限公司 | Double line stream-line type round end entity pier cap steel bar overall binding construction method |
CN101929249B (en) * | 2010-08-10 | 2012-04-25 | 中铁一局集团有限公司 | Double line stream-line type round end entity pier cap steel bar overall binding construction method |
CN104563394A (en) * | 2014-11-06 | 2015-04-29 | 张军 | Rebar with length indicators |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203213585U (en) | Scaffold tool for pouring concrete slab provided with saddle-shaped double curved surfaces | |
CN102301078A (en) | Assembled Wall Board | |
CN102535672A (en) | Novel hybrid huge anti-seismic structure and construction method thereof | |
CN116910854A (en) | Large-span arch concrete structure construction method based on digital construction | |
CN2739272Y (en) | Binding-construction-convenient reinforcing steel | |
CN202466883U (en) | Novel combined type large-size anti-seismic structure | |
CN102425099A (en) | Large cantilever wave-purlin combined PC bridge and manufacture method thereof | |
CN108301565A (en) | Three kinds of deformed bar welded mesh and preparation method | |
CN211286638U (en) | Aluminum alloy template outer wall K board reinforcing apparatus for building | |
CN204825945U (en) | A fixture for fixing buried bolt in advance | |
CN205894298U (en) | Steel frame and reinforced concrete shear wall structure system in steel construction house | |
CN205296583U (en) | Novel box post | |
CN210798016U (en) | From excellent floor that takes split heads to hold | |
CN210369457U (en) | Wall structure of integrated house | |
CN211114806U (en) | Reverse ridge formwork reinforcing steel bar fixture | |
CN210263116U (en) | Rapid mounting and dismounting shaping template for concrete reverse filling of lower independent foundation | |
CN210508038U (en) | Corrugated concrete-filled steel tube special-shaped column based on single trough form | |
CN101881058B (en) | Large-space three-dimensional twisted gypsum board wall and construction method thereof | |
CN102505755A (en) | Single bent and twisted color band and production method thereof | |
CN202158832U (en) | Special inspection tool for stirrup hook | |
CN215668976U (en) | Interim strutting arrangement of narrow and small space variable height | |
CN104763054A (en) | Assembly integral type orthogonal spatial mixed steel grid box type structure | |
CN209891427U (en) | Connecting joint of concrete-filled steel tubular column and box-shaped steel beam | |
CN205134885U (en) | A flue supporting device for being directed at finished product flue is strutted | |
CN204960174U (en) | A support instrument of oblique roofing roughness of control light grade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Wu Jianguo Document name: Notification of Termination of Patent Right |
|
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |