CN2705829Y - Electronic letter protector - Google Patents

Electronic letter protector Download PDF

Info

Publication number
CN2705829Y
CN2705829Y CN 200420023945 CN200420023945U CN2705829Y CN 2705829 Y CN2705829 Y CN 2705829Y CN 200420023945 CN200420023945 CN 200420023945 CN 200420023945 U CN200420023945 U CN 200420023945U CN 2705829 Y CN2705829 Y CN 2705829Y
Authority
CN
China
Prior art keywords
signal conditioning
conditioning package
guarantee
letter
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420023945
Other languages
Chinese (zh)
Inventor
左创宏
季剑平
刘锐
盖凯军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Bank Co Ltd
Original Assignee
China Merchants Bank Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Bank Co Ltd filed Critical China Merchants Bank Co Ltd
Priority to CN 200420023945 priority Critical patent/CN2705829Y/en
Application granted granted Critical
Publication of CN2705829Y publication Critical patent/CN2705829Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The utility model discloses and a kind ofly issue the signal conditioning package of letter of guarantee, aim to provide a kind of customs that is applicable to and " put afterwards and levy " signal conditioning package of business operation flow process earlier by computer network.It comprises receiving trap, is used for receiving the prepayment instruction to a certain client's collection of duties and fees that send the electronic port by computer network; Judgment means is used for determining according to described prepayment instruction whether this client has guaranteed qualification; Dispensing device is used for sending withhold success instruction and the instruction of assuring described client's expenses of taxation to the electronic port from described signal conditioning package.The utility model is applicable to the bank that handles customs's import and export expenses of taxation for the client.

Description

Electronics letter of guarantee device
Technical field
The utility model relates to a kind of signal conditioning package, particularly handles the device of expenses of taxation payment information on the electronic port.
Background technology
China Electronics port (abbreviation electronic port) relates to import and export the ecommerce/government affair platform of management.Fig. 1 is the management system 100 that the utilization electronic port is imported and exported as platform.As shown in Figure 1, system 100 comprises computer network 6, bank computer system 10, electronic port computer system 12, customs's computer system 14, national treasury computer system 16, corporate client terminal 18.Customs's computer system 14, electronic port computer system 12 can be carried out communication by computer network 6 between bank computer system 10 and the corporate client terminal 18.In addition, bank computer system 10 can carry out communication by special line 11 and electronic port computer system 12, and carries out communication by special line 13 and national treasury computer system 16.In system 100, conventional expenses of taxation payment flow is as follows:
A corporate client can be declared to customs when carrying out an import and export business.After receiving import and export declaration, customs's computer system 14 will write down the expenses of taxation of this import and export business of this client by computer network 6, and deposit electronic port computer system 12 in.After this expenses of taxation record deposits electronic port computer system 12 in, corporate client can find this expenses of taxation record by terminal 18 in electronic port computer system 12, and can send the expenses of taxation instruction of withholding to bank computer system 10 by electronic port computer system 12.Bank computer system 10 is receiving that the expenses of taxation withhold after the instruction, and whether promptly notify its corresponding department to search this client has the account in bank, if there is the account in enterprise, whether the deposit in this enterprise account enough pays the expenses of taxation in the expenses of taxation notices.If the deposit that this client does not establish in bank in account or the enterprise account is paid the expenses of taxation inadequately, bank computer system 10 sends the instruction of the failure of withholding to electronic port computer system 12 by dedicated connection 11.After receiving the failure command of withholding, electronic port computer system 12 is sent the instruction that the expenses of taxation of withholding are failed, this client's the import and export business thereby customs does not just let pass by computer network 6 to customs's computer system 14.
Through searching, if this client is provided with enterprise account in bank, and the deposit in this enterprise account is enough paid these expenses of taxation, and bank computer system 10 just changes the deposit in the enterprise account over to margin account, and the client can not employ the deposit in its margin account.
After the amount of money that will pay the expenses of taxation changed the customers' credit balance account over to, bank computer system 10 sent the success instruction of withholding by computer network 6 to electronic port computer system 12.After receiving the success instruction of withholding, electronic port computer system 12 is sent the instruction of clearance by computer network 6 to customs's computer system 14, so that customs be client's import and export business clearance.Then, electronic port computer system 12 is sent real button instruction by special line 11 to bank computer system 10, after receiving real button instruction, corresponding department of bank computer system 10 notifying banks puts the amount of money that is used to pay the expenses of taxation among the customers' credit balance account the interim family of this bank under, can by special line 13 expenses of taxation be delivered to national treasury computer system 16 by bank computer system 10 then.
The management system 100 of passing through described above is confirmed the method that the expenses of taxation are paid, and has two shortcomings at least.The first, receive the electronic port withhold the instruction after, forward the customers' credit balance account at the expenses of taxation amount of money among the enterprise deposits account after, bank computer system 10 could be to the instruction of 12 successes of withholding of electronic port computer system.And being transferred to the customers' credit balance account, the amount of money that will pay the expenses of taxation from enterprise account needs just can carry out under the situation of counting bank notes's open system.Like this, at bank's non operation time, although enough deposit payment expenses of taxation are arranged in a certain client's the enterprise account, the expenses of taxation avoid the program of withholding also can't carry out.The second, in import and export business, along with the increase of business, many clients face the turnover of funds problem, so be starved of the term of credit of payment expenses of taxation.Also there is such policy in customs, and the client good to credit rating takes first released goods, then Zheng Shui operating process.But, the improvement flow process that existing computer management system incompatibility is such.In addition, because putting the operating process of afterwards levying earlier has certain risk, customs can be very careful when authorization client credit rating, add that customs is not the specialized department to the assessment audit of client's credit rating, will make like this some credit ratings preferably the client be without access to put earlier and afterwards levy the preferential of operating process with convenient.
The utility model content
The purpose of this utility model provides one and is applicable to the signal conditioning package of " put afterwards earlier and levy " business operation flow process.
Another purpose of the present utility model provides one can use the signal conditioning package that many enterprises enjoy " put afterwards earlier and levy " business operation flow process up.
In order to reach the above object, the signal conditioning package of this programme comprises:
Receiving trap is used for receiving the prepayment instruction to a certain client's collection of duties and fees that send the electronic port by computer network;
Judgment means is used for determining according to described prepayment instruction whether this client has guaranteed qualification;
Dispensing device is used for sending withhold success instruction and the instruction of assuring described client's expenses of taxation to the electronic port from described signal conditioning package.
Compared with prior art, the beneficial effects of the utility model are to make also can successfully handle " put afterwards earlier and levy " business operation flow process at bank's non operation time, and can make original can to enjoy " put afterwards earlier and levy " business operation flow process because can not get the enterprise of customs's approval.In addition, the utility model compared with prior art the utility model can be faster and handle " put afterwards earlier and levy " business operation flow process effectively.
Description of drawings
Fig. 1 is the management system 100 that the utilization electronic port is imported and exported as platform.
Demonstrative structure more specifically in bank computer system 10 shown in Fig. 2 presentation graphs 1 and the electronic port computer system 12.
The demonstrative structure of a certain server shown in Fig. 3 presentation graphs 2.
The 302 more detailed structures of processing element shown in Fig. 4 A presentation graphs 3.
Fig. 4 B represents the data and the program of being deposited in the external memory parts 306 shown in Figure 3.
Fig. 5 is the operating process that the utility model is realized empty button of the expenses of taxation and granting electronics letter of guarantee.
Fig. 6 is that the operating process of electronics letter of guarantee detained and cancel in fact by the utility model realization expenses of taxation.
Embodiment
Demonstrative structure more specifically in bank computer system 10 shown in Fig. 2 presentation graphs 1 and the electronic port computer system 12.As shown in Figure 2, bank computer system 10 or electronic port computer system 12 comprise the server that two or more can multiple operation.
The demonstrative structure of a certain server shown in Fig. 3 presentation graphs 2.As shown in Figure 3, a certain server shown in Fig. 2 comprises a processing element 302,306, one disk drive interface 308 of 304, one external memory parts of stored parts (hard disk), a display 310,316, one input/output interfaces 318 of 312, one network communication interfaces of a display interface, 320, one keyboards 322 of a mouse and a group system bus 314.
External memory parts (hard disk) 306 links to each other with disk drive interface 308; Display 310 links to each other with display interface 312; Mouse 320 and keyboard 322 link to each other with input/output interface 318.
Processing element 302, stored parts 304, disk drive interface 308, display interface 312, network communication interface 316 and input/output interface 318 link to each other with system bus 314.
Stored parts 304 and external memory parts 306 can stored programmes, instruction and data.In general, stored parts 304 have access speed faster, and external memory parts 306 have bigger memory capacity.Display 310 can provide a visual interface between program of carrying out and user.Network communication interface 316 can provide a communication interface between computer system network 6 and this server.
Processing element 302 can access memory programmed instruction and data in storage parts 304 and the external memory parts 306, and can control the operation of this server by carrying out these programs and instruction.
The 302 more detailed structures of processing element shown in Fig. 4 A presentation graphs 3.Shown in Fig. 4 A, processing element 302 comprises 404, one arithmetic operating apparatus 406 of 403, one logical calculation devices of 402, one control device of a code translator and an actuating unit 408.Code translator 402 can be translated into the computer-internal control signal with an instruction; Logical calculation device 404 can come the actuating logic computing according to control signal; Arithmetic operating apparatus 406 can be carried out arithmetical operation according to control signal; Actuating unit 408 can come turning to of executable operations external unit, access memory storage parts 304 and external memory parts 306, control device 403 energy control operation results and operating process according to control signal.
Fig. 4 B represents the data and the program of being deposited in the external memory parts 306 shown in Figure 3.Shown in Fig. 4 B, external memory parts 306 are provided with enterprise account data 412, enterprise's credit qualification data 414, electronics letter of guarantee file 416 and electronics letter of guarantee program 418.Electronics letter of guarantee program 418 can realize the function of process flow diagram as shown in Figure 5 and Figure 6.
Fig. 5 is the operating process that the utility model is realized empty button of the expenses of taxation and granting electronics letter of guarantee.
As shown in Figure 5, in 503 steps, customs's computer system 14 requires an import and export business for a certain enterprise, deposits its corresponding expenses of taxation record in the electronic port computer system by computer network 6.
In step 504, this enterprise uses terminal 18 to find its expenses of taxation record by computer network 6 in electronic port computer system 12.
In step 506, this enterprise requires electronic port computer system 12 by computer network 6, sends the instruction of withholding according to expenses of taxation record to bank computer system 10.
In step 508, processing element 302 is carried out decision operation by its logical calculation device 404, decides this enterprise whether the qualification of electronics letter of guarantee is arranged according to the information in enterprise's credit qualification data 414, and enough accrediting amounts are arranged.The qualification that meets the electronics letter of guarantee has two kinds of situations: a kind of is to satisfy the inner letter of bank to award the enterprise of standard, and with bank contract is arranged; Another kind is the 3A credit rank enterprise of customs approval and with bank contract is arranged.
If this enterprise does not have the qualification of electronics letter of guarantee or do not have enough accrediting amounts, control device in the processing element 302 403 forwards flow operations to step 509; If there is the qualification of electronics letter of guarantee in this enterprise and enough accrediting amounts are arranged, the control device 403 in the processing element 302 then forwards flow operations to step 510.
In step 509, processing element 302 is handled the expenses of taxation according to conventional method and is withheld.Operating in step 518 then finishes.
In step 510, processing element 302 produces a letter of guarantee, and the expenses of taxation volume in the instruction of withholding is assured, letter of guarantee has a time limit (generally from sending 13 days that count the instruction day of withholding).
In step 512, processing element 302 is carried out " empty button " by its arithmetic operating apparatus 406 and 408 pairs of these enterprise account of actuating unit and is handled.When handling, the fund of motionless enterprise account is just write down the pairing letter of guarantee of this enterprise account, bond amount and Bond period at " empty button ".
In step 514, the actuating unit 403 in the processing element 302 sends the success instruction of withholding by its network communication interface 316 to electronic port computer system 12, and letter of guarantee comes into force.The letter of guarantee file deposits electronics letter of guarantee file 416 in.If desired, the expenses of taxation record that this letter of guarantee file can be sent to electronic port computer system 12 and this corporate client of the actuating unit 403 in the processing element 302 exists together.
After receiving the success instruction of withholding, in step 516, customs is that the import and export transaction of corporate client is let pass.
Fig. 6 is that the operating process of electronics letter of guarantee detained and cancel in fact by the utility model realization expenses of taxation.
As shown in Figure 6, the logical calculation device in step 604 processing element 302 404 judges that Bond period is to not having.
This external system is supported enterprise's tax payment in arbitrary day before the real button time limit, and bank adopts artificial real button measure.
If Bond period does not also arrive, 302 of processing element are waited in step 604.If Bond period has arrived, the control device 403 in the processing element 302 then forwards operation steps to step 606.
In step 606, the logical calculation device 404 in the processing element 302 judges that whether fund in the enterprise account is more than or equal to bond amount.If the enterprise account fund is greater than or equal to bond amount, control device in the processing element 302 403 forwards operating process to step 608, otherwise forwards step 610 to.
If the fund in the enterprise account is more than or equal to bond amount, in step 608,408 of the actuating units in the processing element 302 are deducted amount of guarantee in enterprise account.
If the fund in the enterprise account is less than bond amount, in step 610,408 of the actuating units in the processing element 302 are deducted all remaining sums in enterprise account, and payment are filled out by bank count enterprise's overdue loan.
In step 612, the actuating unit 408 in the processing element 302 sends actual button account and cancels the information of letter of guarantee to electronic port computer system 12 by network communication interface 316.
In step 614, the actuating unit 408 in the processing element 302 mails to national treasury computer system 16 by its network communication interface 316 with bond amount.
Finish as shown in Figure 5 and Figure 6 that the program of process flow diagram can be stored in stored parts 304 or the external memory parts 308, and can carry out by processed parts 302.

Claims (9)

1. be used for issuing the signal conditioning package of letter of guarantee, comprise by computer network:
Receiving trap is used for receiving the prepayment instruction to a certain client's collection of duties and fees that send the electronic port by computer network;
Judgment means is used for determining according to described prepayment instruction whether this client has guaranteed qualification;
Dispensing device is used for sending withhold success instruction and the instruction of assuring described client's expenses of taxation to the electronic port from described signal conditioning package.
2. signal conditioning package as claimed in claim 1 comprises:
Actuating unit is used to produce letter of guarantee.
3. signal conditioning package as claimed in claim 2, described actuating unit are used for enterprise account is made empty buckle reason after producing letter of guarantee.
4. signal conditioning package as claimed in claim 2, described actuating unit is used to send the success receipt of withholding, so that letter of guarantee comes into force after producing letter of guarantee.
5. signal conditioning package as claimed in claim 1 comprises:
Actuating unit under judgment means judges that this client is not by the situation of guarantee qualification, is used for handling the expenses of taxation with conventional method and withholds.
6. signal conditioning package as claimed in claim 1, described judgment means is used to judge whether described letter of guarantee expires.
7. signal conditioning package as claimed in claim 1, described judgment means, the amount of money that is used for judging the enterprise account expense of whether enough paying duty.
8. signal conditioning package as claimed in claim 7, described actuating unit is used for deducting bond amount in described enterprise account.
9. signal conditioning package as claimed in claim 8, described actuating unit is used to cancel letter of guarantee.
CN 200420023945 2004-06-21 2004-06-21 Electronic letter protector Expired - Lifetime CN2705829Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420023945 CN2705829Y (en) 2004-06-21 2004-06-21 Electronic letter protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420023945 CN2705829Y (en) 2004-06-21 2004-06-21 Electronic letter protector

Publications (1)

Publication Number Publication Date
CN2705829Y true CN2705829Y (en) 2005-06-22

Family

ID=34849368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420023945 Expired - Lifetime CN2705829Y (en) 2004-06-21 2004-06-21 Electronic letter protector

Country Status (1)

Country Link
CN (1) CN2705829Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112348486A (en) * 2020-11-25 2021-02-09 江西丰哲科技有限公司 Method and device for examining and approving insurance letters
US20210224894A1 (en) * 2018-11-22 2021-07-22 Beijing Boe Optoelectronics Technology Co., Ltd. User resource management method, apparatus and device and computer readable storage medium
CN113570354A (en) * 2021-07-29 2021-10-29 中国工商银行股份有限公司 Method, server and system for processing customs insurance bond data

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210224894A1 (en) * 2018-11-22 2021-07-22 Beijing Boe Optoelectronics Technology Co., Ltd. User resource management method, apparatus and device and computer readable storage medium
CN112348486A (en) * 2020-11-25 2021-02-09 江西丰哲科技有限公司 Method and device for examining and approving insurance letters
CN113570354A (en) * 2021-07-29 2021-10-29 中国工商银行股份有限公司 Method, server and system for processing customs insurance bond data

Similar Documents

Publication Publication Date Title
CN101030311A (en) One to multiple account processing system
US10069672B2 (en) Real time event capture, analysis and reporting system
CN101373474A (en) Magnanimity data real time processing structure and real time processing platform following with necessaries for the same
US20180102935A1 (en) Real time event capture and analysis of transient data for an information network
CN108830715A (en) Batch file part disk returning processing method and system
CN1702673A (en) Transaction information processing method for network transaction system
CN107358425A (en) The calculating of tranaction costs and method of payment and device, transaction platform and storage medium
CN111932366A (en) Document business processing device and method
US10067994B2 (en) Real time event capture and transformation of transient data for an information network
Bech et al. Gridlock resolution in interbank payment systems
US20070255651A1 (en) Batch processing of financial transactions
CN2705829Y (en) Electronic letter protector
CN110400139A (en) Based on the method for payment to public digital cash wallet, apparatus and system
US8249396B2 (en) System and methods for handling financial document returns and processing exceptions
CN1713187A (en) Electronic letter of guarantee and system method
WO2022188528A1 (en) Transaction fee payment method based on parallel execution, and device and storage medium
CN111383103A (en) User financing method and device
CN106682902A (en) Collection method and collection system for virtual accounts of transnational trade B2B (business-to-business) banks
KR101500832B1 (en) Withholding agency method and system performing the same
CN110716948B (en) Double-lock control method and medium based on data periodic processing
CA2876088A1 (en) Tax return platform
KR102236887B1 (en) A method and apparatus of transferring funds including fees and grant
CN111784330A (en) Pseudo queue settlement method and system based on database and electronic equipment
CN110246022B (en) Financial management system and method
JP2001195528A (en) Account settlement system and account settlement processing method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140621

Granted publication date: 20050622