CN2703033Y - Assembling pile body for dam and bridge inserting construction - Google Patents

Assembling pile body for dam and bridge inserting construction Download PDF

Info

Publication number
CN2703033Y
CN2703033Y CN 200420039147 CN200420039147U CN2703033Y CN 2703033 Y CN2703033 Y CN 2703033Y CN 200420039147 CN200420039147 CN 200420039147 CN 200420039147 U CN200420039147 U CN 200420039147U CN 2703033 Y CN2703033 Y CN 2703033Y
Authority
CN
China
Prior art keywords
construction
dykes
dams
stake
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420039147
Other languages
Chinese (zh)
Inventor
何富荣
唐光裕
张振荣
应华素
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HEHAI HYDRAULIC FLASHBOARD ENGINEERING CO LTD
Shandong Hongxu Construction Co ltd
Original Assignee
Dongying Zhuangjan Hydraulic Spilt Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Zhuangjan Hydraulic Spilt Technology Co ltd filed Critical Dongying Zhuangjan Hydraulic Spilt Technology Co ltd
Priority to CN 200420039147 priority Critical patent/CN2703033Y/en
Application granted granted Critical
Publication of CN2703033Y publication Critical patent/CN2703033Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an assembling pile body for dam and bridge inserting construction which is composed of a dam pile, a bridge abutment pile, a water-retaining wall, steel bars, slide tracks and slide plates, with the steel bars, the slide tracks and the slide plates being arranged on the water-retaining wall. The dam pile is composed of the water-retaining wall and a bearing beam, and has the quadrangle, polygon or other form frame style structure with double slide tracks or multi slide tracks matched with double slide plates or multi slide plates being inserted underground. The bridge abutment is in the frame structure of combination of a bridge abutment end pile and a bridge abutment king pile, with matched double slide tracks or double slide plates being inserted underground. The assembling pile body of the utility model has better seakeeping qualities when being inserted into the construction than a veneer does. The utility model has the advantages of fast construction in water, short construction cycle and low risk, and is specifically adapted to large-scale construction in rivers, lakes and shallow water areas along the coast.

Description

Dykes and dams and bridge insert the combination pile body of construction
One, technical field:
The utility model relates to the pile foundation of dykes and dams, bridge, relates in particular to the combination pile body that a kind of dykes and dams and bridge insert construction.
Two, background technology:
Application number is the Chinese patent of 02110466.2 Dongying Zhuangjian Hydraulic Inserting Plate Technology co.,Ltd, a kind of " combined plate-inserting dam and construction process " disclosed, this process using veneer list slideway and slide plate interconnect to insert and form whole wall, form plate-inserting dam with cast-in-place tie-beam and panel between two walls.Preferably resolve the anti-damaged or destroyed by flood of dykes and dams, leakproof, few maintenance and stability problem.But during the construction of the dykes and dams of this structure, be subject to hydrometeorological condition influence, counter-bending ability was relatively poor when veneer inserted the construction lifting, being subject to marine stormy waves during insertion impacts, before not cast-in-place brace summer, the poor stability of self, the cast-in-place workload of over-water construction is big, and construction exists veneer and inserts that speed of application is slow, difficulty of construction is big, construction period is long, make the construction of large-scale pile foundation engineerings such as this dykes and dams, bridge be subjected to certain restriction.
Three, summary of the invention:
The technical problems to be solved in the utility model provides a kind of dykes and dams and bridge inserts the combination pile body of construction, its sectional is made as the compound pile body in advance, insert construction, both can overcome above-mentioned problems of the prior art, have again that overall performance is good, speed of application is fast, the construction period is short, construction costs is low, can be adapted to the river course of the broad water surface, the advantage that large-scale pile foundation engineering is built in the bigger marine site of stormy waves influence especially.
The technical scheme that the utility model is dealt with problems be a kind ofly comprise that dykes and dams stake, bridge pier stake, waterwall and brace summer constitute, two slideway or many slideways match with two slide plates or many slide plates that insertion is underground, quadrangle, H type or polygonal tower structure.Described bridge pier stake by the combination of the stake of bridge pier end and bridge pier king-pile, two slideways and two slide plate match and insert underground tower structure.
Wherein, after described dykes and dams stake interconnects and inserts construction, dykes and dams stake inner chamber filling earth, panel, cast-in-place concrete pavement, wave wall are installed in the top.After described bridge pier stake interconnects and inserts construction, inner chamber backfilling cement mix soil, cushion cap cast-in-place, that can form bridge pier is installed at the top.Described bridge pier end stake outer end is triangle, circle or other similar structures structure.
The utility model also has following advantage and beneficial effect compared with prior art:
1, the utility model cast-in-place workload of will originally need constructing has on the water in a large number become land integral prefabricatedly, has reduced the subaqueous work difficulty, has strengthened structural strength, has increased in the work progress and the security and stability of engineering after building up.
2, the control of original veneer list slideway is inserted the stratum and change into by large-scale pile body developed width two slideways or many slideways are set, control pile body simultaneously and insert the stratum.Effectively solved the problem of marine stormy waves shock effect positioning control.Pitching pile finishes, and the back implements respectively to slideway that slip casting is stitched admittedly and whole pile body is implemented the solid plate of slip casting can make whole engineering form a firm concrete overall structure.
3, give full play to jetting guiding pile body and inserted the technical advantage on stratum, subaqueous work has the ability of very strong wind and wave resistance impact failure, increase substantially speed of application, shortened the construction period, reduced the risk of waters construction, reduced construction costs.
4, this structure is adapted to the bigger marine site construction dykes and dams or the large-scale pile foundation engineering of bridge of river course, stormy waves influence of the broad water surface.
Four, description of drawings:
Fig. 1 is the utility model dykes and dams stake compound pile body structure schematic diagram
Fig. 2 is a dykes and dams stake compound pile body structure schematic top plan view shown in Figure 1
Fig. 3 is the dykes and dams schematic diagram of building with the utility model combination pile body
Fig. 4 is a schematic top plan view shown in Figure 3
Fig. 5 is the utility model bridge pier stake compound pile body structure schematic diagram
Fig. 6 is a bridge pier stake combination pile body schematic top plan view shown in Figure 5
Fig. 7 is that bridge pier stake combination pile body shown in Figure 5 connects insertion back schematic top plan view
The bridge pier stake schematic diagram of Fig. 8 for building with the combination pile body
Fig. 9 is a schematic top plan view shown in Figure 8
Five, the specific embodiment:
Referring to Fig. 1 to Fig. 9, a kind of dykes and dams and bridge insert the combination pile body of construction, comprise dykes and dams stake 1, bridge pier stake 2,3, waterwall 4 and on reinforcing bar 6, slideway 7 and the slide plate 8 installed, the dykes and dams stake by waterwall 4 and brace summer 5 slideways that constitute, two or many slideways and two slide plates or and many slide plates match and insert underground quadrangle or polygon or other forms of tower structure.Bridge pier stake 2,3 by 3 combinations of bridge pier end stake 2 and bridge pier king-pile, two slideways 7 and two slide plate 8 match and insert underground tower structure.
After dykes and dams stake 1 interconnects and inserts construction, dykes and dams stake inner chamber filling earth 9, panel 10, cast-in-place concrete pavement Dongying Zhuangjian Hydraulic Inserting Plate Technology co.,Ltd, wave wall 12 are installed in the top.
After bridge pier stake 2,3 interconnects and inserts construction, inner chamber backfilling cement mix soil 13, cushion cap 14 cast-in-place, that can form bridge pier is installed at the top.Bridge pier end stake 2 outer ends are triangle, circle or other similar structures.

Claims (5)

1, a kind of dykes and dams and bridge insert the combination pile body of construction, comprise dykes and dams stake, bridge pier stake, waterwall and on reinforcing bar, slideway and the slide plate installed, it is characterized in that that described dykes and dams stake is made of waterwall and brace summer, two slideways or many slideways match with two slide plates or many slide plates to insert underground quadrangle, H type or polygonal tower structure.
2, dykes and dams according to claim 1 and bridge insert the combination pile body of construction, it is characterized in that described dykes and dams stake top installs panel, cast-in-place concrete pavement, wave wall, dykes and dams stake inner chamber filling earth.
3, dykes and dams according to claim 1 and bridge insert the combination pile body of construction, it is characterized in that described bridge pier stake by stake of bridge pier end and the combination of bridge pier king-pile, two slideways and two slide plate match and insert underground tower structure.
4, dykes and dams according to claim 3 and bridge insert the combination pile body of construction, it is characterized in that described bridge pier stake top installs cushion cap cast-in-place, that can form bridge pier, inner chamber backfilling cement mix soil.
5, according to the combination pile body of claim 3 or 4 described dykes and dams and bridge insertion construction, it is characterized in that described bridge pier end stake outer end is triangle, circular arc type structure.
CN 200420039147 2004-03-18 2004-03-18 Assembling pile body for dam and bridge inserting construction Expired - Lifetime CN2703033Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420039147 CN2703033Y (en) 2004-03-18 2004-03-18 Assembling pile body for dam and bridge inserting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420039147 CN2703033Y (en) 2004-03-18 2004-03-18 Assembling pile body for dam and bridge inserting construction

Publications (1)

Publication Number Publication Date
CN2703033Y true CN2703033Y (en) 2005-06-01

Family

ID=34773799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420039147 Expired - Lifetime CN2703033Y (en) 2004-03-18 2004-03-18 Assembling pile body for dam and bridge inserting construction

Country Status (1)

Country Link
CN (1) CN2703033Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029625A (en) * 2019-05-23 2019-07-19 中建科技(福州)有限公司 Detachable easily memory-type flood protection device
CN110520574A (en) * 2017-07-18 2019-11-29 四万十混凝土株式会社 Retaining wall stacking building block
CN110593074A (en) * 2019-10-16 2019-12-20 何富荣 Hydraulic flashboard wind wave prevention bridge, construction process and efficient culture area with bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110520574A (en) * 2017-07-18 2019-11-29 四万十混凝土株式会社 Retaining wall stacking building block
CN110029625A (en) * 2019-05-23 2019-07-19 中建科技(福州)有限公司 Detachable easily memory-type flood protection device
CN110593074A (en) * 2019-10-16 2019-12-20 何富荣 Hydraulic flashboard wind wave prevention bridge, construction process and efficient culture area with bridge

Similar Documents

Publication Publication Date Title
CN202466594U (en) Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN101260664A (en) Soft soil foundation large scale steel float lock head construction method
CN103243678B (en) Mole
CN107740404B (en) A kind of construction method of underground continuous wall
DE112021000948T5 (en) Novel offshore wind power foundation suitable for shallow overburden layer and related construction method
CN2703033Y (en) Assembling pile body for dam and bridge inserting construction
CN109356186B (en) Bridge tower composite foundation applicable to deep water soft soil areas and construction method
CN1380469A (en) Combined plate-inserting dam and its construction process
CN211815989U (en) Over-current type permeable breakwater structure
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN211079871U (en) Hydraulic flashboard wind wave prevention bridge and efficient culture area with same
CN113047215A (en) Middle plate pile high pile wharf structure
CN203256680U (en) Jetty
CN201883449U (en) Sea wall structure of compound pile
CN2866594Y (en) Hydraulic inserting board building dykes pervious water wave protection wall
CN106854864A (en) Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
CN206655186U (en) A kind of preceding water draining high-rise pile cap bank protection structure
CN202359565U (en) Steel sheet pile cofferdam structure
CN206385502U (en) A kind of assembling-type precast channel revetment of rapid construction
CN1760468A (en) Half blind type structure for increasing brearing capability of sheet pile wall
CN219671220U (en) Ecological barricade of precast composite pile and ecological bank protection system of river course
CN110565666A (en) Construction method of flat combined sheet pile ground connecting wall type water retaining cofferdam
CN210151661U (en) Pile foundation type breakwater with breakwater
CN201485841U (en) Steel pontoon lock head for soft soil foundation
CN212772181U (en) Ecological revetment structure capable of being constructed on water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HE FURONG

Free format text: FORMER OWNER: DONGYING ZHUANGJIAN HYDRAULIC INSERTING PLATE TECHNOLOGY CO.,LTD.

Effective date: 20070817

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20070817

Address after: 257000, Xiang Yuan District, Xicheng District, Xicheng, Shandong, Dongying 44-1

Patentee after: He Furong

Address before: 257000 Shandong province Dongying City West Road No. 433

Patentee before: Dongying Zhuangjan Hydraulic Spilt Technology Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: SHANDONG HONGXU CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: SHANDONG HEHAI SHUILI FLASHBOARD ENGINEERING CO.,LTD.

Effective date: 20130222

Owner name: SHANDONG HEHAI SHUILI FLASHBOARD ENGINEERING CO.,L

Free format text: FORMER OWNER: HE FURONG

Effective date: 20130222

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130222

Address after: 257000, Xiang Yuan District, Xicheng District, Xicheng, Shandong, Dongying 44-1

Patentee after: SHANDONG HONGXU CONSTRUCTION Co.,Ltd.

Address before: 257000, Xiang Yuan District, Xicheng District, Xicheng, Shandong, Dongying 44-1

Patentee before: SHANDONG HEHAI HYDRAULIC FLASHBOARD ENGINEERING Co.,Ltd.

Effective date of registration: 20130222

Address after: 257000, Xiang Yuan District, Xicheng District, Xicheng, Shandong, Dongying 44-1

Patentee after: SHANDONG HEHAI HYDRAULIC FLASHBOARD ENGINEERING Co.,Ltd.

Address before: 257000, Xiang Yuan District, Xicheng District, Xicheng, Shandong, Dongying 44-1

Patentee before: He Furong

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140318

Granted publication date: 20050601