CN2680437Y - Septic tank mould with three cases - Google Patents
Septic tank mould with three cases Download PDFInfo
- Publication number
- CN2680437Y CN2680437Y CN 200420028457 CN200420028457U CN2680437Y CN 2680437 Y CN2680437 Y CN 2680437Y CN 200420028457 CN200420028457 CN 200420028457 CN 200420028457 U CN200420028457 U CN 200420028457U CN 2680437 Y CN2680437 Y CN 2680437Y
- Authority
- CN
- China
- Prior art keywords
- chassis
- carcass
- mould
- septic tank
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treatment Of Biological Wastes In General (AREA)
Abstract
The utility model discloses a septic tank mould with three cases. The septic tank with three cases uses the triarticular gap mould of steel plate, and comprises a chassis, and a carcass which is oblong shape or ladder type and is welded to form by the steel plate. The carcass can be divided into three parts, and the proportion is 2:1:3. A void is arranged between the first part and the second part, and the second part and the third part, to form a crack used to place a baffle. The carcass is fixed to the chassis, and integrates with the chassis to a whole. The production of the septic tank with three cases can be formed in one piece. The utility model has the advantages of durable effect, economic fabrication cost, long service life, easy construction, short loss time. The mould and the chassis are the whole, so the coefficient of thermal expansion is small, the demoulding is easy and quick, and the move is convenient.
Description
Technical field
The invention relates to mould, particularly be a kind of three-grid septic tank mould.
Background technology
The mode of the storage ight soil in lavatory, rural area is mostly relatively backward at present, and the employing hole formula that has stores, and is extremely unhygienic, causes mosquitos and flies to multiply, and the harm people's is healthy.Advocate the sanitary privy transformation according to country, particularly transform in the rural health lavatory, the whole nation a lot of production manure pit of appearance manufacturer, all be to make mould with plank, adopt the resin glass fibre reinforced plastics material, and mould be one or disperse assembly unit, one too heavy, mould damaged easily when falling the demoulding; Disperse dismounting, the installation procedure of assembly unit various, in the time of product heat on the mould, demoulding difficulty, time expand.In manufacturing process, generally do the pond shell earlier, with the artificial assembly unit of ready-made baffle plate, baffle plate one circle is smeared bonding, itself has releasing agent the pond, smooth surface, with baffle plate be two objects, of long duration crack easily, service life is short, easy crooked cracking when carrying is installed in addition, influence product quality, technological process is long, time-consuming taking a lot of work, yield poorly the cost height.Adopt prefabricated cement plate or masonry structure to make in addition in addition, the general life-span is short, can not be antifreeze, corrosion and alkali corrodes.
Summary of the invention
Technical problem to be solved by this invention is, a kind of septic tank mould is provided, and adopts steel plate three joint discontinuity moulds, and mould and chassis are an integral body, thermal coefficient of expansion is little, reaches the easy piece victory of the demoulding, and cost is low, long service life, technological process is reasonable, moves the purpose with easy construction.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: the three-grid septic tank mould, adopt the disconnected mould of steel plate three internodes, mould comprises the chassis, carcass, carcass is a rectangle or trapezoidal, be welded by steel plate, carcass top is less than the bottom, for the ease of depanning, carcass is divided into three parts, first, second portion and third part, its ratio is 2: 1: 3, be provided with the space between first and the second portion, form crack, be provided with the space between second portion and the third part, form crack, be used to place baffle plate, the steel plate neighboring of crack both sides is recessed, forms domatic, and carcass is fixed on the chassis, with the chassis be an integral body, the chassis is provided with a plurality of nut bore greater than the bottom surface of carcass in the surrounding on chassis, can be screwed into bolt from the bottom surface, on nut bore, be provided with the angle bar frame, on the angle bar frame, be provided with enhancing ring, by the bolt that the chassis nut bore is screwed into, jack-up angle bar frame, with crane by the enhancing ring angle bar frame of can slinging, below the chassis, be provided with universal wheel, be provided with pull cylinder, for the ease of moving moulds at the two ends on chassis.
The invention has the beneficial effects as follows: adopt the three-grid septic tank mould, can one-shot forming, rational in infrastructure simple, long service life, technological process is reasonable, easy construction, weak point consuming time improves output, and relative cost is low; Mould adopts steel plate three joint discontinuity moulds, and mould and chassis are an integral body, and thermal coefficient of expansion is little, the easy piece victory of the demoulding, conveniently moving.
Description of drawings
Fig. 1 is a three-grid septic tank mould schematic diagram
Fig. 2 is a three-grid septic tank mould chassis schematic diagram
Fig. 3 is that the angle bar frame is at mould chassis position view
Among the figure:
1: chassis 2: carcass
3: first 4: second portion
5: third part 6: crack
7: nut bore 8: the angle bar frame
9: enhancing ring 10: universal wheel
11: pull cylinder
The specific embodiment
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail: the three-grid septic tank mould, adopt the disconnected mould of steel plate three internodes, mould comprises chassis 1, carcass 2, carcass 2 is a rectangle or trapezoidal, be welded by steel plate, carcass 2 tops are less than the bottom, for the ease of depanning, carcass 2 is divided into three parts, first 3, second portion 4 and third part 5, its ratio is 2: 1: 3, be provided with the space between first 3 and the second portion 4, form crack 6, be provided with the space between second portion 4 and the third part 5, form crack 6, be used to place baffle plate, the steel plate neighboring of crack 6 both sides is recessed, forms domatic, carcass 2 is fixed on the chassis 1, with chassis 1 be an integral body, chassis 1 is greater than the bottom surface of carcass 2,1 surrounding is provided with a plurality of nut bore 7 on the chassis, can be screwed into bolt from the bottom surface, on nut bore 7, be provided with angle bar frame 8, on angle bar frame 8, be provided with enhancing ring 9, the bolt that is screwed into by chassis nut bore 7, jack-up angle bar frame 8, by the enhancing ring angle bar frame 8 of can slinging, be provided with universal wheel 10 with crane below chassis 1,1 two ends are provided with pull cylinder 11 on the chassis, traction handle is inserted pull cylinder 11, can arbitrarily move moulds.
Below in conjunction with three-grid septic tank manufacturing process mould is elaborated: at first make mould, adopt the disconnected mould of steel plate three internodes, mould comprises chassis 1, carcass 2, carcass 2 is a rectangle or trapezoidal, be welded by steel plate, carcass 2 tops are less than the bottom, for the ease of depanning, carcass 2 is divided into three parts, first 3, second portion 4 and third part 5, its ratio is 2: 1: 3, be provided with the space between first 3 and the second portion 4, form crack 6, be provided with the space between second portion 4 and the third part 5, form crack 6, in crack 6, place baffle plate, the steel plate neighboring of crack 6 both sides is recessed, form domatic, increase the contact area that baffle plate and carcass 2 are coated, strengthen the bond strength that baffle plate and carcass 2 are coated, carcass 2 is fixed on the chassis 1, with chassis 1 be an integral body, chassis 1 is greater than the bottom surface of carcass 2, and 1 surrounding is provided with a plurality of nut bore 7 on the chassis, can be screwed into bolt from the bottom surface, on nut bore 7, be provided with angle bar frame 8, be provided with enhancing ring 9 on angle bar frame 8, it is cured to beat one deck earlier on mould carcass 2 before brushing, ready made baffle plate is put into the crack 6 of mould, then with the coating brushing on the carcass 2 of mould, coating is solidified the back and is formed three-grid septic tank, carries out the demoulding, the bolt that is screwed into by mould chassis nut bore 7, jack-up angle bar frame 8,, will make three-grid septic tank and sling by the enhancing ring angle bar frame 8 of slinging with crane, break away from mould.
Claims (1)
1. three-grid septic tank mould, it is characterized in that, adopt the disconnected mould of steel plate three internodes, mould comprises chassis (1), carcass (2), carcass (2) is a rectangle or trapezoidal, be welded by steel plate, carcass (2) top is less than the bottom, for the ease of depanning, carcass (2) is divided into three parts, first (3), second portion (4) and third part (5), its ratio is 2: 1: 3, be provided with the space between first (3) and the second portion (4), form crack (6), be provided with the space between second portion (4) and the third part (5), form crack (6), be used to place baffle plate (4), the steel plate neighboring of crack (6) both sides is recessed, form domatic, carcass (2) is fixed on the chassis (1), is an integral body with chassis (1), and chassis (1) is greater than the bottom surface of carcass (2), the surrounding of (1) is provided with a plurality of nut bore (7) on the chassis, can be screwed into bolt from the bottom surface, on nut bore (7), be provided with angle bar frame (8), on angle bar frame (8), be provided with enhancing ring (9), the bolt that is screwed into by chassis nut bore (7), jack-up angle bar frame (8) by enhancing ring (9) the angle bar frame (8) of can slinging, is provided with universal wheel (1 ()) with crane below chassis (1), the two ends of (1) are provided with pull cylinder (11) on the chassis, for the ease of moving moulds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420028457 CN2680437Y (en) | 2004-03-03 | 2004-03-03 | Septic tank mould with three cases |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420028457 CN2680437Y (en) | 2004-03-03 | 2004-03-03 | Septic tank mould with three cases |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2680437Y true CN2680437Y (en) | 2005-02-23 |
Family
ID=34607166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420028457 Expired - Fee Related CN2680437Y (en) | 2004-03-03 | 2004-03-03 | Septic tank mould with three cases |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2680437Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108556271A (en) * | 2018-05-30 | 2018-09-21 | 芜湖优聚塑模有限公司 | A kind of lower pool body molding die of leak-proof digestion tank |
CN109940754A (en) * | 2019-03-28 | 2019-06-28 | 付振翮 | A kind of seamless packet connection prefabricated plate producing process of three-grid septic tank |
CN112177340A (en) * | 2020-10-14 | 2021-01-05 | 合肥米弘智能科技有限公司 | Concrete septic tank construction method |
-
2004
- 2004-03-03 CN CN 200420028457 patent/CN2680437Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108556271A (en) * | 2018-05-30 | 2018-09-21 | 芜湖优聚塑模有限公司 | A kind of lower pool body molding die of leak-proof digestion tank |
CN109940754A (en) * | 2019-03-28 | 2019-06-28 | 付振翮 | A kind of seamless packet connection prefabricated plate producing process of three-grid septic tank |
CN112177340A (en) * | 2020-10-14 | 2021-01-05 | 合肥米弘智能科技有限公司 | Concrete septic tank construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101487332B (en) | Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab | |
CN2680437Y (en) | Septic tank mould with three cases | |
CN201071598Y (en) | Compound wood brace used for reinforced concrete member shaping support | |
CN2368912Y (en) | Assembled steel-plastic formwork | |
CN215038588U (en) | Make things convenient for mould for concrete composite slab preparation of die sinking | |
CN2265412Y (en) | Trough-shape pre-buried element commonly used for curtain wall | |
CN2747298Y (en) | Reinforced concrete hollow prefabricated member board | |
CN211006858U (en) | Combined die plate structure of pump station runner | |
CN210278629U (en) | Construction site raise dust controlling means | |
CN209780343U (en) | Integral bathroom chassis | |
CN209277287U (en) | A kind of assembly concrete-filled steel tube wall frame building integrated morphology | |
CN2288176Y (en) | Composite filling supporter | |
CN2747299Y (en) | Reinforced concrete hollow prefabricated member board | |
CN221697340U (en) | Special mould for cement electric pole anti-sinking table | |
CN1559941A (en) | Three-grid septic tank and mfg. method thereof | |
CN217531226U (en) | Modular stair mould | |
CN218971099U (en) | Aluminum alloy section bar for freight transportation cat ladder footboard | |
CN216712624U (en) | Flexible base asphalt pavement structure for repairing trunk highway | |
CN220952991U (en) | Anticorrosive coating spraying device for bridge anti-collision wall | |
CN2786230Y (en) | Support rack and plane grid board assembled thereby | |
CN220225420U (en) | Railway contact net basis pouring die | |
CN219863233U (en) | Integral integrated manhole cover | |
CN218373387U (en) | Midspan closure hanger structure of bridge with rotary trunk channels for transsouth-to-north water diversion | |
KR200232751Y1 (en) | Mending composition structure frame of underwater structure | |
CN221546361U (en) | UHPC supporting beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |