CN2659964Y - Eccentric moment regulatable viberating pile hammer linkage - Google Patents

Eccentric moment regulatable viberating pile hammer linkage Download PDF

Info

Publication number
CN2659964Y
CN2659964Y CN 03200442 CN03200442U CN2659964Y CN 2659964 Y CN2659964 Y CN 2659964Y CN 03200442 CN03200442 CN 03200442 CN 03200442 U CN03200442 U CN 03200442U CN 2659964 Y CN2659964 Y CN 2659964Y
Authority
CN
China
Prior art keywords
vibrohammer
eccentric moment
pile
equipment
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03200442
Other languages
Chinese (zh)
Inventor
李铁民
厉振群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIAXING YULONG TRADE CO Ltd BEIJING
Original Assignee
JIAXING YULONG TRADE CO Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING YULONG TRADE CO Ltd BEIJING filed Critical JIAXING YULONG TRADE CO Ltd BEIJING
Priority to CN 03200442 priority Critical patent/CN2659964Y/en
Application granted granted Critical
Publication of CN2659964Y publication Critical patent/CN2659964Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to an interlocking equipment of an adjustable-eccentric moment vibrohammer (hereafter referred to as the adjustable vibrohammer), which is a large-scale pile-sinking equipment in which a plurality of vibrohammers of the same types are used to make a vibration frequency rigidly synchronized and the eccentric moment steplessly adjusted, and used in a pile foundation construction of a large diameter steel pipe pile of more than 3 meters or a large diameter armored concrete pipe pile. A lower end of the adjustable vibrohammer of equipment is arranged uniformly and fixed on a fixed beam; an upper end is fixedly connected with a hanging beam by a spring or other vibration absorbers; the vibrohammers are rigidly connected with each other by a gimbal coupling and a synchronizer of a bevel gear; a plurality of pile chucks are arranged on an under part of the fixed beam; the start-up, the close-down and the adjustment of the eccentric moment of the adjustable vibrohammer of the equipment are electrically controlled by a hydraulic system. The functions of the stepless adjustment of the start-up, the close-down, an amplitude, and the correction of the pile-sinking under a zero eccentric moment are newly increased to the equipment, which solves the problems that a hoist resonates; a noise is big; a starting current is large; an alignment is not good; and the pile can not be corrected in the pile-sinking.

Description

Adjustable eccentric moment vibrohammer interlocking equipment
Technical field title of the present utility model is: adjustable eccentric moment vibrohammer (hereinafter to be referred as adjustable vibrohammer) interlocking equipment.Be applicable to the pile foundation construction of major diameter (diameter is more than 3 meters) steel pipe pile and the stake of major diameter reinforced concrete pipe column.
Along with the development and utilization of marine resources, the increasing of the maximization of port and pier and exploitation man-made island, projects such as building bridge spanning the sea etc., large-scale steel pipe pile is used gradually.At present domestic to have begun to adopt diameter be the large-scale steel pipe stake of 13.5M, and in recent construction, the stake diameter has the trend of increase.The soil layer that large diameter steel pipe is sunk under the water, effective method is the interlocking equipment that adopts many vibrohammers, therefore the interlocking equipment of research and development and design vibrohammer has become domestic emphasis problem.
What background technology adopted in the large-scale steel pipe pile foundation construction at present is the external nonadjustable vibrohammer interlocking equipment of producing of eccentric moment, and this equipment is import China.There are some problems in this vibrohammer interlocking equipment, and the one, the eccentric moment of vibrohammer is non-adjustable, and moment is big when making startup, shutdown, and crane gear is produced resonance, the work noise height, starting current is big; The 2nd, because several vibrating hammers remain with vibrating with eccentric moment frequently, stake is bad to neutrality when making its construction, and the efficient of equipment is low, can not correct the perpendicularity deviation in the pile driving process.
Summary of the invention starts in order to overcome existing vibrohammer interlocking equipment, eccentric moment is big and can not be to the deficiency of stake correction when shutting down, and the utility model provides a kind of advanced person, novel vibrohammer interlocking equipment.This equipment can not only make equipment start under zero eccentric moment situation, shut down, and can realize the deviation-correcting function to stake by to each adjustable vibrohammer eccentric moment packet synchronization or divide other stepless adjustment.
The technical scheme that its technical problem that solves the utility model adopts is: select for use the adjustable vibrohammer of two or two above same models to be combined into the interlock pile driving equipment; each pile monkey is uniform to be fixed on the clamped beam of its below; the top is suspended on the hanging beam by shock absorber; a corresponding power transmission shaft is rigidly connected by the bevel gear synchronized by gimbal coupling each other; pile chuck is equipped with in clamped beam below, have automatically controlled and HYDRAULIC CONTROL SYSTEM integral device startup, shutdown and pile monkey eccentric moment synchronously, packet synchronization or divide other stepless adjustment.The size of each adjustable vibrohammer eccentric moment is adjusted in synchronous or uniform grouping (is a group with the pile monkey that is evenly distributed on the pile tube) synchronously, and pile tube produces with frequently with the vibration of the width of cloth, and the stepless variation of the big I of amplitude; Any size of dividing into groups or adjusting each adjustable vibrohammer eccentric moment respectively makes the pile tube periphery produce the vibration that amplitude varies in size, and finishes the deviation-correcting function in the pile driving process.
The beneficial effect of this equipment is:
1. under zero eccentric moment, start and shutdown, reduced the impact of starting current, overcome the resonance that when shutting down crane is produced, save the energy, long service life, low, the construction safety of noise electrical network.
2. synchronous or uniform packet synchronization is adjusted many vibrohammer eccentric moment sizes, can change the pile tube amplitude with adapt to different soil properties, soil layer changes, stake good to neutrality.
3. need divide into groups or adjust respectively the eccentric moment of many vibrohammers with construction arbitrarily, make the pile tube periphery produce the vibration that amplitude varies in size, make this equipment possess unique deviation-correcting function and also improved pile sinking speed effectively.
Appended drawings 1 is that this equipment that the adjustable vibrating hammer of Yi Sitai is formed is the equipment basic structure sketch of example.
Accompanying drawing 1 is explained:
The 1--hanging beam; The 2--shock absorber; Four adjustable eccentric moment of 3--vibrohammer;
The 4--clamped beam; 5--pile chuck (chuck); Four pairs of gimbal couplings of 6--;
7-bevel gear synchronized; The 8--control box; 9-cable, oil pipe.
The specific embodiment (moving with four All-China Federation of Taiwan Compatriots is example, referring to Figure of description)
1. start: it is zero that the hydraulic control operation makes the eccentric moment of four vibrating hammers, and motor synchronous starts (bevel gear lazy-tongs make four hammer rigidity synchronous), and this moment, amplitude was zero, the integral device smooth starting, and centering is adjusted in the stake position.
2.
(1) heavy, pile pulling: according to the situation of job site soil layer and soil property, adjust the eccentric moment (scope by 0 to maximum) of 1,3 (or 2,4) number pile monkey by control system, the eccentric moment of adjusting two pile monkeys in addition more synchronously begins to maximum (also can 1,2,3,4 machines adjust synchronously) pile sinking by 0.The amplitude of equipment can need and corresponding adjustment with construction in this process, and with width of cloth vibration, can vertically sink in the soil layer by stake with frequently for pile tube.
(2) perpendicularity deviation of correction stake in pile driving process: according to any eccentric moment of dividing into groups or adjusting four pile monkeys respectively of steel pipe pile verticality drift condition, make the vibration of pile tube periphery generation various amplitude, thereby correct the piling bar inclination that has taken place.After treating the verticality correcting inclination, adjust each adjustable vibrohammer again, make pile tube continue vertical subsidence with identical eccentric moment work.
3. shut down: before the shutdown, the eccentric moment of adjusting each pile monkey by the uniform grouping of control system is to zero, but also the eccentric moment of each pile monkey is adjusted into zero synchronously, shutdown.

Claims (3)

1. adjustable eccentric moment vibrohammer interlocking equipment, it is by 2 or many uniform being installed on the clamped beam of same model adjustable eccentric moment vibrohammer, the clamped beam lower end is equipped with pile chuck, each vibrating hammer is suspended on the hanging beam by shock absorber and constitutes, and it is characterized in that: the output of the output of a power transmission shaft of adjustable eccentric moment vibrohammer and the corresponding power transmission shaft of another adjustable eccentric moment vibrohammer is by the Hooks coupling universal coupling rigid connection.
2. adjustable eccentric moment vibrohammer interlocking equipment according to claim 1 is characterized in that: the fixing gimbal coupling of many corresponding power transmission shaft outputs of vibrohammer is respectively with the corresponding output shaft rigid connection of bevel gear synchronized.
3. adjustable eccentric moment vibrohammer interlocking equipment according to claim 1, it is characterized in that: each vibrohammer is furnished with performance identical independently automatically controlled, hydraulic control control box respectively, the control circuit of each control box with can the centralized-control box that vibrohammer carries out wired remote control operation be linked.
CN 03200442 2003-01-08 2003-01-08 Eccentric moment regulatable viberating pile hammer linkage Expired - Fee Related CN2659964Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03200442 CN2659964Y (en) 2003-01-08 2003-01-08 Eccentric moment regulatable viberating pile hammer linkage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03200442 CN2659964Y (en) 2003-01-08 2003-01-08 Eccentric moment regulatable viberating pile hammer linkage

Publications (1)

Publication Number Publication Date
CN2659964Y true CN2659964Y (en) 2004-12-01

Family

ID=34324135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03200442 Expired - Fee Related CN2659964Y (en) 2003-01-08 2003-01-08 Eccentric moment regulatable viberating pile hammer linkage

Country Status (1)

Country Link
CN (1) CN2659964Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104195A (en) * 2013-01-29 2013-05-15 中联重科股份有限公司 Deviation rectifying method, device and system of all casing drilling machine
CN104278675A (en) * 2014-09-29 2015-01-14 东北大学 Four-hydraulic-motor-driven self-synchronizing vibrating hammer and structural parameter determining method thereof
CN104674820A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Novel surrounding structure system and construction method for reducing vibration
CN108071117A (en) * 2017-10-11 2018-05-25 成都措普科技有限公司 A kind of environmentally friendly easily water conservancy projects
CN109989401A (en) * 2019-05-10 2019-07-09 江苏巨威机械有限公司 Guide rod type tilt cylinder hydraulic pile hammer
CN114622587A (en) * 2022-03-01 2022-06-14 上海市基础工程集团有限公司 Large-size concrete open caisson sinking process
CN115075244A (en) * 2022-06-08 2022-09-20 上海振力工程机械设备有限公司 Vibrating pile driving equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104195A (en) * 2013-01-29 2013-05-15 中联重科股份有限公司 Deviation rectifying method, device and system of all casing drilling machine
CN103104195B (en) * 2013-01-29 2015-03-25 中联重科股份有限公司 Deviation rectifying method, device and system of all casing drilling machine
CN104674820A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Novel surrounding structure system and construction method for reducing vibration
CN104278675A (en) * 2014-09-29 2015-01-14 东北大学 Four-hydraulic-motor-driven self-synchronizing vibrating hammer and structural parameter determining method thereof
CN104278675B (en) * 2014-09-29 2016-01-20 东北大学 A kind of four fluid motor-driven self-synchronous vibration hammer and structural parameter determining methods thereof
CN108071117A (en) * 2017-10-11 2018-05-25 成都措普科技有限公司 A kind of environmentally friendly easily water conservancy projects
CN109989401A (en) * 2019-05-10 2019-07-09 江苏巨威机械有限公司 Guide rod type tilt cylinder hydraulic pile hammer
CN114622587A (en) * 2022-03-01 2022-06-14 上海市基础工程集团有限公司 Large-size concrete open caisson sinking process
CN115075244A (en) * 2022-06-08 2022-09-20 上海振力工程机械设备有限公司 Vibrating pile driving equipment

Similar Documents

Publication Publication Date Title
CN112009635A (en) Semi-submersible type wind power generation foundation platform and installation method thereof
CN2659964Y (en) Eccentric moment regulatable viberating pile hammer linkage
CN102400469A (en) Secant pile drum type foundation and construction method thereof
CN113653601B (en) Semi-submersible floating type fan device and system
CN102587374B (en) Perpendicularity control process for single-tubular-pile foundation of offshore intertidal wind farm
CN103243732A (en) Installing method of marine anemometer tower base structure
CN212290238U (en) Semi-submersible wind power generation foundation platform
CN202247927U (en) Barrel-shaped foundation with occlusive piles
CN102839667B (en) A kind of high-power electric-driven vibratory hammer for sand compaction pile construction
CN106080997A (en) Marine floating carrying platform and the method for construction of photovoltaic plant
CN102628277B (en) Transition section-free monopile offshore wind turbine foundation structure
CN106602980A (en) Desert land root-type photovoltaic panel solar power generation device
CN104895130B (en) One kind is applied to tilt solid rock location construction method of underground continuous wall
CN202450543U (en) Foundation structure of novel guide frame-type marine anemometer tower
CN202830914U (en) High-power electric-driven vibratory hammer for sand compaction pile construction
CN115126932A (en) Construction pipeline laying device for municipal construction and use method thereof
CN201459727U (en) Pile driving frame of vibratory pile hammer
CN214383928U (en) Novel offshore anemometer tower foundation platform
CN211006604U (en) Offshore wind turbine generator system positioning support guide frame
CN206461552U (en) Take root formula photovoltaic plate solar TRT in a kind of desert region
CN113931188A (en) Pile gripper for monitoring perpendicularity of pile body through angle change of telescopic boom and operation method of pile gripper
CN202745081U (en) Large-size rubble concrete settlement joint template system
CN212288041U (en) Improved structure of prestressed concrete pipe vibration forming equipment
CN102102487A (en) Multifunctional hydraulic pile hammer
CN205744269U (en) Archimedes's floating wave energy generating set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ROOM N1201, JINGBAO GARDEN, NO. 183, ANDINGMENWAID

Free format text: FORMER NAME OR ADDRESS: ROOM 701, SHIYUAN BUILDING, NO. 57, YI, ANDINGMENWAIDA STREET, DONGCHENG DISTRICT, BEIJING CITY

CP03 Change of name, title or address

Patentee address after: Room N1201, Beijing precious garden, 183 anding street, Dongcheng District, Beijing

Patentee address before: Beijing Dongcheng District Andingmen Street No. 57 B Shiyuan building room 701

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Li Xu

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20041201