CN2642929Y - Highrise building wall climbing formwork device - Google Patents

Highrise building wall climbing formwork device Download PDF

Info

Publication number
CN2642929Y
CN2642929Y CN 03279455 CN03279455U CN2642929Y CN 2642929 Y CN2642929 Y CN 2642929Y CN 03279455 CN03279455 CN 03279455 CN 03279455 U CN03279455 U CN 03279455U CN 2642929 Y CN2642929 Y CN 2642929Y
Authority
CN
China
Prior art keywords
support
lifting
utility
model
working platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03279455
Other languages
Chinese (zh)
Inventor
张兵
曹向东
卞连珍
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03279455 priority Critical patent/CN2642929Y/en
Application granted granted Critical
Publication of CN2642929Y publication Critical patent/CN2642929Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a high building wall climbing formwork device, which comprises a lifting bracket, a lifting device and a formwork etc. The utility model is characterized in that a platform casing bracket beam for the erection of a working platform is sleeved on the lifting bracket. The working platform is lifted simultaneously with the alternate lifting of the lifting bracket, so that the working platform and the lifting bracket are lifted at a same level synchronously without the assistant hoisting of a tower crane. The utility model also has the advantages of the improvement of the construction condition, the advancement of the construction quality and the guarantee of the construction security etc.

Description

Highrise building body of wall climbing template device
The utility model relates to a kind of highrise building body of wall climbing template device.
Existing highrise building or structure reinforced concrete wall climbing template device have the exterior wall creeping formwork, interior wall creeping formwork etc., its something in common is that template and climbing frame promote mutually, climbing frame is attached to and waters on the reinforced concrete structure of smashing, climbing shuttering at first, behind the interior disturbing concrete of template, the climbing frame of turning back again to promote, circulation so repeatedly, thereby realize the mutual lifting of climbing frame and template, because each climbing frame is to promote mutually with corresponding template, the motion of each climbing frame is difficult to strengthen on the whole resistance to overturning, be difficult on the existing climbing frame group to be provided with can easy disassembly working platform satisfy the needs of the integrated climbform construction of building or structure, and the overall work large platform be in the building in the exterior wall integrated climbform Stability Analysis of Structures and constructing operation necessary.
The purpose of this utility model provides and a kind ofly connects working platform and realize climbing frame and the whole climbing template device of the mutual highrise building wall that promotes of climbing frame.
Task of the present utility model is to realize like this.Climbing template device is formed by promoting support, lifting means, template etc., it is characterized in that: on the lifting support, the platform upper jacket frame beam that is used for the work in combination platform is housed, the platform upper jacket frame beam is promoting on the support through adjustable support latch beam support, platform upper jacket frame beam supporting working platform.Adjusting screw is arranged to regulate the stressing conditions of platform upper jacket frame beam and lifting support on the adjustable support latch beam, guarantee stressed minute balancing of climbing frame group, guarantee safe construction.In the construction all are promoted support and be divided into two groups of first, second, when first group supporting working platform, the off-load of second group realizes promoting; Then, second group supporting working platform, the off-load simultaneously of first group, and realize promoting.Thereby first, second realizes mutual the lifting for two groups.Promote in the mutual process that promotes of support at two groups, working platform also promotes thereupon.
Fig. 1 is the utility model climbing template device schematic diagram
Fig. 2 is the utility model adjustable support latch beam oblique view
Now the utility model is described in further detail in conjunction with the accompanying drawings.The utility model is by promoting support (1), lifting means (2), template compositions such as (3).Promoting support (1) bottom has support anchor structure (4), by means of anchoring supporting screw (5) with watered the reinforced concrete structure anchoring of smashing.Platform upper jacket frame beam (7) is bearing in by means of adjustable support latch beam (8) and promotes on the support (1), and adjusts the location with screw rod (9).Adjustable support latch beam (8) frame is supporting the load of platform upper jacket frame beam (7) promoting support (1) two pillar internode, and adjustable support latch beam (8) mat is borrowed the stressing conditions of regulating platform upper jacket frame beam (7) and lifting support (1) in adjusting screw (6).On lifting support (1) platform cover upper jacket frame beam (7) lifting means (2) is housed, they can be hydraulic pressure or mechanical driving device.
The utility model has solved the key technical problem of lifting support (1) with the working platform bind mode, owing to proposed the structure-design technique scheme of platform upper jacket frame beam (7), promote support (1) carrying and unloading and need only by between platform upper jacket frame beam (7) and lifting support (1), inserting or extract out adjustable support latch beam (8) and can successfully finish, thereby guarantee promoting support (1) upward work in combination platform, the mutual realization that promotes of lifting support (1).
In the building operations real domain, generally use plural the utility model climbing template device, in the construction of large-scale tall buildings or structure, use a large amount of the utility model climbing template devices.Comprise interior wall creeping formwork and exterior wall creeping formwork, interior wall or Climbing frame for outer-wall respectively can be divided into two groups, two groups promote alternately, alternately support and promote working platform.Form colony together with working platform around structure under construction or structure owing to promote support, the lifting support of interior wall or exterior wall respectively is divided into two groups.Two group memberships are therebetween irregular mutually, and when the first group promoted the bracket supports working platform, the second group promoted support and can freely promote synchronously, entirely lifts by crane working platform then synchronously, and meanwhile the first group promotes.Each promotes bracket coordination and is synchronized with the movement, and is stressed even, thereby guarantees construction safety.No matter adopt the utility model, be interior wall or exterior wall creeping formwork, can once promote a level height.Owing to promoting on the support group and can working platform be set, be particularly conducive to and improve condition of work high-rise, construction of super highrise building around building or structure external and internal wall.Promote alternately owing to promote support, therefore do not need with the auxiliary liter that hangs of tower machine.

Claims (2)

1. a highrise building body of wall climbing template device comprises promoting support (1), lifting means (2), template (3) etc., it is characterized in that: promote on the support (1) platform upper jacket frame beam (7) is housed.
2. by the described climbing template device of claim 1, it is characterized in that:
A, described platform upper jacket frame beam (7) are bearing in through adjustable support latch beam (8) and promote on the support (1);
Locate by bolt (9) between b, platform upper jacket frame beam (7) and the lifting support (1);
On c, the adjustable support latch beam (8) adjusting screw (6) is housed.
CN 03279455 2003-09-20 2003-09-20 Highrise building wall climbing formwork device Expired - Fee Related CN2642929Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03279455 CN2642929Y (en) 2003-09-20 2003-09-20 Highrise building wall climbing formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03279455 CN2642929Y (en) 2003-09-20 2003-09-20 Highrise building wall climbing formwork device

Publications (1)

Publication Number Publication Date
CN2642929Y true CN2642929Y (en) 2004-09-22

Family

ID=34303452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03279455 Expired - Fee Related CN2642929Y (en) 2003-09-20 2003-09-20 Highrise building wall climbing formwork device

Country Status (1)

Country Link
CN (1) CN2642929Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839545A (en) * 2016-05-16 2016-08-10 中铁十六局集团第五工程有限公司 One-way variable-cross-section adjustable turnover formwork and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839545A (en) * 2016-05-16 2016-08-10 中铁十六局集团第五工程有限公司 One-way variable-cross-section adjustable turnover formwork and construction method thereof

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN201567803U (en) Temporary support device for steel structure hoisting construction
CN201232353Y (en) High pier lifting type turnover formwork platform hanger
CN104989121B (en) A kind of steel slideway jacking architecture adding-floor device
CN2642929Y (en) Highrise building wall climbing formwork device
CN2135614Y (en) Formwork lifting device for storied-building wall
CN207700658U (en) New type scaffold in a kind of building field
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN207647168U (en) A kind of construction hydraulic formwork climbing device
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
CN1048066C (en) Method and apparatus for integrally self-lifting scaffold
CN206752675U (en) A kind of concrete frame node
CN212897749U (en) Building reinforcement appurtenance
CN212334721U (en) Integrated filler gas dissolving device
CN212336023U (en) Civil engineering is with small-size building pile driver
CN209891688U (en) High building quick-building safe construction foot rest
CN202023363U (en) High-rise wall-attached climbing formwork for building operations
CN106869036B (en) Novel bridge precast beam
CN208917660U (en) Cast-in-place landscape arch bridge
CN204662933U (en) A kind of hoistway operation frame lift-type steel platform
CN213268782U (en) High-rise building construction lifting device
CN204898509U (en) Box steel bridge mound of bucking power consumption structure is prevented in root setting
CN212153432U (en) H-shaped steel combined base of house
CN213654178U (en) Support for civil engineering
CN214272050U (en) High groundwater level area water pump house supporting construction structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee