CN2640584Y - Integrated equipment for desulfurizing and discharging smoke - Google Patents

Integrated equipment for desulfurizing and discharging smoke Download PDF

Info

Publication number
CN2640584Y
CN2640584Y CN 03279358 CN03279358U CN2640584Y CN 2640584 Y CN2640584 Y CN 2640584Y CN 03279358 CN03279358 CN 03279358 CN 03279358 U CN03279358 U CN 03279358U CN 2640584 Y CN2640584 Y CN 2640584Y
Authority
CN
China
Prior art keywords
smoke
flue gas
gas
desulfurizing
gas processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03279358
Other languages
Chinese (zh)
Inventor
徐长香
罗静
傅国光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Century Jiangnan Environmental Protection Co., Ltd.
Original Assignee
ZHENJIANG JIANGNAN ENVIRONMENT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG JIANGNAN ENVIRONMENT filed Critical ZHENJIANG JIANGNAN ENVIRONMENT
Priority to CN 03279358 priority Critical patent/CN2640584Y/en
Application granted granted Critical
Publication of CN2640584Y publication Critical patent/CN2640584Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model relates to an environmental protection device, in particular to an exhaust smoke desulfurization which is used for exhausting flue gas from a coal burning boiling. The utility model has a desulfurization tower under which a smoke inlet is arranged, and an exhausting chimney is connected with the top of the desulfurization tower directly. The inner chamber of the desulfurization tower is provided with multigrade smoke and gas processing segment, and a straying device is arranged on every smoke and gas processing segment; a gas distributing device is arranged between the two adjacent smoke and gas processing segments, also a defogger and a hydroextractor are arranged between the last smoke and gas processing segment. The utility model can exhaust the smoke and the gas and desulphurize the smoke and gas at the same time so that the smoke and the gas can be purified, the height of the chimney in the device are reduced and investment is saved.

Description

Desulfurizing and Exhaust Fume Integrated Apparatus
Technical field
The utility model belongs to environmental protection equipment, relates to a kind of Desulfurizing and Exhaust Fume Integrated Apparatus that is used for the fire coal boiler fume discharging.
Background technology
Existing coal-burning boiler all will be provided with a tall and big chimney, low then tens meters, the then hundreds of rice of height, its investment cost is huge, take bigger area and space, its purpose is just in order to lift the basket height for one of flue gas, be beneficial to the diffusion of flue gas, reduce of the direct pollution of pernicious gas such as SO2 in the flue gas ground.
Summary of the invention
Technical problem to be solved in the utility model is, a short Desulfurizing and Exhaust Fume Integrated Apparatus is provided, make it in the discharging flue gas, carry out desulfurization and handle flue gas, thereby can purify chimney in flue gas, the reduction equipment height, reduce investment outlay.
Desulfurizing and Exhaust Fume Integrated Apparatus of the present utility model includes a desulfurizing tower, in the desulfurizing tower bottom into mouth is arranged, and the top of desulfurizing tower directly is connected with a smoke evacuation chimney.The inner chamber of described desulfurizing tower is provided with the multistage flue gas processing section that is used for carrying out dedusting, desulfurization from the bottom to top, the top of each grade flue gas processing section is provided with a spray equipment that is used for spraying desulfurizing agent and cooling liquid, be provided with between each grade flue gas processing section and the back one-level flue gas processing section and be used for making the homodisperse gas distributor of the flue gas that passes through, demister and dehydrator in the end also are set, in order to remove the desulfurizing agent water smoke in the flue gas between the chimney at one-level flue gas processing section and top.
The utility model is owing to be provided with a desulfurizing tower below chimney, when flue gas is passed through can with the desulfurizing agent fast reaction in the tower, finish cooling, dedusting and sweetening process, and then by smoke stack emission, reduced the pollution of flue gas greatly, thereby the height of lower chimney can be set, saved investment.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in the figure, this Desulfurizing and Exhaust Fume Integrated Apparatus includes a desulfurizing tower 1, and into mouth 2 is arranged in the desulfurizing tower bottom, and the top of desulfurizing tower directly is connected with a smoke evacuation chimney 3.Multistage flue gas processing section 4 is set in the inner chamber of desulfurizing tower, and the top of each grade flue gas processing section is provided with a spray equipment 5, the desulfurizing agent that is used for spraying cooling liquid and reacts with flue gas; Through multistage gas distributor 6, flue gas is evenly disperseed in the flue gas uphill process, be beneficial to fully react with desulfurizing agent; Demister 7 and dehydrator 8 in the end also are set, in order to remove the desulfurizing agent water smoke in the flue gas between the chimney at one-level flue gas processing section and top.

Claims (2)

1, a kind of Desulfurizing and Exhaust Fume Integrated Apparatus is characterized in that: it includes a desulfurizing tower (1), and into mouth (2) is arranged in the desulfurizing tower bottom, and the top of desulfurizing tower directly is connected with a smoke evacuation chimney (3).
2, Desulfurizing and Exhaust Fume Integrated Apparatus according to claim 1, it is characterized in that: the inner chamber of described desulfurizing tower (1) is provided with multistage flue gas processing section (4) from the bottom to top, the top of each grade flue gas processing section is provided with spray equipment (5), be provided with gas distributor (6) between each grade flue gas processing section and the back one-level flue gas processing section, demister (7) and dehydrator (8) in the end also are set between the chimney at one-level flue gas processing section and top.
CN 03279358 2003-09-17 2003-09-17 Integrated equipment for desulfurizing and discharging smoke Expired - Lifetime CN2640584Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03279358 CN2640584Y (en) 2003-09-17 2003-09-17 Integrated equipment for desulfurizing and discharging smoke

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03279358 CN2640584Y (en) 2003-09-17 2003-09-17 Integrated equipment for desulfurizing and discharging smoke

Publications (1)

Publication Number Publication Date
CN2640584Y true CN2640584Y (en) 2004-09-15

Family

ID=34303419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03279358 Expired - Lifetime CN2640584Y (en) 2003-09-17 2003-09-17 Integrated equipment for desulfurizing and discharging smoke

Country Status (1)

Country Link
CN (1) CN2640584Y (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100357014C (en) * 2006-01-06 2007-12-26 易晓辉 Chimney desulfurizing tower integrated desulfurizing process and apparatus thereof
CN101254392B (en) * 2007-02-28 2011-01-12 向瑞先 Energy-saving type sodium sulphite circulation desulfurizing device and method
CN101987976A (en) * 2009-07-30 2011-03-23 鞍钢集团工程技术有限公司 Desulfurizing tower for gas desulfuration by using liquid phase catalytic oxidation
CN101601963B (en) * 2009-06-02 2012-07-04 张蕊 Smoke purification system and method thereof
CN105148649A (en) * 2015-08-31 2015-12-16 太仓英达锅炉设备有限公司 Flue gas dedusting and desulfurizing device
US10016721B1 (en) 2017-05-25 2018-07-10 Jiangnan Environmental Protection Group Inc. Ammonia-based desufurization process and apparatus
US10092877B1 (en) 2017-05-25 2018-10-09 Jiangnan Environmental Protection Group Inc. Dust removal and desulfurization of FCC exhaust gas
US10099170B1 (en) 2017-06-14 2018-10-16 Jiangnan Environmental Protection Group Inc. Ammonia-adding system for ammonia-based desulfurization device
US10112145B1 (en) 2017-09-07 2018-10-30 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
US20190001267A1 (en) 2017-07-03 2019-01-03 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10207220B2 (en) 2017-03-15 2019-02-19 Jiangnan Environmental Protection Group Inc. Method and apparatus for removing sulfur oxides from gas
US10953365B2 (en) 2018-07-20 2021-03-23 Jiangnan Environmental Protection Group Inc. Acid gas treatment
US11027234B2 (en) 2018-04-13 2021-06-08 Jiangnan Environmental Protection Group Inc. Oxidization of ammonia desulfurization solution
US11224838B2 (en) 2019-12-26 2022-01-18 Jiangnan Environmental Protection Group Inc. Controlling aerosol production during absorption in ammonia-based desulfurization

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100357014C (en) * 2006-01-06 2007-12-26 易晓辉 Chimney desulfurizing tower integrated desulfurizing process and apparatus thereof
CN101254392B (en) * 2007-02-28 2011-01-12 向瑞先 Energy-saving type sodium sulphite circulation desulfurizing device and method
CN101601963B (en) * 2009-06-02 2012-07-04 张蕊 Smoke purification system and method thereof
CN101987976A (en) * 2009-07-30 2011-03-23 鞍钢集团工程技术有限公司 Desulfurizing tower for gas desulfuration by using liquid phase catalytic oxidation
CN101987976B (en) * 2009-07-30 2013-06-26 鞍钢集团工程技术有限公司 Desulfurizing tower for gas desulfuration by using liquid phase catalytic oxidation
CN105148649A (en) * 2015-08-31 2015-12-16 太仓英达锅炉设备有限公司 Flue gas dedusting and desulfurizing device
US10207220B2 (en) 2017-03-15 2019-02-19 Jiangnan Environmental Protection Group Inc. Method and apparatus for removing sulfur oxides from gas
US10675584B2 (en) 2017-03-15 2020-06-09 Jiangnan Environmental Protection Group Inc. Method and apparatus for removing sulfur oxides from gas
US10413864B2 (en) 2017-03-15 2019-09-17 Jiangnan Environmental Protection Group Inc. Method and apparatus for removing sulfur oxides from gas
US10406477B2 (en) 2017-03-15 2019-09-10 Jiangnan Environmental Protection Group Inc. Method and apparatus for removing sulfur oxides from gas
US10561982B2 (en) 2017-05-25 2020-02-18 Jiangnan Environmental Protection Group Inc. Ammonia-based desulfurization process and apparatus
US10406478B2 (en) 2017-05-25 2019-09-10 Jiangnan Environmental Protection Group Inc. Ammonia-based desulfurization process and apparatus
US10016721B1 (en) 2017-05-25 2018-07-10 Jiangnan Environmental Protection Group Inc. Ammonia-based desufurization process and apparatus
US10213739B2 (en) 2017-05-25 2019-02-26 Jiangnan Environmental Protection Group Inc. Dust removal and desulfurization of FCC exhaust gas
US10343110B2 (en) 2017-05-25 2019-07-09 Jiangnan Environmental Protection Group Inc. Dust removal and desulfurization of FCC exhaust gas
US10092877B1 (en) 2017-05-25 2018-10-09 Jiangnan Environmental Protection Group Inc. Dust removal and desulfurization of FCC exhaust gas
US10471383B2 (en) 2017-05-25 2019-11-12 Jiangnan Environmental Protection Group Inc. Dust removal and desulfurization of FCC exhaust gas
US10399033B2 (en) 2017-05-25 2019-09-03 Jiangnan Environmental Protection Group Inc. Ammonia-based desulfurization process and apparatus
US10413865B2 (en) 2017-05-25 2019-09-17 Jiangnan Enviromental Protection Group Inc. Ammonia-based desulfurization process and apparatus
US10583386B2 (en) 2017-06-14 2020-03-10 Jiangnan Environmental Protection Group Inc. Ammonia-adding system for ammonia-based desulfurization device
US10589212B2 (en) 2017-06-14 2020-03-17 Jiangnan Environmental Protection Group Inc. Ammonia-adding system for ammonia-based desulfurization device
US10099170B1 (en) 2017-06-14 2018-10-16 Jiangnan Environmental Protection Group Inc. Ammonia-adding system for ammonia-based desulfurization device
US10159929B1 (en) 2017-06-14 2018-12-25 Jiangnan Environmental Protection Group Inc. Ammonia-adding system for ammonia-based desulfurization device
US10561984B2 (en) 2017-07-03 2020-02-18 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US20190001267A1 (en) 2017-07-03 2019-01-03 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10421040B2 (en) 2017-07-03 2019-09-24 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10556205B2 (en) 2017-07-03 2020-02-11 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10618001B2 (en) 2017-07-03 2020-04-14 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10427097B2 (en) 2017-07-03 2019-10-01 Jiangnan Environmental Protection Group Inc. Desulfurization absorption tower
US10357741B2 (en) 2017-09-07 2019-07-23 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
US10112145B1 (en) 2017-09-07 2018-10-30 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
US10449488B2 (en) 2017-09-07 2019-10-22 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
US10369517B2 (en) 2017-09-07 2019-08-06 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
US11027234B2 (en) 2018-04-13 2021-06-08 Jiangnan Environmental Protection Group Inc. Oxidization of ammonia desulfurization solution
US10953365B2 (en) 2018-07-20 2021-03-23 Jiangnan Environmental Protection Group Inc. Acid gas treatment
US11529584B2 (en) 2018-07-20 2022-12-20 Jiangnan Environmental Protection Group Inc. Acid gas treatment
US11224838B2 (en) 2019-12-26 2022-01-18 Jiangnan Environmental Protection Group Inc. Controlling aerosol production during absorption in ammonia-based desulfurization

Similar Documents

Publication Publication Date Title
CN2640584Y (en) Integrated equipment for desulfurizing and discharging smoke
CN101892343A (en) Converter gas dry-dedusting system and using method thereof
CN103736381B (en) Dust removal device and dust removal method for sintering flue gas by shunted and graded desulfurization
CN107596798A (en) A kind of pre- dedusting and desulphurization and denitration integrated treatment unit and method
CN110585906A (en) Hazardous waste high-temperature flue gas treatment process
CN202237682U (en) Three-stage dust-removing and desulphurizing device
CN103954140A (en) Sintering machine flue gas low-temperature denitration system and method thereof
CN101875993B (en) System for removing dust from converter gas by dry method and using method thereof
CN201889155U (en) Removal device for sulfur dioxide in smoke
CN2668235Y (en) High-speed smoke gas desulfurizing tower
CN210449216U (en) Active coke analysis system with early warning function
CN102003886A (en) Sintering machine flue gas separation conduction type desulfurizing device and method
CN2644427Y (en) Tamp coke oven smoke prevention and dust control vehicle
CN208694686U (en) A kind of flue gas for power industry wet desulphurization takes off white system
CN201168535Y (en) Continuous flue gas desulfurization dust removing integrated purification system
CN203400616U (en) Flue gas cooling system
CN204952637U (en) Double tower SOx/NOx control equipment
CN211302633U (en) Multistage atomization semidry method desulfurization device
CN206881452U (en) Desulfurization system based on phase change active coke dry method
CN103537187A (en) Sulfur dioxide enriched gas purification system and method for preparing sulfur by gas purification
CN102757164A (en) Device and method for denitration and treating sludge containing organic matter by utilizing dry-method rotary kiln
CN202951385U (en) Integrated desulfurization dust collector
CN207429853U (en) A kind of pre- dedusting and desulphurization and denitration integrated treatment unit
CN202675327U (en) Novel flue deduster
CN202666681U (en) Pretreatment device at inlet of flue gas desulfurization tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU JIANGNAN CENTURY ENVIRONMENTAL PROTECTION

Free format text: FORMER OWNER: JIANGNAN INSTITUTE OF ENVIRONMENTAL PROTECTION EQUIPMENT, JIANG CITY, TOWN

Effective date: 20071228

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20071228

Address after: Jiangning national high tech Development Zone, Tianyuan road Nanjing city Jiangsu province Easthigh International Building No. 108, 11/12 zip code: 210000

Patentee after: Jiangsu Century Jiangnan Environment Protecting Co., Ltd

Address before: Zhenjiang City, Jiangsu Province Economic Development Zone No. 18 Po Jianli, zip code: 212009

Patentee before: Zhenjiang Jiangnan Environmental Protection Equipment Inst.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081128

Address after: Jiangning national high tech Development Zone, Tianyuan road Nanjing city Jiangsu province Easthigh International Building No. 108, 11/12 zip code: 210000

Patentee after: Jiangsu Jiangnan Environment Protection and Research Academy

Address before: Jiangning national high tech Development Zone, Tianyuan road Nanjing city Jiangsu province Easthigh International Building No. 108, 11/12 zip code: 210000

Patentee before: Jiangsu Century Jiangnan Environment Protecting Co., Ltd

EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhenjiang Jiangnan Environmental Protection Engineering Construction Co., Ltd.

Assignor: Jiangsu Century Jiangnan Environment Protecting Co., Ltd

Contract fulfillment period: 2007.12.29 to 2013.9.17

Contract record no.: 2008320000587

Denomination of utility model: Integrated equipment for desulfurizing and discharging smoke

Granted publication date: 20040915

License type: Exclusive license

Record date: 20081007

ASS Succession or assignment of patent right

Owner name: JIANGSU XINSHIJI JIANGNAN ENVIRONMENT PROTECTION C

Free format text: FORMER OWNER: JIANGSU JIANGNAN CENTURY ENVIRONMENTAL PROTECTION CO., LTD.

Effective date: 20081128

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.12.29 TO 2013.9.17; CHANGE OF CONTRACT

Name of requester: ZHENJIANG JIANGNAN ENVIRONMENTAL ENGINEERING CONST

Effective date: 20081007

C56 Change in the name or address of the patentee

Owner name: JIANGSU NEW CENTURY JIANGNAN ENVIRONMENTAL PROTECT

Free format text: FORMER NAME: JIANGSU XINSHIJI JIANGNAN ENVIRONMENTAL PROTECTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Jiangning national high tech Development Zone, Tianyuan road Nanjing city Jiangsu province 210000 Easthigh International Building No. 108 11/12

Patentee after: Jiangsu New Century Jiangnan Environmental Protection Co., Ltd.

Address before: Jiangning national high tech Development Zone, Tianyuan road Nanjing city Jiangsu province 210000 Easthigh International Building No. 108 11/12

Patentee before: Jiangsu Jiangnan Environment Protection and Research Academy

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20130917

Granted publication date: 20040915