CN2639723Y - Tower type evacuation torth head changing device - Google Patents

Tower type evacuation torth head changing device Download PDF

Info

Publication number
CN2639723Y
CN2639723Y CN 03214413 CN03214413U CN2639723Y CN 2639723 Y CN2639723 Y CN 2639723Y CN 03214413 CN03214413 CN 03214413 CN 03214413 U CN03214413 U CN 03214413U CN 2639723 Y CN2639723 Y CN 2639723Y
Authority
CN
China
Prior art keywords
flare
suspension bracket
roller
installing
tower
Prior art date
Application number
CN 03214413
Other languages
Chinese (zh)
Inventor
姚春联
张广锋
郑方元
姜俊荣
王焕留
Original Assignee
胜利油田胜利石油化工建设有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胜利油田胜利石油化工建设有限责任公司 filed Critical 胜利油田胜利石油化工建设有限责任公司
Priority to CN 03214413 priority Critical patent/CN2639723Y/en
Application granted granted Critical
Publication of CN2639723Y publication Critical patent/CN2639723Y/en

Links

Abstract

The utility model provides a replacing device for tower expanding torches, belonging to a device used in petrochemical enterprises. The utility model is characterized in that: a rotary hanger is arranged on a torch tower frame through a load bearing device; a fixed pulley and a guide pulley are arranged in the upper part of the hanger; a hook is arranged at one end of the steel wire rope arranged on the fixed pulley and the guide pulley, and the other end is arranged on the hoist; the torch tower frame is also provided with a fixed hanger which is provided with a manual inverted chain at the upper part. The utility model has the advantages of convenient construction, high construction safety, short construction period and low construction cost.

Description

A kind of tower changing device on first watch of releasing flare

Technical field

The utility model relates to device used in a kind of petrochemical enterprise, especially a kind of tower changing device on first watch of releasing flare.

Background technology

Tower releasing flare is the requisite device of petrochemical enterprise more than 60 meters.Tower structure of releasing flare commonly used is made up of chimney and pylon two parts, and pylon is the triangle steel structure, and chimney comprises cylindrical shell and flare tip.After long-time the use, the burned damage of flare tip must in time be changed.Present domestic replacing flare tip adopts large-scale crane usually, and construction cost is higher, and working security is low.

Summary of the invention

Technical problem to be solved in the utility model is to provide a kind of tower changing device on first watch of releasing flare, to improve flare tip replacing safety of construction, reduction construction cost.

The utility model is to realize like this, a kind of tower changing device on first watch of releasing flare, it has and can be installed on the installing flare tower frame by load carrier by rotating suspension bracket, also have slewing equipment to be installed in the suspension bracket outside on the installing flare tower frame, the top of suspension bracket is equipped with fixed pulley and directive wheel, steel wire rope one end of installing on fixed pulley and the directive wheel has suspension hook, the other end to be installed on the hoist engine, and fixedly suspension bracket also is installed on installing flare tower frame, and fixedly the top of suspension bracket is equipped with manual chain hoist.

Adopt the tower changing device on first watch of releasing flare of said structure, easy construction, the working security height, the duration is short, and construction cost is low.

Description of drawings

Fig. 1 is the schematic diagram of the utility model structure.

Fig. 2 is the A-A profile of Fig. 1.

Fig. 3 is the B-B profile of Fig. 1.

Fig. 4 is the C-C profile of Fig. 1.

Among the figure, 1-steel wire rope, 2-load carrier, 3-slewing equipment, the 4-fixed pulley, 5-directive wheel, 6-suspension bracket, 7-manual chain hoist, 8-is suspension bracket fixedly, 9-chimney, 10-installing flare tower frame, 11-roller sleeve, the 12-roller, 13-stiffener, 14-fixed head, 15-roller filler ring, 16-roller sleeve, 17-roller, the 18-stiffener, 19-bearing plate, 20-hoist engine.

The specific embodiment

The embodiment that provides below in conjunction with accompanying drawing illustrates concrete structure of the present utility model and using method.

As shown in drawings, a kind of tower changing device on first watch of releasing flare of the utility model, it has and can be installed on the installing flare tower frame (10) by load carrier (2) by rotating suspension bracket (6), also have slewing equipment (3) to be installed in the suspension bracket outside on the installing flare tower frame, the top of suspension bracket is equipped with fixed pulley (4) and directive wheel (5), steel wire rope (1) one end of installing on fixed pulley and the directive wheel has suspension hook, the other end to be installed on the hoist engine (20), fixedly suspension bracket (8) also is installed on installing flare tower frame, and fixedly the top of suspension bracket is equipped with manual chain hoist (7).

On described load carrier (2), there is roller (17) to be positioned at the outside of suspension bracket (6), there is roller sleeve (16) outside of roller, has bearing plate (19) to be fixed on the installing flare tower frame (10) below the roller sleeve.Stiffener (18) can be arranged between roller sleeve and bearing plate.

On described slewing equipment (3), roller (12) is positioned at the outside of suspension bracket (6), and there is roller sleeve (11) outside of roller (12), and the outside of roller sleeve has fixed head (14) to be fixed on the installing flare tower frame (10).Stiffener (13) can be arranged between roller sleeve and fixed head, and can there be roller filler ring (15) the following of roller.

The roller lower end is designed to hemispherical, is filled with lubricating grease between each roller sleeve and the suspension bracket (6).

Suspension bracket (6), fixedly suspension bracket (8) is installed on the platform of installing flare tower frame, and hoist engine is installed on the ground.Suspension bracket, fixedly suspension bracket can select for use seamless steel pipe to make.

Suspension centre is selected in the flare tip top above the chimney (9).When carrying out flare tip replacing construction, suspension hook, the suspension hook on the manual chain hoist on the steel wire rope are hung in the flare tip top respectively.The flare tip that will change (comprise flare tip below one section cylindrical shell) is pulled down from chimney earlier, and its action by hoist engine is winched to ground.Then, with new flare tip (comprise flare tip below one section cylindrical shell), hang to the residing position of former flare tip by suspension hook.Behind the location, be fixed on the chimney.As required, suspension bracket (6) can turn round under the effect of external force (manpower) easily, and fixedly the manual chain hoist on the suspension bracket can cooperate the suspension hook on the suspension bracket (6), realizes the installation in position of flare tip.

Claims (3)

1, a kind of tower changing device on first watch of releasing flare, it is characterized in that, it has and can be installed on the installing flare tower frame (10) by load carrier (2) by rotating suspension bracket (6), also have slewing equipment (3) to be installed in the suspension bracket outside on the installing flare tower frame, the top of suspension bracket is equipped with fixed pulley (4) and directive wheel (5), steel wire rope (1) one end of installing on fixed pulley and the directive wheel has suspension hook, the other end to be installed on the hoist engine (20), fixedly suspension bracket (8) also is installed on installing flare tower frame, and fixedly the top of suspension bracket is equipped with manual chain hoist (7).
2, the tower changing device on first watch of releasing flare as claimed in claim 1, it is characterized in that, on described load carrier (2), there is roller (17) to be positioned at the outside of suspension bracket (6), there is roller sleeve (16) outside of roller, has bearing plate (19) to be fixed on the installing flare tower frame (10) below the roller sleeve.
3, the tower changing device on first watch of releasing flare as claimed in claim 1 or 2, it is characterized in that, on described slewing equipment (3), roller (12) is positioned at the outside of suspension bracket (6), there is roller sleeve (11) outside of roller (12), and the outside of roller sleeve has fixed head (14) to be fixed on the installing flare tower frame (10).
CN 03214413 2003-01-06 2003-01-06 Tower type evacuation torth head changing device CN2639723Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03214413 CN2639723Y (en) 2003-01-06 2003-01-06 Tower type evacuation torth head changing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03214413 CN2639723Y (en) 2003-01-06 2003-01-06 Tower type evacuation torth head changing device

Publications (1)

Publication Number Publication Date
CN2639723Y true CN2639723Y (en) 2004-09-08

Family

ID=34289965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03214413 CN2639723Y (en) 2003-01-06 2003-01-06 Tower type evacuation torth head changing device

Country Status (1)

Country Link
CN (1) CN2639723Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858163A (en) * 2010-07-15 2010-10-13 中国化学工程第四建设公司 Method for installing flare tower frame in bulk
CN102826460A (en) * 2012-09-10 2012-12-19 上海市机械施工有限公司 Lifting crane for disassembling and assembling flare head on top of flare tower and method for disassembling and assembling flare head by using lifting crane
CN102951562A (en) * 2011-08-31 2013-03-06 上海市机械施工有限公司 Self-lifting crane mounted at the top part of flare tower and used for disassembling flare head

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858163A (en) * 2010-07-15 2010-10-13 中国化学工程第四建设公司 Method for installing flare tower frame in bulk
CN102951562A (en) * 2011-08-31 2013-03-06 上海市机械施工有限公司 Self-lifting crane mounted at the top part of flare tower and used for disassembling flare head
CN102951562B (en) * 2011-08-31 2015-07-08 上海市机械施工集团有限公司 Self-lifting crane mounted at the top part of flare tower and used for disassembling flare head
CN102826460A (en) * 2012-09-10 2012-12-19 上海市机械施工有限公司 Lifting crane for disassembling and assembling flare head on top of flare tower and method for disassembling and assembling flare head by using lifting crane

Similar Documents

Publication Publication Date Title
CN201002936Y (en) Radial arrangement synchronization extension mechanism for crane
CN100400409C (en) Hydraulic automatic balanced crane installment
CN200988745Y (en) Hoisting device for mounting wind power generator
CN103321416B (en) Construction method for prestress of cable-stayed grid structure
CN101939538A (en) Development of a new tower cabling
CN102782311A (en) A method of craneless mounting or demounting of a wind turbine blade
CN101717038B (en) Multiplication-variable hook device
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN101539478B (en) Tester for testing multifunctional vane
CN202643182U (en) Steel wire rope compensating system of single-boom gantry crane
CN203668775U (en) Hydraulic sleeper replacing machine
CN201301179Y (en) Crawler crane self-dismounting device
CN203080721U (en) High-rise structure vibration damping control device with novel steel rope dampers
CN202358849U (en) Small-size suspension crane
CN201545635U (en) Holding rod with double flat arms
CN101985917B (en) Splitting installation and construction method of marine wind generating set and equipment thereof
CN201851002U (en) PLC (Programmable Logic Controller) controlled frequency conversion pile driver
CN202881852U (en) Suspension bridge cable installation system
CN201598821U (en) Steel wire suspending system of high altitude operating nacelle
CN206985563U (en) A kind of manhole cover hoisting device
CN203128062U (en) Roof crane
CN203064994U (en) Lifting device for disassembling negative ring segments
CN202625587U (en) Balance rotatable lifting appliance
CN202672832U (en) Rotatable seat double rocker arm and inner/outer stay wire suspension mixed derrick
CN201990998U (en) Novel heavy tamping machine

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
C19 Lapse of patent right due to non-payment of the annual fee