CN2571752Y - Wire-drawing device by melten production of horseshoe flame kiln - Google Patents

Wire-drawing device by melten production of horseshoe flame kiln Download PDF

Info

Publication number
CN2571752Y
CN2571752Y CN 02276377 CN02276377U CN2571752Y CN 2571752 Y CN2571752 Y CN 2571752Y CN 02276377 CN02276377 CN 02276377 CN 02276377 U CN02276377 U CN 02276377U CN 2571752 Y CN2571752 Y CN 2571752Y
Authority
CN
China
Prior art keywords
wire
main channel
furnace
glass metal
spray gun
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02276377
Other languages
Chinese (zh)
Inventor
刘钢
刘树明
何斌
林荣贵
倪海威
朱铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Kangda Building Material Industry Co ltd
Original Assignee
Sichuan Kangda Building Material Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Kangda Building Material Industry Co ltd filed Critical Sichuan Kangda Building Material Industry Co ltd
Priority to CN 02276377 priority Critical patent/CN2571752Y/en
Application granted granted Critical
Publication of CN2571752Y publication Critical patent/CN2571752Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a wire-drawing device by melten production of a horseshoe flame kiln, which comprises a glass metal furnace, a glass metal main channel which is provided with a gas nozzle and a spray gun set, subchannels, and wire-drawing mechanisms are respectively arranged on the lower part of each subchannel. The utility model is characterized in that the glass metal furnace is the horseshoe flame kiln furnace which is provided with a left heat-storing chamber, a right heat-storing chamber, a left small furnace, a right small furnace, burners which are arranged on the lower parts of the left small furnace and the right small furnace, a left fire-spraying opening, a right fire-spraying opening, a crown, a molten pool, a base, a side breast wall, a front face breast wall, a rear face breast wall and a liquid-flowing hole which is arranged below the rear face breast wall; the glass metal main channel and the outlet of the liquid-flowing hole are tightly and fixedly connected into integration in a sealing way. Because glass batches are directly melted to carry out wire drawing, the utility model has the advantages of small disposable investment, wide regulating range of production scale, less technological process, high production quality, small production cost, small general energy consumption and obvious scale benefit.

Description

Horseshoe flame furnace is founded wire-drawing frame
Technical field
The utility model relates to a kind of glass fibre production unit, particularly a kind ofly adopts the direct fusion cast glass admixtion of horseshoe flame furnace and its horseshoe flame furnace for the drawn glass fiber is founded wire-drawing frame.
Background technology
At present, adopting unit kiln direct method drawing process to produce glass fibre, is the more advanced production method that generally adopt the home and abroad, also claims pool kiln wiredrawing.The major equipment of this method comprises unit kiln, metallic recuperator, main channel, subchannel (shaping channel) and bushing group etc., have that operational path is short, energy consumption is low, the wire drawing quality is good, level of automation is high and produce advantages such as comprehensive cost is lower, but exist that one-time investment is big, product is single and be subjected to the influence of turn of the market big, defective such as adaptive faculty difference.Traditional ball method crucible drawing process though have the little advantage of one-time investment, exists energy consumption height, production cost height, feed temperature stability and wire drawing second-rate and be difficult to form defectives such as scale and benefit.On the basis of traditional ball method crucible drawing process, two arch glass spinning kilns (application number is 01206613.3) by the applicant's application, has the advantage that one-time investment is little, energy consumption is lower, the cycle is short, be easy to control, but still be difficult to form scale and benefit, and because this kind kiln and traditional crucible wire drawing all are to carry out wire drawing after glass sphere is founded into glass metal, exist secondary fusion, secondary pollution problem, thereby quality product had certain influence, and overall energy consumption is relative with production cost increases.
The utility model content
The purpose of this utility model is to provide a kind of horseshoe flame furnace to found wire-drawing frame, with overcome background technology or one-time investment big, be subjected to the market restraining factors big; Or overall energy consumption height, production cost height, quality stability is poor, scale and benefit are poor, exist secondary fusion, secondary pollution to influence the disadvantage of quality product, reach purposes such as one-time investment is little, the industrial scale regulation range is wide, good product quality, overall energy consumption is low, scale and benefit are remarkable.
Solution of the present utility model is that this kind horseshoe flame furnace founds wire-drawing frame and comprise glass metal smelting furnace, band gas jet and glass metal main channel, the subchannel of spray gun group and the wire-drawing mechanism of being located at each bottom, subchannel, it is characterized in that the glass metal smelting furnace be contain left and right sides regenerator, left and right sides port and be located at its underpart burner, left and right sides bocca, big arch, melting pool and base, pleurobranch wall, front and back face breastwork, be located at the horse shoe flame kiln of back face breastwork dog-hole down, glass metal main channel and dog-hole export to be fastened and connected and are integral.
The balancing reservoir of band gas jet and spray gun group also can be set between above-mentioned dog-hole and the main channel, and balancing reservoir is fastened and connected with dog-hole and main channel respectively and is integral.
Above-mentioned dog-hole is located at the terminal bottom position of melting pool.
The gas jet that is provided with on the side wall of above-mentioned main channel and each subchannel and the spacing of spray gun group are set to 200~500mm, and when gas jet and spray gun group unanimity, spacing near the main channel front end is made as 300~500mm, and the spacing of close rear end, main channel is made as 200~400mm.
The melting area of above-mentioned kiln melting pool is 12~80m 2, the pond is 500~1400mm deeply.
Advantage of the present utility model is to adopt the direct fusion cast glass admixtion of horseshoe flame furnace, and draw glass metal for the wire-drawing mechanism wire drawing by main channel, subchannel, its advanced and reasonable design compares with unit kiln that to have an one-time investment little, the advantage that the industrial scale regulation range is wide; Compare with the wire drawing of ball method crucible and two arch glass spinning kilns, reduced technical process, reduced production cost and overall energy consumption, avoided secondary fusion, secondary pollution problem, have the quality product height, advantage such as scale and benefit are remarkable.
Description of drawings
Accompanying drawing 1 is the utility model structural representation;
Accompanying drawing 2 is A-A sectional views of accompanying drawing 1.
Among the figure, 1, left accumulation of heat pond; 2, right accumulation of heat pond; 3, left port; 4, right port; 5, little burner; 6, left bocca; 7, right bocca; 8, charging opening; 9, melting pool; 10, balancing reservoir; 11, main channel; 12, subchannel; 13, platinum bushing; 14, preceding face breastwork; 15, big arch; 16, pleurobranch wall; 17, base; 18, back face breastwork; 19, dog-hole; 20, burner nozzle; 21, exhanst gas outlet; 22, baster; 23, gathering roll; 24, wire-drawing mechanism.
Embodiment
Below in conjunction with accompanying drawing the utility model embodiment is further described.
With 19 tons of conventional day molten glass liquid and can to found wire-drawing frame for the horseshoe flame furnace of 15 tons of day wire drawings be example: melting pool 9 area 30m 2, the dark 1000mm in pond; Left side regenerator 1 and right regenerator 2 are 40 with the accumulation of heat ratio of melting pool 9; The sectional area of left side port 3 and right port 4 is 0.98m 2, its underpart is provided with port burner 5 and corresponding natural gas spraying gun 6 covers; In face breastwork 18 bottoms, back floater guide block is set, thereby forms dog-hole 19 in melting pool 9 terminal bottoms, dog-hole 19 sectional areas are 0.24m 2Glass metal balancing reservoir 10 area 10m 2Main channel 11 long 8000mm, wide 500mm, the high 600mm of interior breastwork, the dark 250mm of glass liquid, subchannel 12 long 19800mm, wide 600mm, the high 600mm of interior breastwork, the dark 150mm of glass liquid, equidistant platinum bushing 13 and the corresponding wire-drawing mechanism 24 that 14 2000 holes are installed in 12 bottoms in the subchannel; On balancing reservoir 10, main channel 11 front ends, subchannel 12 pleurobranch walls, establish a gas jet 20 and a spray gun, in 11 rear ends, main channel, and establish a gas jet 20 and a spray gun every 250mm near on the subchannel 12 pleurobranch walls of 11 rear ends, main channel every 300mm near main channel 11 front ends; Exhanst gas outlet 21 is located at the afterbody of main channel 11.The utility model is produced 350 days meters per year can found about 7000 tons of glass metal, but about 5600 tons of drawn glass fibers.

Claims (6)

1, a kind of horseshoe flame furnace is founded wire-drawing frame, comprise glass metal smelting furnace, band gas jet and glass metal main channel, the subchannel of spray gun group and the wire-drawing mechanism of being located at each bottom, subchannel, it is characterized in that the glass metal smelting furnace be contain left and right sides regenerator, left and right sides port and be located at its underpart burner, left and right sides bocca, big arch, melting pool and base, pleurobranch wall, front and back face breastwork, be located at the horse shoe flame kiln of back face breastwork dog-hole down, glass metal main channel and dog-hole export to be fastened and connected and are integral.
2, horseshoe flame furnace according to claim 1 is founded wire-drawing frame, it is characterized in that also can being provided with between described dog-hole and the main channel balancing reservoir of band gas jet and spray gun group, and balancing reservoir is fastened and connected with dog-hole and main channel respectively and is integral.
3, horseshoe flame furnace according to claim 1 is founded wire-drawing frame, it is characterized in that described dog-hole is located at the terminal bottom position of melting pool.
4, horseshoe flame furnace according to claim 1 is founded wire-drawing frame, it is characterized in that the gas jet that is provided with on the side wall of described main channel and each subchannel and the spacing of spray gun group are set to 200~500mm.
5, found wire-drawing frame according to claim 1 or 4 described horseshoe flame furnaces, the spacing that it is characterized in that described gas jet and spray gun group is set to: when gas jet and spray gun group unanimity, spacing near the main channel front end is made as 300~500mm, and the spacing of close rear end, main channel is made as 200~400mm.
6, horseshoe flame furnace according to claim 1 is founded wire-drawing frame, and the melting area that it is characterized in that described melting pool is 12~80m 2, the pond is 500~1400mm deeply.
CN 02276377 2002-09-06 2002-09-06 Wire-drawing device by melten production of horseshoe flame kiln Expired - Fee Related CN2571752Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02276377 CN2571752Y (en) 2002-09-06 2002-09-06 Wire-drawing device by melten production of horseshoe flame kiln

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02276377 CN2571752Y (en) 2002-09-06 2002-09-06 Wire-drawing device by melten production of horseshoe flame kiln

Publications (1)

Publication Number Publication Date
CN2571752Y true CN2571752Y (en) 2003-09-10

Family

ID=33740241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02276377 Expired - Fee Related CN2571752Y (en) 2002-09-06 2002-09-06 Wire-drawing device by melten production of horseshoe flame kiln

Country Status (1)

Country Link
CN (1) CN2571752Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101870554A (en) * 2010-06-11 2010-10-27 自贡市鼎盛新材料有限公司 Preparation device for alkali-resistant glass balls and glass fibers

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101870554A (en) * 2010-06-11 2010-10-27 自贡市鼎盛新材料有限公司 Preparation device for alkali-resistant glass balls and glass fibers
CN101870554B (en) * 2010-06-11 2012-09-26 自贡市鼎盛新材料有限公司 Preparation device for alkali-resistant glass balls and glass fibers

Similar Documents

Publication Publication Date Title
CN209815941U (en) Glass fiber smelting furnace
CN1669962B (en) Glass forming method and its dedicated melting kiln
CN111484233B (en) Method and device for preparing high borosilicate glass by float process
CN201713555U (en) Combined type refining furnace for continuously producing mixed cropper regeneration casting anode plates
CN114409227A (en) Melting furnace for completely replacing glass with fossil fuel
CN111204955A (en) Method for producing optical glass
CN202226767U (en) Kiln with deep tank structural unit for glass fiber
CN201245542Y (en) Complete separation type glass melting furnace
CN208747914U (en) A kind of photovoltaic energy ultrawhite figured glass kiln
CN2571752Y (en) Wire-drawing device by melten production of horseshoe flame kiln
CN107445454A (en) Float glass structure
CN207347383U (en) Float glass structure
CN208454795U (en) A kind of water-cooled bubble systems for glass furnace
CN2775046Y (en) Glass fusing kiln capable of realizing two kinds of glass forming process
CN214991118U (en) Special multi-bushing plate tank furnace for producing pure basalt fibers
CN111644606A (en) Lead-acid storage battery grid continuous casting lead liquid supply system
CN2485306Y (en) Glass fiber furnace
CN201793467U (en) Tank furnace used for producing basalt continuous filaments
CN201183770Y (en) Glass melting furnace for pressure reducing clarification technology
CN2744678Y (en) High-silica glass ball device produced by smelting in double arched kiln
CN201121160Y (en) Glass pool furnace
CN111087164A (en) High-efficiency energy-saving environment-friendly heat exchange type external sintering glass melting furnace and production method
CN2429530Y (en) Drawing apparatus for using feed liquid of glass furnace directly
CN202945143U (en) Tank furnace for producing basalt continuous filament with annular output of 5000 tons
CN2182807Y (en) Electric furnace for melting optical glass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20030910