CN2566123Y - Vertical smokeless gasification energy-saving boiler - Google Patents

Vertical smokeless gasification energy-saving boiler Download PDF

Info

Publication number
CN2566123Y
CN2566123Y CN 02274717 CN02274717U CN2566123Y CN 2566123 Y CN2566123 Y CN 2566123Y CN 02274717 CN02274717 CN 02274717 CN 02274717 U CN02274717 U CN 02274717U CN 2566123 Y CN2566123 Y CN 2566123Y
Authority
CN
China
Prior art keywords
coal
fixedly connected
chambers
pipes
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02274717
Other languages
Chinese (zh)
Inventor
赵元龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jishujiandu Bureau Jiutai City Jilin Province
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02274717 priority Critical patent/CN2566123Y/en
Application granted granted Critical
Publication of CN2566123Y publication Critical patent/CN2566123Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to a vertical smokeless gasification energy-saving boiler, which belongs to a boiler. The furnace body 2 is divided into two parts which are fixedly connected, the lower part is rectangular, the upper part is cylindrical, the lower part of the furnace body is provided with two coal feeding ports 4 and two coal storage bin combustion chambers 5, 4 air supply pipes 6 are respectively positioned in the coal storage bin combustion chambers 5, the lower part of the coal storage bin combustion chambers 5 is provided with gasification pipes 7, the inner sides of the gasification pipes are provided with quick heating chambers 8, the quick heating chambers are internally and fixedly connected with quick heating pipes 9, the upper parts of the quick heating chambers and the inside of the cylindrical furnace body are provided with heating chambers 12, the heating chambers are internally and fixedly connected with fire distribution plates 10, and the upper parts of the fire distribution plates are fixedly connected with heating pipes 11. Has the advantages that: because the blast pipe is additionally arranged, the coal-fired boiler does not need blowing or blowing equipment and dust removing equipment, saves electric energy, can add coal once, is suitable for using face coal or loose coal, has good combustion and high coal-fired utilization rate, is beneficial to environmental protection and is suitable for being used by small and medium-sized users.

Description

Vertical no flue dust gasification energy saving boiler
Technical field the utility model belongs to a kind of boiler.
The present vertical gasification boiler of background technology draws badly because of the combustion chamber when burning diffusing coal or face coal, and it is bad to cause burning, and the quick heating pipe in fast hot cell is few, also causes making full use of heat energy, makes present vertical gasification boiler heat energy utilization rate low, it is bad to burn, and has wasted a large amount of fire coals.
Summary of the invention the utility model provides a kind of vertical no flue dust gasification energy saving boiler, with solve that the combustion chamber draws badly and fast hot cell in the few problem of quick heating pipe.The technical scheme that the utility model is taked is: comprise water jacket 1, body of heater 2 and exhaust opening 3, this body of heater 2 is fixedly connected two parts, the bottom is a cuboid, top is the cylinder bodily form, two coal feeding holes 4 and two coal store combustion chambers 5 are arranged in this body of heater bottom, 4 ajutages 6 lay respectively in the coal store combustion chamber 5, vapor lamp 7 is arranged at the bottom of coal store combustion chamber 5, the inboard of this vapor lamp is fast hot cell 8, fixedly connected quick heating pipe 9 in this speed hot cell, the top in fast hot cell and inner for being subjected to hot cell 12 at tubular body of heater, this indoor fixedly connected branch fire dish 10 that is heated, this divides fire dish top fixedly connected heat pipe 11.During use, add coal from coal feeding hole, blowing to the coal store combustion chamber and rotate the loose coal seam of ajutage from ajutage promotes gasification, after in fast hot cell, heating fast pipe, enter and be subjected in the hot cell, further absorb heat energy, discharge from exhaust opening from flue gas at last through minute fire dish and heat pipe.
Advantage of the present utility model is: novel structure makes it need not blowing or blast apparatus and cleaner, saves energy because of having set up ajutage; add a dant and get final product, be fit to use face coal or diffusing coal, and burn; the utilization rate of coal height helps environmental protection, is fit to medium and small user and uses.
Description of drawings
Fig. 1, the utility model structural representation;
The vertical view of Fig. 2, Fig. 1.
The specific embodiment
Comprise water jacket 1, body of heater 2 and exhaust opening 3, this body of heater 2 is fixedly connected two parts, the bottom is a cuboid, top is the cylinder bodily form, two coal feeding holes 4 and two coal store combustion chambers 5 are arranged in this body of heater bottom, 4 ajutages 6 lay respectively in the coal store combustion chamber 5, vapor lamp 7 is arranged at the bottom of coal store combustion chamber 5, the inboard of this vapor lamp is fast hot cell 8, fixedly connected quick heating pipe 9 in this speed hot cell, the top in fast hot cell and inner for being subjected to hot cell 12 at tubular body of heater, this indoor fixedly connected branch fire dish 10 that is heated, this divides fire dish top fixedly connected heat pipe 11.

Claims (1)

1, a kind of vertical no flue dust gasification energy saving boiler, comprise water jacket (1), body of heater (2) and exhaust opening (3), it is characterized in that: this body of heater (2) is fixedly connected two parts, the bottom is a cuboid, top is the cylinder bodily form, two coal feeding holes (4) and two coal store combustion chambers (5) are arranged in this body of heater bottom, 4 ajutages (6) lay respectively in the coal store combustion chamber (5), vapor lamp (7) is arranged at the bottom of coal store combustion chamber (5), the inboard of this vapor lamp is fast hot cell (8), fixedly connected quick heating pipe (9) in this speed hot cell, the top in speed hot cell and in tubular body of heater for being subjected to hot cell (12), this indoor fixedly connected branchs fire dish (10) that is heated, this divides the fiery fixedly connected heat pipe in top (11) that coils.
CN 02274717 2002-08-11 2002-08-11 Vertical smokeless gasification energy-saving boiler Expired - Fee Related CN2566123Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02274717 CN2566123Y (en) 2002-08-11 2002-08-11 Vertical smokeless gasification energy-saving boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02274717 CN2566123Y (en) 2002-08-11 2002-08-11 Vertical smokeless gasification energy-saving boiler

Publications (1)

Publication Number Publication Date
CN2566123Y true CN2566123Y (en) 2003-08-13

Family

ID=33738927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02274717 Expired - Fee Related CN2566123Y (en) 2002-08-11 2002-08-11 Vertical smokeless gasification energy-saving boiler

Country Status (1)

Country Link
CN (1) CN2566123Y (en)

Similar Documents

Publication Publication Date Title
CN207778401U (en) A kind of high-efficiency environment friendly residual heat insulation power economized boiler
CN206771740U (en) A kind of biomass thermal wind furnace
CN206459178U (en) A kind of biomass fuel boiler device
CN2566123Y (en) Vertical smokeless gasification energy-saving boiler
CN206037104U (en) Special clean -burning furnace of blue charcoal
CN201237353Y (en) Heating stove for shed
CN201074840Y (en) Horizontal water-fire pipe dual-fire-grate inverse-burning boiler
CN204534546U (en) Biomass boiler environmental protection and energy saving control system
CN2809432Y (en) Horizontal three-return smoke smokeless high-efficiency energy-saving boiler
CN201875684U (en) Environmentally friendly and highly efficient steam boiler
CN207555615U (en) A kind of refuse incinerator
CN202074684U (en) Water heating furnace
CN206958982U (en) A kind of biomass environment-friendly heating plant
CN206670040U (en) A kind of biomass hot water boiler
CN201034376Y (en) Biomass fuel burning boiler
CN201096402Y (en) Entirety reverse burning energy-saving environment-friendly boiler with water pipe
CN216282047U (en) Hot-blast stove
CN204153819U (en) A kind of Filter Tuber For Clean Coal shaped fuel heating stove
CN216716200U (en) Energy-saving and environment-friendly boiler with high energy-saving and emission-reducing combustion efficiency
CN214370547U (en) Semi-coke boiler of high-strength threaded smoke pipe
CN107816712A (en) Arsenic trioxide smelting exhaust gas waste heat boiler
CN106594805A (en) Energy-saving stove
CN203203014U (en) Biomass boiler for washing-dishes industry
CN215983265U (en) Four-return-stroke vertical water pipe double-combustion boiler
CN209541456U (en) A kind of environment-friendly type cellar furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JISHUJIANDU BUREAU, JIUTAI CITY, JILIN PROVINCE

Free format text: FORMER NAME OR ADDRESS: JILIN PROVINCE JIUTAI CITY EDUCATION COMMITTEE

CP03 Change of name, title or address

Patentee address after: Zhao Hongxia, Technical Supervision Bureau of Jilin, Jiutai Province

Patentee address before: Jiutai Education Commission of Jilin Province

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee