CN2546491Y - Arch bridge hanger rod assembly - Google Patents

Arch bridge hanger rod assembly Download PDF

Info

Publication number
CN2546491Y
CN2546491Y CN 02236404 CN02236404U CN2546491Y CN 2546491 Y CN2546491 Y CN 2546491Y CN 02236404 CN02236404 CN 02236404 CN 02236404 U CN02236404 U CN 02236404U CN 2546491 Y CN2546491 Y CN 2546491Y
Authority
CN
China
Prior art keywords
anchor head
anchor
rod assembly
nut
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02236404
Other languages
Chinese (zh)
Inventor
龙跃
穆成君
彭春阳
左毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Original Assignee
LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU BUILDING MACHINERY GENERAL FACTORY filed Critical LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Priority to CN 02236404 priority Critical patent/CN2546491Y/en
Application granted granted Critical
Publication of CN2546491Y publication Critical patent/CN2546491Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

Disclosed is an arch bridge suspender component, comprising a finished cable 5, an upper anchor head 6 which connects 5, and a lower anchor head 4. The utility model is characterized in that the suspender component also comprises a pulling rod component 1, a ball-shaped hinge 2 and a connecting sleeve 3; the lower end of the pulling rod component 1 is fixed at the lower surface of the beam; the upper end of the pulling rod component 1 is connected to an upper nut 21 of the ball-shaped hinge 2; an lower nut 22 of the ball-shaped hinge 2 is connected to the lower end of the connecting sleeve 3 by threads; the lower anchor head 4 is connected to the top end of the connecting sleeve 3; the pulling rod component consists of a pulling rod 12 and a nut 13; the upper anchor head 6 and lower anchor head 4 are separately cold-molded anchor or button head anchor, or both are cold-molded anchor or button head anchor. The suspender component has simple antisepsis and largely increased reliability; as the ball-shaped hinge is arranged in the suspender component, the utility model can effectively prevent the affiliated stress of the carling stretching of the bridge caused by temperature stress; the utility model can also prevent the affiliated stress and bending moment of the short suspender caused by temperature stress and construction error.

Description

The arch bridge suspender assembly
One, technical field:
The utility model relates to a kind of suspension rod assembly, particularly a kind of arch bridge suspender assembly.
Two, background technology:
At present various arch bridges, in concrete-filled steel tubes arch bridge, concrete arch-type bridge, steel case arch bridge, suspension rod all is to adopt chill casting anchor or bulb-end anchorage, forms the suspension rod system by anchor head 4 under anchor head or the bulb-end anchorage under anchor head 6, finished product rope 5 and the chill casting anchor on anchor head or the bulb-end anchorage on the chill casting anchor.The suspension rod upper end is passed arch ring and is anchored at plane on the arch ring 8 by last anchor head, the suspension rod lower end is passed crossbeam and is anchored at crossbeam 7 lower planes (referring to Fig. 2) by following anchor head, the load that crossbeam bears is passed to cable body by following anchor head, and cable body is passed to anchor head, and last anchor head is passed to arch ring again.There is following shortcoming in this kind suspension rod system: bridge floor is because the impact of vehicle or other load, and the change in length of the bridge floor longeron that causes owing to variations in temperature is destroyed plane and following anchor head junction on the crossbeam, cause poor sealing, be easy to infiltration and cause anchor head and cable body steel wire immersion corrosion steel wire down, have a strong impact on the use of suspension rod, gently then shorten suspension rod application life, heavy then cause that bridge caves in.
Three, summary of the invention:
Technical problem to be solved in the utility model is: solve arch bridge suspender lower end corrosion-resistant problem, eliminate because thermal stresses causes the bridge floor drift, thereby suspension rod is produced additional stress and because the additional bending moment that construction error produces suspension rod.
Its technical scheme of dealing with problems is: bottom, suspension rod crossbeam position increase by one by rod assembly, spherical hinge on the rigid structures that constitutes of lower nut, adapter sleeve, the rod assembly lower end is anchored in the crossbeam lower plane, the upper end is connected with adapter sleeve by spherical hinge, and anchor head links into an integrated entity under adapter sleeve and the suspension rod.
Its concrete structure is: a kind of arch bridge suspender assembly, comprise finished product rope and the last anchor head that is attached thereto, following anchor head, it is characterized in that: this suspension rod assembly also comprises the rigid structures that is made of rod assembly, spherical hinge, adapter sleeve, rod assembly upper end is connected with top nut in spherical the hinge, lower nut and adapter sleeve lower end be by being threaded in the spherical hinge, links to each other on following anchor head and the adapter sleeve.
Upper and lower anchor head can be respectively chill casting anchor or bulb-end anchorage, can all be chill casting anchor or bulb-end anchorage simultaneously also.
During use, upper end with suspension rod---be that finished product rustling sound body one end is anchored in plane on the arch ring by last anchor head, and the lower end of suspension rod---the other end that is finished product rustling sound body links to each other with adapter sleeve by following anchor head, the rod assembly upper end is connected with adapter sleeve by spherical hinge, and the rod assembly lower end is anchored in the crossbeam lower plane, thereby whole suspension rod assembly is linked into an integrated entity, and be anchored between the crossbeam of the arch ring of arch bridge and bridge.
Owing to adopt said structure, the utlity model has following advantage:
1, improve the antiseptic property of suspension rod effectively, and reliability improves greatly.Rod assembly is installed in the crossbeam, pours into behind the anticorrosion grease and only need make regular check on, and can guarantee safety.Anchor head under the ground tackle is risen to the crossbeam top, solved time anchor head waterproof problem.
2, spherical hinge is set in the suspension rod assembly, has reduced the bridge longeron elongation that causes owing to thermal stresses effectively and the subsidiary stress of suspension rod increase; Can also eliminate on the arch ring that causes owing to construction error pre-pipe laying effectively and misalign the additional bending moment that causes the suspension rod increase with the pre-pipe laying of crossbeam;
3, in arch bridge, short steeve uses this suspension rod assembly can prevent the generation of this situation effectively owing to subsidiary stress and moment of flexure that thermal stresses and construction error cause are even more serious.
Four, description of drawings:
Fig. 1: arch bridge suspender modular construction of the utility model and installment state schematic diagram;
Fig. 2: existing arch bridge suspender modular construction and installment state schematic diagram.
Five: the specific embodiment:
Embodiment:
A kind of arch bridge suspender assembly comprises finished product rope 5 and the last anchor head 6 that is attached thereto, following anchor head 4, and this suspension rod assembly also comprises the rigid structures that is made of rod assembly 1, spherical hinge 2, adapter sleeve 3, rod assembly 1 upper end and spherical top nut 2 of cutting with scissors in 2 1Connect lower nut 2 in the spherical hinge 2 2With adapter sleeve 3 lower ends by being threaded, anchor head 4 links to each other with adapter sleeve 3 upper ends under the bulb-end anchorage.
Described rod assembly 1 is by pull bar 1 2, nut 1 3Form, above-mentioned upper and lower anchor head can be respectively chill casting anchor or bulb-end anchorage, can all be chill casting anchor or bulb-end anchorage simultaneously also.Among Fig. 1,1 1Be pad.
During use, upper end with suspension rod---be that finished product rope 5 cable bodies upper end is anchored in plane on the arch ring by last anchor head 1, anchor head 4 links to each other by thread connecting mode with adapter sleeve 3 and the other end of finished product rope 5 cable bodies passes through down, rod assembly 1 upper end is connected with adapter sleeve 3 by spherical hinge 2, rod assembly 1 lower end is anchored in the crossbeam lower plane, thereby whole suspension rod assembly is linked into an integrated entity, and be anchored between the crossbeam of the arch ring of arch bridge and bridge.

Claims (1)

1, a kind of arch bridge suspender assembly, the last anchor head (6) that comprises finished product rope (5) and be attached thereto, following anchor head (4), it is characterized in that: this suspension rod assembly also comprises by rod assembly (1), spherical hinge (2), the rigid structures that adapter sleeve (3) constitutes, rod assembly (1) upper end is connected with spherical top nut (21) of cutting with scissors in (2), lower nut (22) and adapter sleeve (3) lower end are by being threaded in the spherical hinge (2), following anchor head (4) links to each other with adapter sleeve (3) upper end, described rod assembly (1) is by pull bar (12), nut (13) is formed, the described anchor head (6) of going up, following anchor head (4) can be respectively chill casting anchor or bulb-end anchorage, also can be chill casting anchor or bulb-end anchorage simultaneously.
CN 02236404 2002-05-23 2002-05-23 Arch bridge hanger rod assembly Expired - Fee Related CN2546491Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02236404 CN2546491Y (en) 2002-05-23 2002-05-23 Arch bridge hanger rod assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02236404 CN2546491Y (en) 2002-05-23 2002-05-23 Arch bridge hanger rod assembly

Publications (1)

Publication Number Publication Date
CN2546491Y true CN2546491Y (en) 2003-04-23

Family

ID=33710676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02236404 Expired - Fee Related CN2546491Y (en) 2002-05-23 2002-05-23 Arch bridge hanger rod assembly

Country Status (1)

Country Link
CN (1) CN2546491Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100425771C (en) * 2006-04-29 2008-10-15 四川省交通厅公路规划勘察设计研究院 Longitudinal limiting device for half-through and through type arch bridge short suspension arm
CN103046466A (en) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN109667218A (en) * 2019-01-11 2019-04-23 朱婧 Arch bridge suspender anti-loosening constructs system
CN112252154A (en) * 2020-11-05 2021-01-22 重庆交通大学 Novel anchor structure of short jib of half-through arch bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100425771C (en) * 2006-04-29 2008-10-15 四川省交通厅公路规划勘察设计研究院 Longitudinal limiting device for half-through and through type arch bridge short suspension arm
CN103046466A (en) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN103046466B (en) * 2012-12-29 2014-12-10 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN109667218A (en) * 2019-01-11 2019-04-23 朱婧 Arch bridge suspender anti-loosening constructs system
CN112252154A (en) * 2020-11-05 2021-01-22 重庆交通大学 Novel anchor structure of short jib of half-through arch bridge

Similar Documents

Publication Publication Date Title
CN101649604B (en) Construction bracket of 1# block of inclined pull bridge and constructing method thereof
CN107190627B (en) Partial ground anchor type suspension bridge and construction method thereof
CN112900231B (en) Elastic-plastic central buckle device of large-span suspension bridge
CN2546491Y (en) Arch bridge hanger rod assembly
CN101858053A (en) Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower
CN106400670A (en) Suspended-cable and cable-stayed secondary suspender combined type large-span bridge structure
CN111455827A (en) Bidirectional displacement connection structure of overhanging steel structure pedestrian bridge and concrete vehicle traveling bridge
CN203546625U (en) Replacing device of tied-arch bridge rigidity suspender
CN107034785A (en) Rope construction method is changed in a kind of interchangeable anchorage prestress anchoraging device and its installation
CN212294301U (en) Railway cable-stayed bridge with concrete main beam and steel main beam in mixed matching
CN109763417B (en) Cable-stayed steel truss cooperative system bridge
CN208250889U (en) A kind of arch bridge suspender structure
CN2758321Y (en) Continuous rigid structure flexible arch combining bridge
CN103174087B (en) A kind of suspension cable-oblique pull co-operative system comprising inclination hoist cable and variable cross-section main push-towing rope
CN202214682U (en) A cable-stayed bridge stay cable replacing device
CN109653077A (en) A kind of three main push-towing rope double tower column suspension bridges
CN2595863Y (en) Boom dragline device
CN204825614U (en) Concrete beam - wave form steel web beam combination continuous bridge
CN109056528B (en) Railway upper-bearing type steel truss girder suspension bridge
CN1210465C (en) Girder type bridge
CN2464823Y (en) Composite truss for point joined glass curtain
CN109024267B (en) Steel truss girder structure of curved bridge floor
CN108951434B (en) Control device and control method for curved light I-shaped steel beam bridge dragging construction cantilever end
CN2700387Y (en) Section steel-concrete composite beam
CN204753343U (en) Single tower cable -stay bridge of bridge floor is arranged to non - symmetry plane broken line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20030423

Termination date: 20100523