CN2537730Y - Synthetic rubber racetrack structure with permeability - Google Patents

Synthetic rubber racetrack structure with permeability Download PDF

Info

Publication number
CN2537730Y
CN2537730Y CN 02227449 CN02227449U CN2537730Y CN 2537730 Y CN2537730 Y CN 2537730Y CN 02227449 CN02227449 CN 02227449 CN 02227449 U CN02227449 U CN 02227449U CN 2537730 Y CN2537730 Y CN 2537730Y
Authority
CN
China
Prior art keywords
runway
bonding agent
synthetic rubber
per square
kilograms per
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02227449
Other languages
Chinese (zh)
Inventor
谢昌德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02227449 priority Critical patent/CN2537730Y/en
Application granted granted Critical
Publication of CN2537730Y publication Critical patent/CN2537730Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a synthetic rubber runway structure with permeability. A runway surface layer (10) is paved on the plain foundation ground formed by the civil engineering, the runway surface layer (10) comprises a surface layer main body (11) which is made of permeable gravel, fiber, cracked rubber and bonding agent in a mixed way, a surface anti-sliding layer (12) formed by the rubber grains mixed with bonding agent paved on the surface layer main body (11), and a water permeable layer (13) formed by the gravel mixed with bonding agent below the surface layer main body (11). Compared with the prior technology, the utility model has the advantages of high elasticity, no distortion and no water accumulation.

Description

The infiltrative synthetic rubber runway of tool structure
Technical field the utility model relates to the paving that is exclusively used in stadium or playing field, particularly relates to the runway paving of field fabrication.
Artificial course's pavement structure of background technology prior art as shown in Figure 4, be followed successively by on-slip polyurethane (PU) particle 91, PU first coating layer 93, PU second coating layer 92, pitch surface layer 94, pitch articulamentum 95, end oil 96, gravel grating 97, rough sand 98 and mackintosh 99 etc. from top to bottom, this runway structure is not only laid very trouble layer by layer in construction, and every laying one deck, then must detect once, thus time-consuming, take a lot of work and the cost height.
In addition, because PU material possess hydrophilic property not, so the easy ponding of runway when rainy, again because airtight, do not seep water, thereby easily the aqueous vapor of humidity is lodged between each layer of runway, cause material not good or the bad place that constructs (can't avoid) cause the PU pull-up to fall, so cost of maintenance are very high.And the particle on PU top layer is the spreading construction, and adhesion area is little, and the PU particle easily comes off because of rubbing.
The summary of the invention the purpose of this utility model be to avoid above-mentioned the deficiencies in the prior art part and a kind of gas permeability is proposed, seepage of water is good, the PU particle of surperficial on-slip layer is not allowed the infiltrative synthetic rubber runway of caducous tool structure.
The purpose of this utility model can be by realizing by the following technical solutions:
Design, the infiltrative synthetic rubber runway of a kind of tool of use structure; the runway cover of establishing on the formed smooth ground of civil engineering upper berth; described runway cover comprises the pervious layer that is formed by gravel mixing bonding agent below the surface layer body that is mixed and made into by permeable gravel, fiber, crumb and bonding agent and surperficial on-slip layer of laying that is formed by rubber grain mixing bonding agent and the surface layer body on this surface layer body.
Compared with prior art, the utlity model has following advantage:
1. adopt surface layer body that is mixed and made into by permeable gravel, fiber, crumb and bonding agent and the air-permeable layer of making by gravel mixing bonding agent, compare with the runway of repeatedly laying layer of the prior art, not only save job step, working time and detection number of times, and have high resiliency, indeformable and advantage such as ponding not in the use;
2. the particle bonding way of surperficial on-slip layer of the present utility model is laid for stirring synthetic, and the whole grain of particle is long-pending all to contact bonding agent, thereby is not easy to come off;
3. the utility model runway cover thickness is the twice of existing runway thickness, thus the abrasion resistance height, and when allotment material mixed proportion, the adjustable surface layer of different elasticity and hardness of allotting is to be used in different athletic grounds;
4. elastomeric material can reclaim tire twice laid in addition by automobile, helps environmental protection, and can reduce the runway manufacturing cost.
Description of drawings
Fig. 1 is the sectional schematic diagram of the utility model runway structure;
Fig. 2 is the schematic perspective view of described utility model water-permeable pipe;
Fig. 3 is the A-A sectional drawing of Fig. 2;
Fig. 4 is the sectional schematic diagram of runway in the prior art.
The specific embodiment is described in further detail below in conjunction with the most preferred embodiment shown in the accompanying drawing.
The infiltrative synthetic rubber runway of a kind of tool structure; it is the runway cover of establishing on the formed smooth ground of civil engineering upper berth 10; as shown in Figure 1; described runway cover 10 comprise the surface layer body 11 that is mixed and made into by permeable gravel, fiber, crumb and bonding agent and the surperficial on-slip layer 12 that forms by rubber grain mixing bonding agent on this surface layer body 11, laid and surface layer body 11 below the pervious layer 13 that forms by gravel mixing bonding agent.Described surface layer body 11 thick 22~25 centimetres, the mixed proportion of its material is: gravel is 19~20 Kilograms Per Square Meters; Crumb is 9~10 Kilograms Per Square Meters; Fiber is 1.2~1.5 Kilograms Per Square Meters; The polyurethane bonding agent is 1.2~1.5 Kilograms Per Square Meters.Described surperficial on-slip layer 12 thick 3~5 centimetres, its material mixed proportion is: the rubber grain is 1.0~1.2 Kilograms Per Square Meters, the polyurethane bonding agent is 1.2~1.5 Kilograms Per Square Meters.Described pervious layer 13 thick 50~60 centimetres, its material mixed proportion is: gravel is 60~70 Kilograms Per Square Meters, polyurethane bonding agent 2.4~3.0 Kilograms Per Square Meters.Describedly handle formed runway by pervious layer 13, surface layer body 11 and surperficial on-slip thereof, in security test, no matter under any weather, all have good elasticity, abrasion resistance, anti-nail, anti-caltrop, stretching and combustibility, and non-ageing characteristic is all arranged in fine, rainy day.
As shown in Figure 1, in the sandy gravel stratum of described ground, be embedded with toughness water-permeable pipe 20, in order to collecting a large amount of rainwater that penetrate by runway cover, and guide it to flow into gutter system, rainwater is unlikely accumulates in ground, keep the water permeability of rubber track.
Described water-permeable pipe 20 is by molded the forming of rubber grain mixing polyurethane bonding agent, and the rainwater that penetrates runway cover can directly infiltrate in the water-permeable pipe 20.As Fig. 2, shown in Figure 3, described water-permeable pipe 20 is the square-outside and round-inside long tube, in order to increase water-permeable pipe intensity and with the contact area in the external world, increase the ponding ability.For several water-permeable pipes 20 are linked to each other, water-permeable pipe 20 two ends have concavo- convex joint 21,22 respectively.The latter half inner edge of described water-permeable pipe 20 is provided with waterproofing course 23, is used for collecting the rainwater that its first half penetrates.
Make the used rubber grain of described water-permeable pipe 20, processed by the waste vapour vehicle tyre that reclaims, twice laid helps to reduce cost, and helps environmental protection.Described toughness water-permeable pipe is not limited to use in this synthetic rubber runway ground, also applicable in other artificial courses and the court ground.

Claims (8)

1. the infiltrative synthetic rubber runway of tool structure; establish runway cover (10) on the formed smooth ground of civil engineering upper berth; it is characterized in that: described runway cover (10) comprises the surface layer body (11) that is mixed and made into by permeable gravel, fiber, crumb and bonding agent; the surperficial on-slip layer of go up laying at this surface layer body (11) (12) that forms by rubber grain mixings bonding agent, and the following pervious layer (13) that forms by gravel mixing bonding agent of surface layer body (11).
2. the infiltrative synthetic rubber runway of tool as claimed in claim 1 structure is characterized in that: thick 22-25 centimetre of described surface layer body (11), the mixed proportion of its material be,
Gravel: 19~20 Kilograms Per Square Meters;
Crumb: 9~10 Kilograms Per Square Meters;
Fiber: 1.2~1.5 Kilograms Per Square Meters;
Polyurethane bonding agent: 1.2~1.5 Kilograms Per Square Meters.
3. the infiltrative synthetic rubber runway of tool as claimed in claim 1 structure, it is characterized in that: thick 3~5 centimetres of described surperficial on-slip layer (12), its material mixed proportion is: the rubber grain is 1.0~1.2 Kilograms Per Square Meters, and the polyurethane bonding agent is 1.2~1.5 Kilograms Per Square Meters.
4. the infiltrative synthetic rubber runway of tool as claimed in claim 1 structure, it is characterized in that: thick 50~60 centimetres of described pervious layer (13), its material mixed proportion is: gravel is 60~70 Kilograms Per Square Meters, and the polyurethane bonding agent is 2.4~3.0 Kilograms Per Square Meters.
5. the infiltrative synthetic rubber runway of tool as claimed in claim 1 structure is characterized in that: in the sandy gravel stratum (30) of described ground, be embedded with toughness water-permeable pipe (20).
6. the infiltrative synthetic rubber runway of tool as claimed in claim 5 structure is characterized in that: described water-permeable pipe (20) is by molded the forming of rubber grain mixing polyurethane bonding agent.
7. the infiltrative synthetic rubber runway of tool as claimed in claim 5 structure, it is characterized in that: described water-permeable pipe (20) is the square-outside and round-inside long tube, and two ends have concavo-convex joint (21), (22) respectively.
8. as claim 5, the infiltrative synthetic rubber runway of 6 or 7 described tools structure, it is characterized in that: the latter half inner edge of described water-permeable pipe (20) is provided with waterproofing course (23).
CN 02227449 2002-05-08 2002-05-08 Synthetic rubber racetrack structure with permeability Expired - Fee Related CN2537730Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02227449 CN2537730Y (en) 2002-05-08 2002-05-08 Synthetic rubber racetrack structure with permeability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02227449 CN2537730Y (en) 2002-05-08 2002-05-08 Synthetic rubber racetrack structure with permeability

Publications (1)

Publication Number Publication Date
CN2537730Y true CN2537730Y (en) 2003-02-26

Family

ID=33704222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02227449 Expired - Fee Related CN2537730Y (en) 2002-05-08 2002-05-08 Synthetic rubber racetrack structure with permeability

Country Status (1)

Country Link
CN (1) CN2537730Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400430A (en) * 2010-09-07 2012-04-04 方贵富 Construction method and structure of environmentally friendly, permeable and evacuating artificial playground of green building
CN102619153A (en) * 2011-01-28 2012-08-01 方贵富 Construction method of green building, environmental protection, permeable and venting artificial playground and structure of artificial playground
CN101918095B (en) * 2007-10-23 2013-07-10 骑手表面公司 Equestrian surfacing materials

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101918095B (en) * 2007-10-23 2013-07-10 骑手表面公司 Equestrian surfacing materials
CN102400430A (en) * 2010-09-07 2012-04-04 方贵富 Construction method and structure of environmentally friendly, permeable and evacuating artificial playground of green building
CN102619153A (en) * 2011-01-28 2012-08-01 方贵富 Construction method of green building, environmental protection, permeable and venting artificial playground and structure of artificial playground

Similar Documents

Publication Publication Date Title
US7168884B2 (en) Reinforced permeable paving structure
US20070148398A1 (en) Synthetic-grass flooring and method for laying same
CN207227890U (en) A kind of environment protection asphalt pavement structure
CN103669145A (en) Pavement method of permeable pavement structure
CN106555372A (en) A kind of porous pavement is mated formation plate and porous pavement paving structure
CN101718069A (en) Permeable pavement structure
CN207362616U (en) A kind of paving structure of water-permeable brick
CN106677011A (en) Sidewalk and greenbelt water collecting and storing system
CN203049757U (en) Rainwater draining and collecting system for residential quarter
CN113430887A (en) Municipal road sponge drainage noise reduction comprehensive treatment construction process
CN2635719Y (en) Artificial lawn sports field structure with permeability and elasticity
CN103669167A (en) Permeable pavement structure
CN2537730Y (en) Synthetic rubber racetrack structure with permeability
CN111074720A (en) Water-permeable anti-cracking road structure and construction method thereof
CN114045714A (en) Construction process suitable for improving weathered soft rock roadbed filler as roadbed reinforcing layer
CN208362832U (en) A kind of spongeization road structure of cracking resistance
CN209211198U (en) A kind of urban environmental protection road surface
CN2635720Y (en) Synthetic rubber sports field lane structure with permeability
CN210797145U (en) Noise-reduction drainage polymer modified porous concrete pavement structure
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN206521660U (en) A kind of porous pavement is mated formation plate and porous pavement paving structure
CN105803888A (en) Sponge type road paving structure
CN206279413U (en) A kind of ecological permeable catchments overall road surface
CN108867243A (en) A kind of area of heavy rainfull peripheral path ponding collects exhaust system and construction method
CN210194383U (en) Road surface structure of colored runway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee