CN2522851Y - Two-water-tube type settlement meter - Google Patents

Two-water-tube type settlement meter Download PDF

Info

Publication number
CN2522851Y
CN2522851Y CN 01263182 CN01263182U CN2522851Y CN 2522851 Y CN2522851 Y CN 2522851Y CN 01263182 CN01263182 CN 01263182 CN 01263182 U CN01263182 U CN 01263182U CN 2522851 Y CN2522851 Y CN 2522851Y
Authority
CN
China
Prior art keywords
pipe
water
drainage
pipeline
drainpipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01263182
Other languages
Chinese (zh)
Inventor
李泽崇
唐彤芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Original Assignee
Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications filed Critical Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Priority to CN 01263182 priority Critical patent/CN2522851Y/en
Application granted granted Critical
Publication of CN2522851Y publication Critical patent/CN2522851Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

A double water pipe type settlement meter consists of a settlement detector, a pipeline, a measurement device, a water supply system and a drainage system; wherein, the settlement detector consists of an overflow pipe, an aeration pipe and a drainage pipe interface arranged in a sealing cylinder. One end of an inlet pipe, an aeration pipe and a drainage pipe arranged in the pipeline are respectively connected with the overflow pipe, the aeration pipe and the drainage pipe interface of the settlement detector, while the other end is communicated with an observation room. The inlet pipe is connected with a measurement pipe of the measurement device and the water supply system. Nozzles of the aeration pipes are kept downwards over floor. The utility model is characterized in that nozzles of the drainage pipes can be elevated and descended and are lower than the water level of the measurement pipe but higher than the bottom part of the sealing cylinder, the inlet pipes and the drainage pipes have the same pipe diameter. The application solves the problem of poor drainage of drainage pipes and promotes the reliability of measured value. The burying mechanism of the applied settlement meter requires no gradient, thus excavation amount and burying time can be reduced, backfill compaction quality can be promoted and project investment can be saved.

Description

Two water-pipe type settlement instruments
Technical field
The utility model relates to a kind of hydraulic engineering instrument, particularly a kind of pair of water-pipe type settlement instrument.
Technical background
Water-pipe type settlement instrument (also claiming Sweden's box abroad) is mechanical type prototype measurement instrument, utilizes connecting pipe principle to measure the inner sedimentation of dam body.Instrument is made up of sedimentation gauge head, pipeline, measurement mechanism and water supply, unwatering system.The sedimentation gauge head is that two vertical tubes and a drain interface are set in a sealed cylindrical, and two vertical tubes are called overflow pipe and snorkel.Pipeline is the plastic tube of three different-diameters; be through in the protective casing; be called water inlet pipe, snorkel and drainpipe; the one end is connected with overflow pipe, snorkel and the drain interface of sedimentation gauge head respectively; the other end feeds the observation room; water inlet pipe is connected with water system with the measurement water pipe of measurement mechanism by the special three-way valve; the snorkel mouth of pipe places above place, ground downwards; its effect is to keep the atmospheric pressure in the gauge head to balance each other with observing the atmospheric pressure in the room; the drainpipe mouth of pipe then places ground or locates near ground, in order to drain the water that overflow pipe overflows.Measurement mechanism constitutes by being installed on water column, T-valve and the water system measured on the plate.During measurement, to the water inlet pipe water-filling, to the overflow of the spilling water mouth of pipe, after stopping water-filling and treating the spilling water mouth of pipe and measurement mechanism water column two ends water surface balance, read water column water surface elevation reading, the difference of two measurement period measured values is sedimentation gauge head and the relative settlement amount of observing the room in two periods, adds the settling amount in observation room itself, is the absolute settlement amount.Water-pipe type settlement instrument is because of sound construction, and measured value is reliable, precision height, and do not have the such zero point drift of Electrical Measuring Instrument, thereby widespread usage in the prototype measurement of earth and rockfill dam, particularly rock at home and abroad.Because the sedimentation in measuring point and observation room, evaporation of water in probe location variation and the water column needs to the water inlet pipe water-filling when this measures at every turn, and the water that overflow pipe overflows is discharged from drainpipe.For water can be discharged in the gauge head of sealing, the caliber of generally going up drainpipe is bigger than water inlet pipe, installs to bury underground also to require pipeline that 1% gradient will be arranged.When pipeline was installed, to observing the room, whole pipeline bedding was pressed 1% gradient leveling basically from measuring point.But, after the pipeline backfill, along with dam embankment, pipeline is sedimentation thereupon, because the inner sedimentation skewness of dam body, or else pipeline has 1% gradient, and counter-slope may occur at a certain section, and pipeline water-filling and spilling water are discontinuity, therefore the water in the drainpipe is discontinuous, contains a large amount of bubbles, particularly high dam, length of pipeline hundreds of rice, water is not easy discharge, and (experimental study of 400m length of pipeline shows, because counter-slope causes the water that overflows in the gauge head cumulative, is difficult to for the moment discharge, when ponding 15-20cm, needed to discharge in 1-2 days).When measuring the frequency more (as the reservoir filling initial stage), or sedimentation development comparatively fast big (gradient reduces), or filling time when long, because the water that overflows is difficult for discharging, in the course of time, water may be full of the gauge head inner chamber, influences measuring value accuracy.If water enters in the snorkel, not only influence measured value stability, gauge head was lost efficacy.On the other hand, 1% bury gradient underground, concerning the following height of dam of 100m level, problem also is not very big, but concerning high dam, influence is just very big.As water cloth a strip of land between hills rock, the longest 520m of pipeline, by 1% gradient, the pipeline upstream and downstream discrepancy in elevation reaches 5.2m.In this way, excavation and backfilling working amount are very big, and the observation room will be built very highly.This just makes the time of burying underground and executive cost increase greatly, and pipeline backfill quality assurance difficulty increases.Therefore, solve the drainage problem of water-pipe type settlement instrument, bury success underground and improve the measuring accuracy, press for and have a realistic meaning guaranteeing water-pipe type settlement instrument.
Summary of the invention
Reason at the water-pipe type settlement instrument impeded drainage, be to have bubble in the drainpipe, make the discontinuous situation of water body in the drainpipe, the application with one of technical matters of solving is: make that water in the drainpipe is also the same with water in the water inlet pipe not to be had bubble and be full of in the pipe, then no matter pipeline has or not counter-slope, even the pipeline bending, as long as head difference is arranged, water in the pipeline in the same old way can continuous flow, discharges smoothly, improves the reliability of measured value.The application also can solve another technical matters simultaneously, promptly eliminate when burying pipeline underground 1% bury the gradient requirement underground, this not only can reduce buries difficulty underground, and can reduce the earth volume of burying engineering underground significantly, thereby reduce expense significantly, and save the duration.
The scheme that solves the problems of the technologies described above, as long as the structure with sedimentation gauge head drainpipe and two pipelines of water inlet pipe makes two communicating pipes that the overflow direction is opposite into, just can solve the problem of smooth draining, the imagination of Here it is two water-pipe type settlement instruments also is the key problem in technology of two waterpipe types.Two water-pipe type settlement instruments, by the sedimentation gauge head, pipeline, measurement mechanism and water supply, unwatering system is formed, the sedimentation gauge head is that two vertical tubes and a drain interface are set in a sealed cylindrical, two vertical tubes are called overflow pipe and snorkel, water inlet pipe in the pipeline, snorkel and drainpipe, the one end respectively with the overflow pipe of sedimentation gauge head, snorkel is connected with drain interface, the other end feeds the observation room, water inlet pipe is connected with water system with the measurement water pipe of measurement mechanism, the snorkel mouth of pipe places above place, ground downwards, it is characterized in that: the mouth of pipe place of drainpipe is provided with jacking gear and (for example the mouth of pipe is fixed on the crane or at the mouth of pipe hanged hook is set, hanger bracket is set in addition), make the mouth of pipe be lower than the water column water level, be higher than the bottom of sedimentation gauge head sealed cylindrical.This structure makes the bottom of sedimentation gauge head sealed cylindrical form a pools zone, and the distance between the base plane of sealed cylindrical and the draining orifice plane is discharge level.That is to say: the distance between draining orifice plane and the water gaging orifice plane equals the distance between the spilling water mouth of pipe and the draining position.This structure makes two communicating pipes that the overflow direction is opposite that become of two pipelines of sedimentation gauge head drainpipe and water inlet pipe, make that water in the drainpipe is also the same with water in the water inlet pipe not to be had bubble and be full of in the pipe, then no matter pipeline has or not counter-slope, even pipeline bending, as long as head difference is arranged, water in the pipeline in the same old way can continuous flow, discharge smoothly.Because drainpipe becomes communicating pipe, its caliber requires and can reduce, so the application's prioritization scheme is: the caliber of drainpipe is identical with the water inlet pipe caliber.
The application has solved in the prior art because the inner sedimentation skewness of dam body, cause and occur counter-slope in the pipeline, make and occur the difficult problem that bubble causes impeded drainage in the drainpipe, make that water in the drainpipe is also the same with water in the water inlet pipe not to be had bubble and be full of in the pipe, then no matter pipeline has or not counter-slope, even the pipeline bending, as long as head difference is arranged, water in the pipeline in the same old way can continuous flow, discharges smoothly, has improved the reliability of measured value.The application has solved the difficult problem when traditional water tubular type sedimentometer is buried underground simultaneously, and the sedimentometer of new construction is buried ditch underground does not need the pipeline gradient, saves and opens amount of excavation and bury the time underground, improves the backfill compacting quality, saves construction investment.With water cloth a strip of land between hills is example, if bury underground with traditional water tubular type sedimentometer, in pipeline length 520m, bury ditch bottom width 2.5m underground, buries the gradient estimation underground by 1%, and it is opened amount of excavation and returns amount of fill respectively is 19208m 3Adopt two water-pipe type settlement instruments, no gradient is buried underground, and it is opened amount of excavation and return amount of fill and respectively is 2308m 3, only be the former 12%.Both compare, and can save out amount of excavation and return amount of fill respectively is 16900m 3This shows that its technical economic benefit and social benefit are fairly obvious, two water-pipe type settlement instruments have wide application future.Eliminated when burying pipeline underground 1% bury the gradient requirement underground, this not only can reduce buries difficulty underground, and can reduce the earth volume of burying engineering underground significantly, thereby reduce expense significantly, and saved the duration, dam is generated electricity in advance, obtained economic benefit is very huge especially.
Description of drawings
Fig. 1 is the two water-pipe type settlement instrument structural representations of the application.
Embodiment
Embodiment 1, with reference to Fig. 1: two water-pipe type settlement instruments, to form by sedimentation gauge head, connecting pipeline, measurement mechanism and water supply, unwatering system, the sedimentometer gauge head is made up of overflow pipe 1, drain connection 2, snorkel 3 and sealed cylindrical housing 4.Communicating pipe and drainpipe all adopt φ 12 * φ 10 nylon tubes, and snorkel adopts φ 14 * φ 12 nylon tubes.Theoretically, snorkel is as long as communicate with air, and caliber can be littler, but for preventing that water droplet or foreign material from stopping up, caliber should be got greatly.Overflow pipe was connected with the water column 5 of observing the room measurement mechanism by communicating pipe, drainpipe is connected with observation room internal drainage mouth 6, freeing port is fixed on the crane, and the mouth of pipe is lower than water column water level 25cm (its discrepancy in elevation is decided according to the vertical tube mouth of pipe and discharge level in the gauge head).Snorkel is fixed in the observation room specially on support or the wall, the mouth of pipe down, in case foreign material fall into.Its principle of work is a doubly-linked siphunculus principle.During measurement to the vertical tube water-filling, until the overflow of vertical tube pipe.The water that overflows raises gauge head tube internal drainage water level 7, because the tube internal drainage water level and the freeing port discrepancy in elevation are certain, the water that overflows promptly flows out from freeing port.This shows, if communicating pipe in be full of water, manage not flat, even pipeline has counter-slope, communicating pipe the water level at two ends can reach equilibrium state.To measuring the pipeline water-filling, the filling time, pipeline length was relevant, is provided by producer by water supply installation pressure head and measurement.Observe whether spilling water of freeing port, if anhydrous overflowing, then gauge head internal drainage water level may be lower than in freeing port or the pipeline bubble, at this moment can be by drainpipe water-filling in gauge head, stop water-filling after, if the freeing port spilling water, illustrate that discharge pipe line is unimpeded, enters next step operation.If freeing port is still anhydrous overflows, can improve the water-filling head and continue water-filling, until the freeing port spilling water, but filled water amount can not surpass 2300cm 3After stopping water-filling, treat stable level (generally needing 3~5 minutes), can read buret water level reading.Regulate the freeing port height then, freeing port and buret water level are differed-25cm.Two water-pipe type settlement instrument principles are simple, and method is feasible, and is rational in infrastructure, simple to operate.

Claims (3)

1, a kind of pair of water-pipe type settlement instrument, by the sedimentation gauge head, pipeline, measurement mechanism and water supply, unwatering system is formed, the sedimentation gauge head is that overflow pipe is set in sealed cylindrical, snorkel and drain interface, water inlet pipe in the pipeline, snorkel and drainpipe, the one end respectively with the overflow pipe of sedimentation gauge head, snorkel is connected with drain interface, the other end feeds the observation room, water inlet pipe is connected with water system with the measurement water pipe of measurement mechanism, the snorkel mouth of pipe places above place, ground downwards, it is characterized in that: the mouth of pipe place of drainpipe is provided with jacking gear, the mouth of pipe is lower than the water column water level, is higher than the bottom of sedimentation gauge head sealed cylindrical.
2, according to described pair of water-pipe type settlement instrument of claim 1, it is characterized in that: drainpipe mouth of pipe place jacking gear is: the mouth of pipe of drainpipe is fixed on the crane.
3, according to claim 1 or 2 described pairs of water-pipe type settlement instruments, it is characterized in that: the caliber of drainpipe is identical with the water inlet pipe caliber.
CN 01263182 2001-10-12 2001-10-12 Two-water-tube type settlement meter Expired - Fee Related CN2522851Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01263182 CN2522851Y (en) 2001-10-12 2001-10-12 Two-water-tube type settlement meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01263182 CN2522851Y (en) 2001-10-12 2001-10-12 Two-water-tube type settlement meter

Publications (1)

Publication Number Publication Date
CN2522851Y true CN2522851Y (en) 2002-11-27

Family

ID=33670812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01263182 Expired - Fee Related CN2522851Y (en) 2001-10-12 2001-10-12 Two-water-tube type settlement meter

Country Status (1)

Country Link
CN (1) CN2522851Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100346141C (en) * 2005-04-25 2007-10-31 湖南大学 Earthwork filling body settlement observation instrument
CN101435208B (en) * 2008-10-16 2010-06-09 西安理工大学 Device and method for monitoring uneven settlement of earth slit formation tunnel
CN101614535B (en) * 2009-07-20 2010-12-29 山东大学 Push-down settlement united test method and test device of foundation and road bed
CN111336988A (en) * 2020-04-02 2020-06-26 南京南瑞水利水电科技有限公司 Double-drainage loop water pipe type settlement meter

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100346141C (en) * 2005-04-25 2007-10-31 湖南大学 Earthwork filling body settlement observation instrument
CN101435208B (en) * 2008-10-16 2010-06-09 西安理工大学 Device and method for monitoring uneven settlement of earth slit formation tunnel
CN101614535B (en) * 2009-07-20 2010-12-29 山东大学 Push-down settlement united test method and test device of foundation and road bed
CN111336988A (en) * 2020-04-02 2020-06-26 南京南瑞水利水电科技有限公司 Double-drainage loop water pipe type settlement meter
CN111336988B (en) * 2020-04-02 2022-08-02 南京南瑞水利水电科技有限公司 Double-drainage loop water pipe type settlement meter

Similar Documents

Publication Publication Date Title
CN108222082B (en) Dynamic precipitation indoor model test method and device for foundation pit under condition of multiple aquifers
CN105887886B (en) A kind of strong karsts developing area stratum Curtain Grouting Construction method
CN102590063A (en) Test device and test method for penetration clogging of soil
CN106706416A (en) Test device capable of simulating basement bottom plate stress under effect of pressure water and use method thereof
CN105203080B (en) Roadbed settlement observation device and observation method thereof
CN106192868A (en) A kind of dykes and dams high water level soaks stability test groove
CN207760898U (en) Foundation pit dynamic precipitation indoor model test device under the conditions of multi-aquifer
CN206470116U (en) A kind of experimental rig for simulating the lower basement bottom board stress of artesian water effect
CN113030277B (en) System and method for testing permeability damage and grouting injectability of surrounding rock of water-rich sand layer tunnel
CN105927248A (en) Pressure stabilizing and gas exhausting device used for grouting site and mounting and using method thereof
CN105806712A (en) Test device and test system for water pressure in hole
CN202486025U (en) Seepage siltation test device for earth
US4003263A (en) Tube profile gage
CN2522851Y (en) Two-water-tube type settlement meter
CN113513054B (en) Pile foundation grouting pressure testing device and method based on optical fiber sensing
CN114108710A (en) Real-time monitoring system and method for key parameter of grouting after large-diameter cast-in-place pile combination
CN210975944U (en) Water supplementing device of water pipe type settlement gauge
CN113720994A (en) Device and method for testing stability of shield tunnel excavation surface under spring condition
CN206385495U (en) A kind of earth and rockfill dam landslide observed seepage behavior simulation test device
CN109029346B (en) Integrated monitoring device and measuring method for osmotic pressure and settlement in soft soil foundation
CN108692796B (en) Device for measuring water level difference between underground water and surface water in dynamic coal mining subsidence area
CN203429596U (en) Gauging station using pipe jacking technique to build logging well
CN215218452U (en) Novel infiltration tank for simulating clogging of geotextile
CN205691428U (en) Hole internal water pressure test device and test system
CN212722514U (en) Water pressure test device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee