CN2508007Y - Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant - Google Patents

Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant Download PDF

Info

Publication number
CN2508007Y
CN2508007Y CN 01275842 CN01275842U CN2508007Y CN 2508007 Y CN2508007 Y CN 2508007Y CN 01275842 CN01275842 CN 01275842 CN 01275842 U CN01275842 U CN 01275842U CN 2508007 Y CN2508007 Y CN 2508007Y
Authority
CN
China
Prior art keywords
power plant
gas turbine
superheater
steam
waste heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01275842
Other languages
Chinese (zh)
Inventor
于海春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01275842 priority Critical patent/CN2508007Y/en
Application granted granted Critical
Publication of CN2508007Y publication Critical patent/CN2508007Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model relates to a gas turbine facilities equipped reheat cycle power plant waste heat recovery unit. The field of technology is an electric power plant used reheat cycle power plant waste heat recovery unit. The outlet steam temperature of an over heater and a reheater is balanced, because the utility model employs the form that the over heater and the reheater are alternately set stone out. The utility model can operate even if the exhaust temperature of gas turbine is reduced or the gas turbine is operated under the under load level. The thermal efficiency is improvedm, and the rusty to steam turbine last stage, which is caused by wet steam, is avoided.

Description

The residual heat of electric power plant of the thermal cycle again recovering device of gas-turbine plant is housed
Technical field
The utility model relates to a kind of power plant waste heat recovering device, the particularly a kind of residual heat of electric power plant of thermal cycle again recovering device that gas-turbine plant is housed.
Technical background
At present, heat recovery boiler is used in the heat recovery of power plant usually, this boiler is using existence can not change the problem of the Load Distribution difference in each superheater and reheater in the thermal cycle power plant again, and the temperature and pressure with steam maintains relatively difficulty of corresponding horizontal simultaneously.Goal of the invention
The purpose of this utility model is: a kind of residual heat of electric power plant of thermal cycle again recovering device that gas-turbine plant is housed is provided, the steam that produces in the superheater can be introduced high-pressure cylinder, the steam that produces in the reheater is introduced steam turbine, the thermal efficiency of gas turbine is improved.
Summary of the invention
The utility model is achieved in that a kind of residual heat of electric power plant of thermal cycle again recovering device that gas-turbine plant is housed, comprise by near to the secondary reheater that far is sequentially arranged on the combustion turbine exhaustion pipe, secondary superheater, the single reheat device, a superheater, economizer and be arranged on superheater and economizer between vaporizer, a described superheater links to each other with the admission end of secondary superheater with the high-pressure cylinder of steam turbine, single reheat device and secondary reheater are connected between the admission end of the steam output end of high-pressure cylinder and intermediate pressure cylinder, the steam output end of intermediate pressure cylinder links to each other with the admission end of low pressure (LP) cylinder, and the steam output end of low pressure (LP) cylinder is connected with condenser.
The utility model is owing to adopt the alternate form that is arranged in order with reheater of superheater, make the steam exit temperature balance in superheater and the reheater, even be lowered or gas turbine operation still can move during in low load levels in the delivery temperature of gas turbine, improved the thermal efficiency, avoided owing to of the corrosion of wet vapor cause to steam turbine last stage.
Embodiment
Below in conjunction with embodiment of the present utility model the utility model is described further.
Fig. 1 is a structural representation of the present utility model.
As shown in the figure, compressor A links to each other with gas turbine C, from combustion chamber B gas driven combustion Gas-turbine and to load D work done, exhaust is E. The secondary reheater 2 that combustion turbine exhaustion pipe 1 is provided with, Secondary superheater 3, single reheat device 4, superheater 5, an economizer 6 and be arranged on superheater 5 No. one time And the vaporizer between the economizer 67. When gas turbine C load carrying, produce in the vaporizer 7 Steam flows to the high pressure cylinder F of steam turbine through superheater 5 and secondary superheater 3, after the steam work done Flow into intermediate pressure cylinder G and work done through single reheat device 4 and secondary reheater 2, steam enters low pressure (LP) cylinder at last H enters condenser and is condensed into liquid after the work done.

Claims (1)

1. the residual heat of electric power plant of thermal cycle again recovering device that gas-turbine plant is housed, it is characterized in that: comprise by near to the secondary reheater that far is sequentially arranged on the combustion turbine exhaustion pipe, secondary superheater, the single reheat device, a superheater, economizer and be arranged on superheater and economizer between vaporizer, a described superheater links to each other with the admission end of secondary superheater with the high-pressure cylinder of steam turbine, single reheat device and secondary reheater are connected between the admission end of the steam output end of high-pressure cylinder and intermediate pressure cylinder, the steam output end of intermediate pressure cylinder links to each other with the admission end of low pressure (LP) cylinder, and the steam output end of low pressure (LP) cylinder is connected with condenser.
CN 01275842 2001-12-06 2001-12-06 Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant Expired - Fee Related CN2508007Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01275842 CN2508007Y (en) 2001-12-06 2001-12-06 Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01275842 CN2508007Y (en) 2001-12-06 2001-12-06 Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant

Publications (1)

Publication Number Publication Date
CN2508007Y true CN2508007Y (en) 2002-08-28

Family

ID=33680159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01275842 Expired - Fee Related CN2508007Y (en) 2001-12-06 2001-12-06 Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant

Country Status (1)

Country Link
CN (1) CN2508007Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913892A (en) * 2012-11-19 2013-02-06 上海锅炉厂有限公司 T-shaped boiler with reheater
CN106642053A (en) * 2016-11-29 2017-05-10 武汉都市环保工程技术股份有限公司 System of adopting coal gas with low heating value to conduct electricity generation
CN112254561A (en) * 2020-10-19 2021-01-22 中国科学院理化技术研究所 Liquid air energy storage system utilizing LNG cold energy and fuel gas peak shaving power generation waste heat

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913892A (en) * 2012-11-19 2013-02-06 上海锅炉厂有限公司 T-shaped boiler with reheater
CN102913892B (en) * 2012-11-19 2014-07-09 上海锅炉厂有限公司 T-shaped boiler with reheater
CN106642053A (en) * 2016-11-29 2017-05-10 武汉都市环保工程技术股份有限公司 System of adopting coal gas with low heating value to conduct electricity generation
CN112254561A (en) * 2020-10-19 2021-01-22 中国科学院理化技术研究所 Liquid air energy storage system utilizing LNG cold energy and fuel gas peak shaving power generation waste heat

Similar Documents

Publication Publication Date Title
KR100341646B1 (en) Method of cooling thermally loaded components of a gas turbine group
CA2679811C (en) High efficiency feedwater heater
JP4736885B2 (en) Waste heat recovery power generation system
JP2008545945A (en) Steam generating facility, method of operating steam generating facility, and additional equipment
WO2000031381A3 (en) Combined cycle power plant having improved cooling and method of operation thereof
EP1164254A3 (en) Optimized steam turbine peaking cycles utilizing steam bypass and related process
EP0949406A3 (en) Method of heating gas turbine fuel in a combined cycle power plant using multi-component flow mixtures
EP0900921A3 (en) Hydrogen burning turbine plant
RU2062332C1 (en) Combined-cycle plant
CN103062744A (en) Heat recovery steam generator and methods of coupling same to combined cycle power plant
JPH09203304A (en) Compound power generating system using waste as fuel
RU2335641C2 (en) Method of enhancing efficiency and output of two-loop nuclear power station
JP4185326B2 (en) Gas / air combined turbine equipment
US10287922B2 (en) Steam turbine plant, combined cycle plant provided with same, and method of operating steam turbine plant
CN2508007Y (en) Reheat circulation waste heat recovering device provided with gas turbine apparatus for power plant
US11313252B2 (en) Enhanced HRSG for repowering a coal-fired electrical generating plant
US7033420B2 (en) Process and apparatus for the thermal degassing of the working medium of a two-phase process
CN111457353A (en) Boiler feed water heating and oxygen removing system and method coupled to boiler workshop of household garbage incineration power plant
Kindra et al. Thermodynamic analysis of an innovative steam turbine power plant with oxy-methane combustors
RU2391517C2 (en) Steam-gas installation
RU2776091C1 (en) Thermal power plant
US6047549A (en) Power plant facility
SU1813885A1 (en) Combined-cycle plant operating process
JP2020159264A (en) gas turbine
JP2003021301A (en) Boiler facility, combined cycle gas turbine generating system, combined cycle plant, and water recovering method for facility plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Yu Haichun

Document name: Notice of termination

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee