CN2476600Y - Steel reinforced concrete split hollow shear wallboard - Google Patents

Steel reinforced concrete split hollow shear wallboard Download PDF

Info

Publication number
CN2476600Y
CN2476600Y CN 01212935 CN01212935U CN2476600Y CN 2476600 Y CN2476600 Y CN 2476600Y CN 01212935 CN01212935 CN 01212935 CN 01212935 U CN01212935 U CN 01212935U CN 2476600 Y CN2476600 Y CN 2476600Y
Authority
CN
China
Prior art keywords
shear wall
model
utility
template
wall slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01212935
Other languages
Chinese (zh)
Inventor
许淑芳
张兴虎
姜维山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN 01212935 priority Critical patent/CN2476600Y/en
Application granted granted Critical
Publication of CN2476600Y publication Critical patent/CN2476600Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a RC spilt hollow shear wall, which consists of a plurality of reinforcing units (1), a formwork (2) is arranged between the two reinforcing units so that a longitudinal seam is formed; a cylindrical internal formwork (3) is placed at the center of the shear wall so that longitudinal cavities are formed. The utility model has smaller rigidity compared with the common shear wall, long self-vibration period, low earthquake response, saved materials, high bearing capacity, good effects in sound/heat insulation and heat preservation, light selfweight, as well as an ideal structure system with good earthquake-resistant behavior and reasonable construction cost, therefore, is suitable for multistory and small-and-median high-rise housing, and buildings with frame shear wall, larger space at ground/high-rise floor.

Description

The split type hollow shear wall slab of steel concrete
The utility model relates to the building structure member, particularly the split type hollow shear wall slab of steel concrete.
China is populous, but one mu of per capita area of cultivated farmland less than.Loam brick is used in construction work in a large number, and the arable area of China is reduced with surprising rapidity.Country attaches great importance to this situation at present, calls the whole nation to quicken the wall reform paces, abolishes the application of loam brick in building construction as early as possible, to protect the fields, saves the energy, the conservation of nature environment.
At present, some earthquake areas multilayers and little high-story house adopt common reinforced concrete shear wall structure.Because this body of wall rigidity is big, certainly the shake cycle short, the house is from great, so geological process is big, and its to destroy form be the shear failure of fragility, in order to resist bigger seismic shear, must the enlarging section size and increase quantity of reinforcement.The split type hollow shear wall slab of steel concrete of the present utility model, be to draw common reinforced concrete shear wall good integrity, the bearing capacity height, advantages such as anti-seismic performance is good, overcome its use with multilayer and in the small sized multiple story building from great, certainly the shake cycle short, earthquake response is big, the cost height destroys a kind of new structure plate that the shortcomings such as shear failure for fragility propose.This plate is utilize to adjust the rigidity of building self and deadweight and reach a kind of shock-damping structure plate that reduces geological process.
The purpose of this utility model is to propose a kind of bearing capacity height, sound insulation, insulation, good heat-insulation effect, good from heavy and light, anti-seismic performance, mainly is suitable for multi-storey building, little high residential building and the split type hollow shear wall slab of steel concrete of the more public building of wall in length and breadth.
Technical solution of the present utility model is achieved in that
The split type hollow shear wall slab of steel concrete is made up of a plurality of arrangements of reinforcement unit (1), separates with template (2) between each arrangement of reinforcement unit (1), forms vertically seam; Put into cylindrical internal mold (3) in the middle of the shear wall slab, in wallboard, form vertical hole (4).
Shear wall slab is all reserved connecting reinforcement (5) up and down, and the wallboard side adjacent with constructional column also reserved the reinforcing bar (6) that is connected with constructional column.
This shear wall slab both can adopt the assembled integral construction, also can adopt the cast-in-site construction.
Template (2) thickness between the wall panel element (1) is generally 8~12mm, and this template can adopt disposable template, also can adopt tool-typed formwork.
Alleged split type of the utility model is meant with shear wall with vertical seam separately, forms shear wall with seam.Alleged hollow being meant before the shear wall fluid concrete put into cylindrical internal mold, makes and forms vertical hole within the walls, just as the hole heart floor of erectting.
The utlity model has following beneficial effect:
1, body of wall of the present utility model has been protected the farmland without loam brick, saves the energy, has avoided firing the atmosphere that loam brick causes and the environment pollution on ground.
2, alleviate dead load, economical with materials.Compare with common shear wall, weight can alleviate 25%~30%, has also saved the concrete of same ratio.
3, bearing capacity height, anti-seismic performance is good.The vertical bearing capacity of this wall is 4~5 times with cross section clay brick masonry wall; Shear-carrying capacity is 3~4.5 times of clay tile wall.This means that under the condition of identical wall thickness, the height of building can improve more than the twice.This is to improving land utilization ratio, and it is in short supply helpful to alleviate urban land.Rationally adjust the rigidity of structure, reduce geological process, both guaranteed that there is good seismic resistance in the house, reduced cost of a building again.
4, in common middle or small high-rise reinforced concrete shear wall building, owing to be subjected to the restriction of wall ratio of height to thickness, materials for wall is not fully used, and adopts hollow shear wall, has both satisfied the ratio of height to thickness requirement, and material is fully used.
5, hollow shear wall structure of the present utility model can be by the size in hole and the rigidity of reservation seam adjustment building, suitably lengthening is from the shake cycle, reduce geological process, thereby the also corresponding minimizing of sectional dimension with quantity of reinforcement, and with the brittle fracture of shearing-type change into plasticity preferably the curved scissors type destroy form, improved the ductility and the energy-dissipating property of building.
6, insulation, heat insulation, the more solid reinforced concrete wall of sound insulation value is good, energy-saving effect is obvious.
7, the internal mold pore-forming made from paper web mould or more cheap industrial waste, construction is simple, and is cheap.
Owing to the utlity model has the bearing capacity height, sound insulation, insulation, good heat-insulation effect are from heavy and light, multiple advantages such as anti-seismic performance is good, not only being fit to multilayer, medium and small high residential building, and being suitable for the more public building of wall in length and breadth, is the moderate ideal structure system of a kind of cost.This utility model is used in frame-shear wall and the bottom large space is many, in the high-story house, also can obtain same effect, thereby have wide application value.
The utility model is described in further detail below in conjunction with accompanying drawing:
Fig. 1 is a wallboard sectional structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of the utility model wallboard 1;
Fig. 3 is the structural representation of the utility model wallboard 2.
Embodiment 1:
Referring to Fig. 1, the form of reinforcement of the shear wall of this utility model is different with common shear wall, and it is made up of a plurality of arrangements of reinforcement unit 1, leaves the vertical slit of about 10mm between each arrangement of reinforcement unit 1, and the width of each arrangement of reinforcement unit and thickness are determined by design.Put into cylindrical internal mold 3 in the middle of the shear wall slab of each arrangement of reinforcement unit, in wallboard, form vertical hole 4.
The shear wall slab of this utility model both can adopt the assembled integral construction, also can adopt cast-in-site.
When shear wall adopted assembled integral, earlier at the prefabricated monolithic wallboard of precast yard or job site, its concrete work progress was as follows:
(1) determines the width and the thickness of each arrangement of reinforcement unit 1 according to engineering design, separate with the thick template of about 10mm between two arrangement of reinforcement unit 1.This template can be disposable template, as: three-ply board or other light material; Also can use tool-typed formwork, can dismantle, use repeatedly.
(2) put into a plurality of cylindrical internal molds 3 by designing requirement in the middle of each arrangement of reinforcement unit, this internal mold 3 can be selected hollow cardboard tube for use, or the more cheap internal mold of being made by industrial waste.
(3) shear wall slab is all reserved connecting reinforcement 5 (as shown in Figure 2) up and down, and the wallboard side adjacent with constructional column also reserved the reinforcing bar 6 (as shown in Figure 3) that is connected with constructional column.
(4) with concrete each arrangement of reinforcement unit 1 is poured into a mould, its cast operation and maintenance operation are with common precast floor slab and wallboard.After the cast maintenance finishes, promptly make the split type hollow shear wall slab of steel concrete.
When (5) installing at the scene, colligation and install collar tie beam and the constructional column reinforcing bar after, this prefabricated panel is installed, the reservation connecting reinforcement 6 of wallboard being reserved connecting reinforcement 5 and wallboard side up and down inserts respectively in collar tie beam and the constructional column, fluid concrete makes wallboard and collar tie beam and constructional column form integral body then; The door and window hole place adopts local cast-in-place method to handle, and so just makes the split type hollow shear wall system of the steel concrete that has vertical seam and form vertical hole within the walls.
Embodiment 2:
With reference to Fig. 1, Fig. 2 and Fig. 3.When this utility model adopted cast-in-site, its working procedure and common monolithic reinforced concrete structure were roughly the same.Concrete work progress is as follows:
(1) determine the width and the thickness of each arrangement of reinforcement unit 1 according to engineering design, leave about 10mm slit between two arrangement of reinforcement unit 1, the template 2 thick with about 10mm separates.This template can be three-ply board or other light material; Also can adopt tool-typed formwork.
(2) the hollow cardboard tube of putting into the certain diameter size by a certain percentage according to designing requirement in the middle of each arrangement of reinforcement unit is made internal mold 3.
(3) reinforcing bar directly stretches into anchoring in the collar tie beam about the arrangement of reinforcement unit.
(4) the arrangement of reinforcement unit that links to each other with constructional column, the reinforcing bar that stretch out the side directly stretches into the constructional column anchoring.
(5) the door and window hole place adopts steel concrete dark side frame to strengthen.
(6) all reinforcing bar binding finishes, an exterior sheathing, fluid concrete.

Claims (3)

1, the split type hollow shear wall slab of steel concrete, it is characterized in that: this shear wall slab is made up of a plurality of arrangements of reinforcement unit (1), separates with template (2) between each arrangement of reinforcement unit, forms vertically seam; Put into cylindrical internal mold (3) in the middle of the shear wall slab, in wallboard, form vertical hole (4).
2, hollow shear wall slab according to claim 1 is characterized in that: shear wall slab is all reserved connecting reinforcement (5) up and down, and the wallboard side adjacent with constructional column also reserved the reinforcing bar (6) that is connected with constructional column.
3, hollow shear wall slab according to claim 1 is characterized in that: template (2) thickness between the wall panel element (1) is generally 8~12mm, and this template can adopt disposable template, also can adopt tool-typed formwork.
CN 01212935 2001-01-16 2001-01-16 Steel reinforced concrete split hollow shear wallboard Expired - Fee Related CN2476600Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01212935 CN2476600Y (en) 2001-01-16 2001-01-16 Steel reinforced concrete split hollow shear wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01212935 CN2476600Y (en) 2001-01-16 2001-01-16 Steel reinforced concrete split hollow shear wallboard

Publications (1)

Publication Number Publication Date
CN2476600Y true CN2476600Y (en) 2002-02-13

Family

ID=33632019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01212935 Expired - Fee Related CN2476600Y (en) 2001-01-16 2001-01-16 Steel reinforced concrete split hollow shear wallboard

Country Status (1)

Country Link
CN (1) CN2476600Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812880A (en) * 2010-04-07 2010-08-25 湖南大学 Multi-rowcore cast-in-place concrete heat-preservation shear wall
CN106968360A (en) * 2017-04-28 2017-07-21 东南大学 A kind of prefabricated hollow formula opens perps concrete shear force wall
CN110565871A (en) * 2019-09-20 2019-12-13 北京中清恒业科技开发有限公司 assembled heat insulation structure integrated steel keel shear wall and construction method thereof
CN110748027A (en) * 2019-10-31 2020-02-04 大连民族大学 Concrete large hollow shear wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812880A (en) * 2010-04-07 2010-08-25 湖南大学 Multi-rowcore cast-in-place concrete heat-preservation shear wall
CN106968360A (en) * 2017-04-28 2017-07-21 东南大学 A kind of prefabricated hollow formula opens perps concrete shear force wall
CN110565871A (en) * 2019-09-20 2019-12-13 北京中清恒业科技开发有限公司 assembled heat insulation structure integrated steel keel shear wall and construction method thereof
CN110748027A (en) * 2019-10-31 2020-02-04 大连民族大学 Concrete large hollow shear wall

Similar Documents

Publication Publication Date Title
CN2649670Y (en) Two-way forced prestressed hollow plate
CN1298946C (en) Steel-steel concrete fully prefabricated assembling structure
CN1800531A (en) Joint construction method of prefabricated composite bearing wall structure
CN1147652C (en) Technology for building house with slab-type structure
CN111155681B (en) Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN101845852A (en) Light steel and light concrete structural system and construction method thereof
CN2288226Y (en) Shear key-type bidirectional hollow large board of reinforced concrete
CN2319470Y (en) Dense rib type compound wall board
CN210086489U (en) Dry-type connected low-rise assembly type building structure system
CN1888344A (en) Composite thermal insulation concrete load-bearing wall
CN2476600Y (en) Steel reinforced concrete split hollow shear wallboard
CN1632252A (en) Light steel sealed column framework construction system
CN2878563Y (en) Two-way pre-stressed floor/roofing and wall body laminated hollow plate
CN1888343A (en) Composite thermal insulation concrete shear wall
CN108625491B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node
CN2583234Y (en) On site pouring reinforced concrete hollow cavity shearing wall
CN200952187Y (en) Assembling building structural components
CN101418603B (en) Reinforced concrete mesh type frame structure using phosphogypsum as wall material and manufacture method
CN108412036A (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN2387178Y (en) Novel steel pipe concrete pole
CN200946339Y (en) In-situ steel reinforced concrete slab for insulating noise
CN1190571C (en) Suspension type steel concrete residence structure
CN210049379U (en) Steel concrete combined frame column assembly type structure system
CN209975803U (en) Ecological composite wall structure
CN210263373U (en) Cold-formed thin-walled steel structure of high-strength steel frame-superposed corrugated steel plate wall anti-side

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee