CN2471920Y - Hand tool for drilling in construction engineering - Google Patents
Hand tool for drilling in construction engineering Download PDFInfo
- Publication number
- CN2471920Y CN2471920Y CN 01211422 CN01211422U CN2471920Y CN 2471920 Y CN2471920 Y CN 2471920Y CN 01211422 CN01211422 CN 01211422 CN 01211422 U CN01211422 U CN 01211422U CN 2471920 Y CN2471920 Y CN 2471920Y
- Authority
- CN
- China
- Prior art keywords
- semi
- cylinder
- drilling
- hollow shovel
- drilling rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a hand tool for architectural drill, which is characterized in comprising two parts; that is, a drill bit and a drill rod; wherein, the drill bit part is a cylinder-shaped hollow shovel 1; a cutting edge 6 and a cylinder nose bridge are separately arranged on the front and back sides of the semi-cylinder-shaped hollow shovel 1; the drill rod part is connected with the back side of the semi-cylinder-shaped hollow shovel 1. The drill rod part comprises an operating lever handle 3, an extension bar 5 and a joint tube hoop 4 which lies between the operating lever handle 3 and the extension bar 5. The utility model has the advantages of having simple structure, good mobility and flexibility, high efficiency, low cost and reliable quality, and being applicable for various complicated fields.
Description
The utility model relates to the project building construction instrument, particularly a kind of drilling tool manually that uses in engineering construction building site bracing of foundation pit, roadbed side slope reinforcing, soil nailing drilling construction.
At present, be widely used in generally adopting in the aspects such as building site bracing of foundation pit, roadbed side slope reinforcing roof-bolter boring.We know, in building operations, anchor pole is a kind of tension member of using in the capital works excavation, as Chinese patent CN94108778.6 number disclosed " special drilling machine of large-head anchor rod construction method and use thereof ", the one end is connected with engineering foundation ditch retaining wall, the other end is anchored in the underground soil layer, to bear soil layer or water pressure to the thrust that retaining wall causes, keeps the stability of soil layer or building.The processing step of existing anchor rod construction method is: 1, hole to projected depth with auger; 2, put into the steel trombone slide that the next door is fixed with the Grouting Pipe of plastic pipe or steel pipe; 3, by the Grouting Pipe grout injection of plastic pipe or steel pipe, generally need perfusion three times and health.The anchor pole of constructing like this is because of the frictional force between anchor pole and the undisturbed soil reduces, and the pulling capacity of bearing is low.In order to improve anti-pulling of anchor bar, need to increase the quantity and the length of anchor pole, brought great difficulty to construction, increased operating expenses, delayed programming.In recent years, along with highrise building, the Deep Foundation Excavation engineering progressively increases, and basic retaining wall is more and more higher, and the anchor pole pulling capacity of making of existing job practices is lower, does not satisfy design requirement far away.For this reason, people adopt the long anchor pole that steel hinge rope is made more.Though this long anchor pole anchored force is bigger, complex process, constructional difficulties, because the geology soil layer changes greatly, and anchored force can not scale up with the increase of pull bar length, although rock-bolt length increases much sometimes, anchored force increases very little simultaneously.In addition, even more important a bit is the restriction that this technology is subjected to the operation place, promptly the operation site condition is required height, and relocation equipment displacement difficulty is prone to mechanical breakdown, incurs loss through delay the duration, engineering cost cost height, and the power etc. that wastes energy.
The purpose of this utility model is: the problem design that exists at prior art provides a kind of simple in structure, and maneuverability is applicable to various complicated difficult site conditions, and rapidly and efficiently, cost is low, the hand-operated tools of reliable quality engineering construction boring.
The utility model is achieved by following manner: a kind of hand-operated tools of engineering construction boring, it is characterized in that forming by drill bit and drilling rod two parts, wherein, bit part is the hollow shovel 1 of a semi-cylindrical shaped, the front end and the back side at the hollow shovel 1 of semi-cylindrical shaped are respectively equipped with the cutting edge 6 and the tube bridge of the nose 2, back at the hollow shovel 1 of semi-cylindrical shaped then partly is connected with drilling rod, the said connection here can be welding, riveted joint or other are conveniently detachable fixedly connected etc., as Fig. 1,2, shown in 3, the hollow shovel 1 of the said semi-cylindrical shaped in front removes the part after half and at its front end and the back side cutting edge 6 and a tube bridge of the nose 2 is set respectively for hollow cylindrical, wherein cutting edge 6 can be 45 ° of gradients, can certainly according to circumstances be designed to other angle, as 30 ° (or between 30 °-45 °) or the like, and the end of cutting edge 6 is straight, sometimes also can be designed to circular arc, be similar to the circular shape of spade front end.In addition, one that the tube bridge of the nose 2 provides in figure, two or more that also can uniform setting, the shape of the tube bridge of the nose 2 also is circular (or circular arc), just its radius is big (and thickness is less) than the radius of the hollow shovel 1 of semi-cylindrical shaped, is convenient to operation (as creep into and fetch earth) etc. like this in the engineering construction.The drilling rod part is made up of action bars handle 3, extension bar 5 and the joint pipe collar 4 of the two, as shown in Figure 1, 2, 3, here drilling rod partly is by increasing the length that joint pipe collar 4 and extension bar 5 come the extension arm part by the intensification of construction drilling depth, be generally hole depth at 2-30 meters, drilling diameter becomes orifice angle at 0-90 ° at 80-200 millimeters.
The important technological parameters of the drill bit of present technique, drilling rod part is: 100-300 millimeters of the length of the hollow shovel 1 of the semi-cylindrical shaped of bit part, diameter is 60-280 millimeters, wall thickness is 4-10 millimeters, the gradient of cutting edge 6 is 30 °-45 °, the tube bridge of the nose 2 wide 15-30 millimeters is apart from 20-40 millimeters of front end cutting edge distances.19-50 millimeters of the action bars handle 3 of drilling rod part and extension bar 5 diameters, 2-5 millimeters of wall thickness, 1-9 meters of single-unit length (two ends cover external screw thread), the internal diameter of joint pipe collar 4 internal thread that matches with the drilling rod external diameter, 3.5-4.5 millimeters of wall thickness, 30-80 millimeters of length.See Table 1 according to the situation of change that becomes the corresponding boring bar tool technical data of hole size variation in the concrete construction
Table one drilling tool parameter change list
Drilling diameter (mm) | 100 | 150 | 200 | 250 | |
Drill bit | Length (mm) | 380 | 225 | 200 | 200 |
Barrel dliameter (mm) | 80 | 125 | 175 | 225 | |
Wall thickness (mm) | 3 | 3 | 3.5 | 3.5 | |
Blade angle (mm) | 60° | 60° | 60° | 60° | |
Drilling rod | Diameter (mm) | 19 | 19 | 19 | 33.5 |
Wall thickness (mm) | 2.75 | 2.75 | 2.75 | 3.25 | |
Single-unit length (mm) | 1~6 | 1~6 | 1~6 | 1~6 | |
Male thread length (mm) | 25 | 25 | 40 | 40 | |
Pipe collar | Internal diameter (mm) | 19 | 19 | 19 | 33.5 |
Wall thickness (mm) | 4 | 4 | 4 | 5 | |
Length (mm) | 60 | 60 | 60 | 60 |
The method of operating of present technique is: finish by perforate-creep into-fetch earth-operations such as pore-forming.Specifically: 1, perforate is very important, needs under the technician instructs, and the experience operator of having selected for use is fixed direction, controls into orifice angle well.2,12 meters of depth of pore forming can be finished with interior need two people, when creeping into, add low amounts of water, lubricate during each circulation beginning in tube.3, fetch earth, operating personnel creep into 20cm, promptly carry brill, dig out earth pillar in the drill bit tube with crooked chisel.4, pore-forming behind the pore-forming, should be removed an interior residual loose ground, until natural feeding, need not soil enter the tube in till.
Personnel's configuration: when 1, becoming aperture 100mm, in (1) hole depth 12m, 2 people, (2) hole depth 12-15m, 3 people, (3) hole depth 15-20m, 4 people, the super 20m of (4) hole depth, 5 people.When 2, becoming aperture 150mm, in (1) hole depth 10m, 2 people, (2) hole depth 10-15m, 4 people, (3) hole depth 15-20m, 6 people, the super 20m of (4) hole depth, 8 people.When 3, becoming aperture 200mm, in (1) hole depth 10m, 3 people, (2) hole depth 10-15m, 5 people, the super 15m of (3) hole depth, 6 people.When 4, becoming aperture 250mm, in (1) hole depth 10m, 4 people, (2) hole depth 10-15m, 6 people, the super 15m of (3) hole depth, 8 people.
The scope of application: 1, formation condition: (1) cohesive soil, (2) plain fill, the sand that (3) groundwater table is above, the sand behind (4) precipitation, sand gravel soil, (5) highly weathered rock soil.
The engineering construction project: (1) foundation ditch soil nailing circummure protects, and (2) pit pile anchor is gone along with sb. to guard him, (3) slope reinforcement, (4) soil body anchoring, (5) rectifying of leaned building anchoring.
The utility model is compared with prior art, has simple in structurely, and maneuverability is applicable to the place execution conditions of various complicated difficulties, the efficient height, and cost is low, characteristics such as reliable in quality.
Fig. 1 is a front view of the present utility model.
Fig. 2 is a lateral view of the present utility model.
Fig. 3 is a vertical view of the present utility model.
Among the figure: the hollow shovel of 1 semi-cylindrical shaped, 2 bridge of the noses, action bars handle, 4 joint pipe collars, 5 extension bars, 6 cutting edges.
Most preferred embodiment of the present utility model, as shown in Figure 1, 2, 3.A kind of hand-operated tools of engineering construction boring, it is characterized in that forming by drill bit and drilling rod two parts, wherein, bit part is the hollow shovel 1 of a semi-cylindrical shaped, the front end and the back side at the hollow shovel 1 of semi-cylindrical shaped are respectively equipped with the cutting edge 6 and the tube bridge of the nose 2, the back of the hollow shovel 1 of semi-cylindrical shaped then partly is connected with drilling rod, the said connection here can be welding, riveted joint or other be conveniently detachable to be fixedly coupled etc., as Fig. 1,2, shown in 3, the hollow shovel 1 of the said semi-cylindrical shaped in front removes the part after half and at its front end and the back side cutting edge 6 and a tube bridge of the nose 2 is set respectively for hollow cylindrical, wherein cutting edge 6 can be 45 ° of gradients, can certainly according to circumstances be designed to other angle, as 30 ° (or between 30 °-45 °) or the like, and the end of cutting edge 6 is straight, sometimes also can be designed to circular arc, be similar to the circular shape of spade front end.In addition, one that the tube bridge of the nose 2 provides in figure, two or more that also can uniform setting, the shape of the tube bridge of the nose 2 also is circular (or circular arc), just its radius is big (and thickness is less) than the radius of the hollow shovel 1 of semi-cylindrical shaped, is convenient to operation (as creep into and fetch earth) etc. like this in the engineering construction.The drilling rod part is made up of action bars handle 3, extension bar 5 and the joint pipe collar 4 of the two, as shown in Figure 1, 2, 3, here drilling rod partly is by increasing the length that joint pipe collar 4 and extension bar 5 come the extension arm part by the intensification of construction drilling depth, be generally hole depth at 2-30 meters, drilling diameter becomes orifice angle at 0-90 ° at 80-200 millimeters.
Claims (1)
1, a kind of hand-operated tools of engineering construction boring is made up of drill bit and drilling rod two parts, it is characterized in that,
A, bit part are the hollow shovel of a semi-cylindrical shaped (1), are arranged with the cutting edge (6) and the tube bridge of the nose (2) at the front end and the back side of the hollow shovel of semi-cylindrical shaped (1), and the rear end of the hollow shovel of semi-cylindrical shaped (1) then partly is connected with drilling rod;
B, drilling rod part are made up of action bars handle (3), extension bar (5) and the joint pipe collar (4) of the two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01211422 CN2471920Y (en) | 2001-01-17 | 2001-01-17 | Hand tool for drilling in construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01211422 CN2471920Y (en) | 2001-01-17 | 2001-01-17 | Hand tool for drilling in construction engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2471920Y true CN2471920Y (en) | 2002-01-16 |
Family
ID=33630816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01211422 Expired - Fee Related CN2471920Y (en) | 2001-01-17 | 2001-01-17 | Hand tool for drilling in construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2471920Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287133A (en) * | 2011-08-24 | 2011-12-21 | 成都科盛石油科技有限公司 | Rotation device used for shallow well drilling |
-
2001
- 2001-01-17 CN CN 01211422 patent/CN2471920Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287133A (en) * | 2011-08-24 | 2011-12-21 | 成都科盛石油科技有限公司 | Rotation device used for shallow well drilling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108775014B (en) | Construction method of rotary spraying anchor cable or rotary spraying anchor rod with umbrella-shaped expanding structure | |
CN101831906B (en) | Dry type pneumatic rock drilling pile-driving machine and working method thereof | |
CN203452083U (en) | Rotary expanding pile construction equipment and grout feeding device | |
CN108678130A (en) | A kind of non-digging drag pipe construction method | |
CN108517877B (en) | Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles | |
CN105780763A (en) | Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile | |
CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
CN101749024B (en) | Pipe-pulling construction method of underground buried box culvert | |
KR101766165B1 (en) | Column Pile Construction Method Using And Top-Down Method Using Thereof | |
CN202509533U (en) | Single reinforcement pulling force type anti-floating anchor rod | |
CN101608448A (en) | Cement paste spraying multi-directional core entraining agitation pile piling method | |
CN102182399B (en) | Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag | |
CN103321235A (en) | Composite soil nailing wall slope support method | |
CN106522213A (en) | Rotary jet grouting bar inserting type mini pile construction method | |
CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
CN105040695A (en) | Anchor rod structure capable of integrally working and construction method | |
CN103485344A (en) | Method for extracting construction engineering pile foundation | |
CN205444192U (en) | Bridge stake is towards pile driving construction system | |
CN2471920Y (en) | Hand tool for drilling in construction engineering | |
CN103882859B (en) | A kind of original state of Shi Hanzhang fetches earth cast-with-pressure concrete pile and construction method thereof | |
CN1995689A (en) | Pile forming mechanism with gyro bit and the gyro bit and pile forming method | |
CN206581314U (en) | Screw head muscle body posttension pile foundation | |
CN210598826U (en) | Mechanical pile forming device for bottom-expanding cast-in-place foundation pile | |
CN106639915A (en) | Construction device for long-spiral filling pile and construction process thereof | |
JP4450135B2 (en) | Cutting and drawing method and equipment for existing piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |