CN2465105Y - Waste gas flow resisting device for condensed water receiving tube of gas boiler - Google Patents
Waste gas flow resisting device for condensed water receiving tube of gas boiler Download PDFInfo
- Publication number
- CN2465105Y CN2465105Y CN00258187U CN00258187U CN2465105Y CN 2465105 Y CN2465105 Y CN 2465105Y CN 00258187 U CN00258187 U CN 00258187U CN 00258187 U CN00258187 U CN 00258187U CN 2465105 Y CN2465105 Y CN 2465105Y
- Authority
- CN
- China
- Prior art keywords
- condensed water
- water receiving
- waste gas
- receiving tube
- boiler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses a waste gas flow blocking device used for condensed water receiving pipes of fuel gas boilers. High temperature waste gas can coagulate condensed water at the time of carrying out heat change after sending out heat quantity at the first stage running of a boiler or in the process of the running of the boiler. In order to doubly enhance the safety factor of boilers, when condensed water in a condensed water receiving pipe 10 of a siphon structure doesn't reach a definite water level, a part of waste gas is blocked and flows in rooms through the condensed water receiving pipe 10, the middle of the condensed water receiving pipe 10 is provided with a datum water lever film 16a, the middle part of the condensed water receiving pipe 10 is downwards bended, the center of the condensed water receiving pipe 10 is provided with a condensed water drop hole 16b which penetrates the film 16a, a condensed water sealing ball 18 with large buoyancy is arranged above the condensed water receiving pipe 10, and condensed water and the condensed water sealing ball 18 are used for closing the condensed water drop hole 16b using a datum residual water level L as a centre.
Description
The utility model relates to a kind of waste gas choke apparatus, especially a kind of gas fired-boiler waste gas choke apparatus of condensed water receiving tube.
In general, gas fired-boiler can be divided into wall-hanging and site type by the form of setting; Divide by the warm water method of supplying, the heat exchanger of boiler own is arranged, provide the mode of warm water and warm water that the mode that provides by water tank when needing is provided in the water tank by heat exchanger; According to the endless form of heating water, can be divided into the atmosphere opening formula that the heating installation circulatory system and the atmospheric exposure formula and the interior heating installation circulatory system of boiler of atmospheric isolation are communicated with atmosphere in the boiler.
This gas fired-boiler is the same with plain cylindrical furnace, in heating installation pipe arrangement and body, fill under the state of water, with gas burner heating, again with circulating pump with hot water from heating installation pipe arrangement and heat supply water pipe toward indoor supply.The heating back is along with hot water temperature's rising, boiler internal air pressure also raises gradually, the hot water that overflows can flow to storage tank by swelling pipeline, when boiler shuts down, after water temperature in body and the heating installation pipe arrangement descends, the heating clamber pressure inside also descends thereupon, owing to exist the water of pressure reduction storage tank to form automatic the backflow and to replenish the loop structure of the not enough water yield by the swelling pipeline adverse current to body and heating installation pipe arrangement.
Especially in condensation gas boiler, the high-temp waste gas that produces during burning carries a large amount of heat energy, in order to improve the thermal efficiency, can make the cooling segment of waste gas by heat exchanger, when temperature is lower than dew point, and waste gas meeting condensation, and discharge heat, can be for utilizing again.
This gas fired-boiler is arranged in the room or the nearer place from the room mostly, the characteristic of fuel the and indoor security that factor all can influence use is set etc. in use, so need the necessity of lay special stress on ventilation, be that the indoor back of waste gas inflow is caused by the carbon monoxide in the waste gas (CO) greatly in the in fact relevant accident with boiler.
Especially condensation gas boiler, if test running boiler when the water level in the condensed water receiving tube does not reach a certain height, though then the most waste gas of burning generation can drain into the external world by exhaust outlet, some waste gas can flow into indoor by the condensed water receiving tube.This is the problem that exists in the structure of existing condensation gas boiler.
Task of the present utility model provides the waste gas choke apparatus of a kind of gas fired-boiler with the condensed water receiving tube, in boiler start of run or the operation process, when the water in the condensed water receiving tube of syphon structure does not reach certain water level, can prevent that also the part of waste gas from flowing into indoor by the condensed water receiving tube.
For realizing above-mentioned task, solution of the present utility model is: in the gas fired-boiler with condensation function, the high-temp waste gas that is discharged outside to is undertaken being condensed into liquid after the heat exchange by above-mentioned main heat exchanger, the condensation latent heat that produces when making full use of condensation improves the thermal efficiency of boiler, and the condensed water receiving tube by syphon structure, it is indoor to prevent that waste gas from flowing into.Be provided with the datum level film in the centre of condensed water receiving tube, its middle part is bent downwardly, central authorities are provided with the condensing drip hole of running through the datum level film, and the condensed water ball sealer of big buoyancy is set above it, with the residual water level of benchmark is the center, by condensed water and condensed water ball sealer sealing condensing drip hole, prevent that waste gas from going into indoor by the condensing drip orifice flow of condensed water receiving tube.
Because the gas fired-boiler waste gas choke apparatus of condensed water receiving tube in the utility model, having adopted with the residual water level of benchmark is the datum level film that has the condensing drip hole at center and the design of condensed water ball sealer, make when fully absorbing the condensation latent heat of the high-temp waste gas that produces in boiler initial operation and the operation process, water in the condensed water receiving tube of syphon structure does not reach under the situation of certain water level, make the datum level membrane closure with the condensed water ball sealer, a part that prevents waste gas flows into condensed water receiving tube inside, and reaches indoor.In addition, because the utility model need not use electric control signal, with the automatic choked flow of power of floating, thus the security that has improved boiler greatly, and provide cost savings.
Below in conjunction with drawings and Examples the utility model is described in more detail.
Fig. 1 adopts the cut-away view of the utility model gas fired-boiler with the gas fired-boiler of condensed water receiving tube waste gas choke apparatus.
Fig. 2 is the detailed structure view of the utility model gas fired-boiler with the waste gas choke apparatus of condensed water receiving tube.
10, condensed water receiving tube 12, overflow pipe 14, condensation-water drain 16a, datum level film
16b, condensing drip hole 18, condensed water ball sealer 20, exhaust portion 22, discharge duct
24, exhaust outlet 26, main heat exchanger
As shown in Figure 1, the waste gas that in the boiler operation process, produces, through temperature after main heat exchanger 26 heat exchanges of exhaust portion 20 reach dew point when following waste gas can condense into condensed water, outside condensed water is expelled to by condensation-water drain 14.Simultaneously, the condensed water receiving tube 10 that is connected between the discharge duct 22 of above-mentioned exhaust portion 20 bottoms and condensation-water drain 14 is arranged to a syphon structure that can accumulate certain water level.
As shown in Figure 2, when accumulating to certain water level, condensed water flows to the middle part of the condensed water receiving tube 10 of reversible turnback, forming a middle part is bent downwardly, its central authorities are provided with the datum level film 16a of condensing drip hole 16b, and above the condensing drip hole 16b of said reference water level film 16a, the condensed water ball sealer 18 of the big buoyancy that can move according to the buoyancy that accumulates water level of condensed water is set.
In boiler start of run or operation process, when the condensation portion that the high-temp waste gas that boiler produces flows through main heat exchanger 26 is carried out heat exchange, below dew point, condense into condensed water, this condensed water is by the condensing drip hole 16b of datum level film 16a central authorities, flow into the inside of condensed water receiving tube 10, when condensed water rises to the top of the residual water level L of benchmark, produce buoyancy, condensed water ball sealer 18 can upwards float and move to the top of datum level film 16a according to the size of buoyancy.
That is to say, carry out the condensed water that freeze-outs after the heat exchange through main heat exchanger 26, inflow is connected in the condensed water receiving tube 10 of discharge duct 22 belows of exhaust portion 20, form certain water level, and can drain into the external world from condensation-water drain 14, while, if flow into too much condensed water, then water can flow out from overflow pipe 12 in above-mentioned condensed water receiving tube 10.
Condensed water closure ball 18 can upwards float according to the size that accumulates the buoyancy that water level provides of condensed water, form the datum level film 16a of sealing, so also the part of choked flow waste gas is indoor by 10 inflows of condensed water receiving tube automatically under the condition of the control signal that does not have master controller 30.In boiler entry into service or operation process,, also can use the condensing drip hole 16b on the condensed water ball sealer 18 sealing datum level film 16a, but the inflow of choked flow waste gas is indoor even the water level that accumulates in the condensed water receiving tube of syphon structure 10 does not reach certain water level.
If the condensed water of exhaust portion 20 constantly drips, the water level of condensed water rises to the top of the residual water level L of benchmark of condensed water receiving tube 10, condensed water closure ball 18 upwards floats under buoyancy, then the condensing drip hole 16b of said reference water level film 16a is in open state, water overflows but the space that waste gas can pass through has been condensed, be in closed state, so choked flow flows into condensed water inside from the part of the waste gas of exhaust portion 20 automatically, even therefore do not utilize the control signal of master controller 30 to interrupt boiler work, also can prevent that the stream of waste gas from leaking from structure.
Not elsewhere specified exhaust outlet 24 is that waste gas is through being discharged to extraneous outlet after the exhaust portion 20.
Claims (1)
1, a kind of gas fired-boiler waste gas choke apparatus of condensed water receiving tube, be provided with discharge duct (22) in condensation gas boiler exhaust portion (20) bottom, be provided with the condensed water receiving tube (10) of syphon structure between this discharge duct (22) and the condensation-water drain (14), the condensed water that high-temp waste gas process main heat exchanger (26) carries out after the heat exchange flows into this condensed water receiving tube (10), it is characterized in that: in the condensed water receiving tube (10) of this syphon structure, be provided with the waste gas choke apparatus, it is in the centre of the condensed water receiving tube (10) of syphon structure datum level film (16a) to be set, its middle part is bent downwardly, the central authorities of datum level film (16a) are provided with the condensing drip hole (16b) of running through datum level film (16a), top at condensing drip hole (16b), the condensed water ball sealer (18) of big buoyancy is set, with the residual water level of benchmark (L) is the center, with condensed water and condensed water ball sealer (18) sealing condensing drip hole (16b).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR199925254 | 1999-11-17 | ||
KR2019990025254U KR200176948Y1 (en) | 1999-11-17 | 1999-11-17 | A shutoff apparatus for exhaust gas of a condensate pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2465105Y true CN2465105Y (en) | 2001-12-12 |
Family
ID=19596867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN00258187U Expired - Lifetime CN2465105Y (en) | 1999-11-17 | 2000-10-18 | Waste gas flow resisting device for condensed water receiving tube of gas boiler |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR200176948Y1 (en) |
CN (1) | CN2465105Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106979618A (en) * | 2017-04-25 | 2017-07-25 | 广东万家乐燃气具有限公司 | A kind of condensed water collecting device with rotary blade |
CN107429943A (en) * | 2015-03-09 | 2017-12-01 | 罗伯特·博世有限公司 | The attachment means that condensate for heater flows out |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101105441B1 (en) * | 2009-11-04 | 2012-01-17 | 포항공과대학교 산학협력단 | A safety valve of low pressure pipeline |
KR101876200B1 (en) * | 2016-11-23 | 2018-07-10 | 린나이코리아 주식회사 | Gas boiler exhaust block equipment |
US11691900B2 (en) | 2017-11-02 | 2023-07-04 | Kyungdong Navien Co., Ltd. | Trap apparatus of condensate water |
WO2019088777A1 (en) * | 2017-11-02 | 2019-05-09 | 주식회사 경동나비엔 | Trap apparatus of condensate water |
-
1999
- 1999-11-17 KR KR2019990025254U patent/KR200176948Y1/en not_active IP Right Cessation
-
2000
- 2000-10-18 CN CN00258187U patent/CN2465105Y/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107429943A (en) * | 2015-03-09 | 2017-12-01 | 罗伯特·博世有限公司 | The attachment means that condensate for heater flows out |
CN107429943B (en) * | 2015-03-09 | 2021-03-16 | 罗伯特·博世有限公司 | Connection for the outflow of condensate from a heater |
CN106979618A (en) * | 2017-04-25 | 2017-07-25 | 广东万家乐燃气具有限公司 | A kind of condensed water collecting device with rotary blade |
Also Published As
Publication number | Publication date |
---|---|
KR200176948Y1 (en) | 2000-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109539851B (en) | Modularized self-adjusting heat pipe flue gas waste heat recovery system | |
CN2465105Y (en) | Waste gas flow resisting device for condensed water receiving tube of gas boiler | |
CN205448326U (en) | Comdenstion water discharging equipment of condensing hanging stove | |
CN101424456B (en) | Subdivision solar water heater | |
CN201277732Y (en) | Solar water heater | |
CN208332243U (en) | A kind of steam boiler power failure automatic water replenishing device | |
CN2460892Y (en) | Condensation water high water-level detector of gas fired-boiler | |
CN211650187U (en) | Energy-saving steam generating device for humidification | |
CN206486921U (en) | A kind of intelligent environmental protection type house water system | |
JPH1163746A (en) | Device for preventing condensation of cooling water in cooling tower | |
CN208154809U (en) | Normal-pressure hot-water boiler direct heating double-water-tank system | |
CN2451897Y (en) | Condensation water level detector for gas-firing boiler | |
WO2009059565A1 (en) | Heating device with directionally-flowing medium | |
CN208108489U (en) | A kind of high efficiency boiler energy-saving control system | |
CN110652843A (en) | Membrane method flue gas moisture recovery system based on siphoning and control method | |
CN207112965U (en) | Provide multiple forms of energy to complement each other heating system | |
CN108361988A (en) | A kind of high efficiency boiler energy-saving control system and control method | |
CN2433470Y (en) | Automatic water-supply controller for water tank | |
CN218645777U (en) | Water-gas separation fume extractor | |
CN219489652U (en) | Heat collecting type household solar heating ultrapure water device | |
CN212362894U (en) | Dry-wet dual-purpose water-saving whitening cooling tower | |
CN219511334U (en) | Pure steam generator waste liquid discharges cooling device | |
CN215490315U (en) | Circulating hot water wall-mounted boiler | |
CN219390565U (en) | Backwater exhaust device of titanium slag electric furnace | |
CN211345871U (en) | Gas boiler smoke box condensate water discharging equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: ZHU QINGDONG NAVIEN CO.,LTD. Free format text: FORMER NAME OR ADDRESS: GYONGDONG BOILER CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: Gyeonggi Do Korea Pyeongtaek, fine Dong 437, zip code: Patentee after: Kyungdong Navien Co., Ltd. Address before: Gyeonggi Do Korea Pyeongtaek, fine Dong 437, zip code: Patentee before: Kyonggan Boiler Co., Ltd. |
|
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |
Expiration termination date: 20101018 Granted publication date: 20011212 |