CN2443994Y - Complex row shape matter for filling sand to construct breaked bank - Google Patents

Complex row shape matter for filling sand to construct breaked bank Download PDF

Info

Publication number
CN2443994Y
CN2443994Y CN 00257594 CN00257594U CN2443994Y CN 2443994 Y CN2443994 Y CN 2443994Y CN 00257594 CN00257594 CN 00257594 CN 00257594 U CN00257594 U CN 00257594U CN 2443994 Y CN2443994 Y CN 2443994Y
Authority
CN
China
Prior art keywords
concrete
bank
compound
sand
filling sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 00257594
Other languages
Chinese (zh)
Inventor
黄永健
孙玉生
高季章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN 00257594 priority Critical patent/CN2443994Y/en
Application granted granted Critical
Publication of CN2443994Y publication Critical patent/CN2443994Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a complex row body for filling sand to construct a broken bank, which mainly comprises interlocking blocks of a reinforced concrete frame and complex soft body rows. A reinforced concrete frame and the precast concrete locking blocks which are inlaid in the reinforced concrete frame are connected into a whole and positioned on a slope surface. The utility model is characterized in that the complex soft body rows are composed of concrete mould bags and frame type mould bags for filling sand, the concrete mould bags and the frame type mould bags for filling sand under the concrete mould bags are connected through anchoring hooks and arranged under the slope surface, and press feet of sandbags are arranged on the bottom surface of the frame type mould bags for filling sand. The structure develops out a successful road for filling sand to construct a broken bank.

Description

Administer compound row's body of collapse on the bank
The utility model relates to the hydraulic engineering bank slide treatment, refers to a kind of compound row's body of the improvement collapse on the bank that compound soft raft and reinforced concrete frame interlocking piece are constituted especially.
The collapse on the bank problem is to perplex dyke construction and safety always; it is a difficult problem extremely to be solved; the scheme that a kind of interlocking concrete slab is protected levee slope is disclosed in the prior art; this interlocking concrete slab; be square hollow-core construction; respectively be provided with lockhole on the frame, the right and left frame bottom is provided with platform, and two frame sides, front and back are the plane; the platform of adjacent two plates is connected with the border side platform; with the locking of frame lockhole, so constitute the embankment protection plane of large-area hard and soft combination by Z-shaped metal hook, it is strong to have resistance to overturning; it is big to adapt to domatic distortion; construction assembling is simple, and the unrestrained effect that disappears is remarkable, is widely used in the water engineering facility such as reservoir dam.The scheme that this interlocking concrete slab is protected levee slope only is a kind of scheme wherein, and limitation is bigger, especially the protection on riverbank, deep water place is had any problem.
The purpose of this utility model is: at the problems referred to above, provide a kind of a large amount of use new material, new technology can effectively be administered collapse on the bank, accelerating construction progress, raising work efficiency, poised river gesture, be cut down compound row's body of the improvement collapse on the bank of flow velocity.
The purpose of this utility model is achieved in that a kind of compound row's body of administering collapse on the bank, comprise that mainly reinforced concrete frame interlocking piece and compound soft raft constitute, reinforced concrete frame and embedding precast concrete lock dog within it be connected to form one be positioned at domatic on, it is characterized in that: above-mentioned compound soft raft is made up of concrete mould bag and sash type mould sack for filling sand two parts, the concrete mould bag with its under sash type mould sack for filling sand by the grappling hook be connected place domatic down, the sandbag presser feet then places on the sash type mould sack for filling sand bottom surface.
The purpose of this utility model also can realize by following measure: above-mentioned reinforced concrete frame interlocking piece by the steel concrete anchoring pile be fixed on domaticly go up, the steel concrete anchoring pile with reinforced concrete frame constitute compound beam with fixing under water compound soft raft and concrete mould bag and precast concrete lock dog under also be provided with weeper drain and geotextiles bed course; Above-mentioned compound soft raft length direction Transverse to the flow direction, the width Parallel to the flow direction; Above-mentioned compound soft raft is sewn into by the high-strength woven cloth of long filament: charged the concrete hard layer in its top concrete mould bag, charged the combined overall structure of sand soft layer in the sash type mould sack for filling sand of bottom; Above-mentioned sash type mould sack for filling sand is sewn into some cell cubes, be provided with some suturing parts in each cell cube, its suturing part periphery charges sand formation and has the sash shape of main rib and auxilliary rib, cut off by the two-sided reinforced bands that is stitched together mutually between above-mentioned each cell cube, a side of its each cell cube is provided with and fills Sha Guankou; Above-mentioned main rib fills the diameter after the auxilliary rib of the big what of diameter behind the sand fills sand.
The utility model has the advantages that: compound soft raft and reinforced concrete frame interlocking piece have constituted the integral framework of administering collapse on the bank, compound soft raft is made by the high-strength woven cloth of long filament and is formed, can directly provide from factory, but so accelerating construction progress, improve work efficiency, fixing superiority such as riverbank, poised river gesture, reduction flow velocity, anti-impact wave resistance, have wide development and application prospect, collapse the road that a success is developed in the improvement of collapsing with bar for administering collapse on the bank, particularly whirlpool.
Now further specify by the following drawings and embodiment:
Fig. 1, be plane structure chart of the present utility model.
Fig. 2, be construction profile of the present utility model.
Fig. 3, be sash type mould sack for filling sand structural representation.
Fig. 4, be the cell cube structural representation among Fig. 3.
Fig. 5, be the A-A sectional view among Fig. 4.
Referring to Fig. 1-2, a kind of compound row's body of administering collapse on the bank, comprise that mainly reinforced concrete frame interlocking piece 1 and compound soft raft 2 constitutes, wherein, reinforced concrete frame 12 and embedding precast concrete lock dog 11 within it be connected to form one be positioned at domatic on; Above-mentioned compound soft raft 2 is made up of concrete mould bag 21 and sash type mould sack for filling sand 22 two parts, concrete mould bag 21 with its under sash type mould sack for filling sand 22 by grappling hook 4 be connected place domatic down, sandbag presser feet 3 then places the bottom of sash type mould sack for filling sand 22, to avoid the mould bag washed away.
Above-mentioned reinforced concrete frame 12 by steel concrete anchoring pile 6 be fixed on domaticly go up, steel concrete anchoring pile 6 constitutes compound beam with fixing compound soft raft 22 under water with reinforced concrete frame 12, and prefabricated interlocking piece also is provided with weeper drain 7 and geotextiles bed course 8 for 11 times, sometimes need in the engineering on domatic, to stack sand filling pipe bag 5 pad slopes, make slope leveling, above-mentioned compound soft raft 2 length direction Transverse to the flow direction (as Fig. 1 direction of arrow indication), the width Parallel to the flow direction.
Referring to Fig. 3-5, above-mentioned compound soft raft 2 is sewn into by the high-strength woven cloth of long filament: charged concrete in its top concrete mould bag 21, become hard layer, charged sand in the bottom sash type mould sack for filling sand 22, become an overall structure of soft layer, on sash type mould sack for filling sand 22, be sewn into some cell cubes 221, be provided with some suturing parts 222 in each cell cube 221, its suturing part 222 peripheries charge sand formation and have the sash shape of main rib 223 and auxilliary rib 224, see it is one and another bulge from integral body, cut off by the two-sided reinforced bands that is stitched together mutually between each cell cube 221, can be divided into vertical insulating course 23 and horizontal insulating course 24, be used to transmit pulling force, select for use the tensile strength of reinforced bands must be high,, be provided with at a side of each cell cube 221 in addition and fill Sha Guankou 9 to adapt to the demand of engineering; And main rib 223 fills the diameter after the auxilliary rib 224 of the big what of diameter behind the sand fills sand.
Compound soft raft 2 has constituted the integral framework of administering collapse on the bank with reinforced concrete frame interlocking piece 1, reinforced concrete frame interlocking piece 1 waterborne and concrete mould bag 21 can prevent current scour, underwater portion sash type mould sack for filling sand 22 can adapt to the bed configuration river bottom protection, waterborne and under water two parts bank protection structure thing rely on mutually and interfix, be a kind of brand-new design concept and construction technology.
Recently, use this scheme improvement collapse on the bank in the Jiang Xinzhou bank slide treatment experimental project of Jiujiang and obtained first-stage success, big landslide takes place at main dike Yongan, the Changjiang river, Jiangxi dike, the compound soft raft that the scheme on improvement landslide is used again in the utility model carries out slope protection works, all obtained good effect, therefore the utlity model has excellent popularization and be worth.

Claims (7)

1, a kind of compound row's body of administering collapse on the bank, comprise that mainly reinforced concrete frame interlocking piece and compound soft raft constitute, reinforced concrete frame and embedding precast concrete lock dog within it be connected to form one be positioned at domatic on, it is characterized in that: above-mentioned compound soft raft is made up of concrete mould bag and sash type mould sack for filling sand two parts, the concrete mould bag with its under sash type mould sack for filling sand by the grappling hook be connected place domatic down, the sandbag presser feet then places forms a rounded system on the sash type mould sack for filling sand bottom surface.
2, compound row's body of improvement collapse on the bank as claimed in claim 1 is characterized in that: above-mentioned reinforced concrete frame interlocking piece by the steel concrete anchoring pile be fixed on domaticly go up, the steel concrete anchoring pile with reinforced concrete frame constitute compound beam with fixing under water compound soft raft and concrete mould bag and precast concrete lock dog under also be provided with weeper drain and geotextiles bed course.
3, compound row's body of improvement collapse on the bank as claimed in claim 1 is characterized in that: above-mentioned compound soft raft length direction Transverse to the flow direction, width Parallel to the flow direction.
4, compound row's body of improvement collapse on the bank as claimed in claim 1, it is characterized in that: above-mentioned compound soft raft is sewn into by the high-strength woven cloth of long filament: charged concrete in its top concrete mould bag and be hard layer, charged sand in the sash type mould sack for filling sand of bottom and be soft layer, the two structure that is combined into one.
5, as compound row's body of claim 1 or 4 described improvement collapses on the bank, it is characterized in that: above-mentioned sash type mould sack for filling sand is sewn into some cell cubes, be provided with some suturing parts in each cell cube, its suturing part periphery charges sand formation and has the sash shape of main rib and auxilliary rib.
6, compound row's body of improvement collapse on the bank as claimed in claim 5, it is characterized in that: cut off by the two-sided reinforced bands that is stitched together mutually between above-mentioned each cell cube, can be divided into vertical insulating course and horizontal insulating course, and be provided with the fixedly draw ring of hawser/round steel in the reinforced bands termination.
7, compound row's body of improvement collapse on the bank as claimed in claim 5 is characterized in that: above-mentioned main rib fills the diameter after the auxilliary rib of the big what of diameter behind the sand fills sand, and a side of its each cell cube is provided with and fills Sha Guankou.
CN 00257594 2000-10-30 2000-10-30 Complex row shape matter for filling sand to construct breaked bank Expired - Lifetime CN2443994Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00257594 CN2443994Y (en) 2000-10-30 2000-10-30 Complex row shape matter for filling sand to construct breaked bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00257594 CN2443994Y (en) 2000-10-30 2000-10-30 Complex row shape matter for filling sand to construct breaked bank

Publications (1)

Publication Number Publication Date
CN2443994Y true CN2443994Y (en) 2001-08-22

Family

ID=33614065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00257594 Expired - Lifetime CN2443994Y (en) 2000-10-30 2000-10-30 Complex row shape matter for filling sand to construct breaked bank

Country Status (1)

Country Link
CN (1) CN2443994Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061679A (en) * 2010-08-16 2011-05-18 章韵英 Assemblable ecological river flood bank
CN102535395A (en) * 2011-12-30 2012-07-04 安徽华艺园林景观生态建设有限公司 Mold bag concrete method for slope protection
CN103966976A (en) * 2014-04-17 2014-08-06 罗晓晖 River levee protecting curtain
CN106049361A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring quilt of riverbed and seabed and construction method thereof
CN106245587A (en) * 2016-09-12 2016-12-21 辽宁省水利水电科学研究院 A kind of bar planting formula concrete revetment mould bag
CN108487191A (en) * 2018-04-27 2018-09-04 河南创辉水利水电工程有限公司 A method of double protection is carried out to river side slope

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061679A (en) * 2010-08-16 2011-05-18 章韵英 Assemblable ecological river flood bank
CN102535395A (en) * 2011-12-30 2012-07-04 安徽华艺园林景观生态建设有限公司 Mold bag concrete method for slope protection
CN103966976A (en) * 2014-04-17 2014-08-06 罗晓晖 River levee protecting curtain
CN106049361A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring quilt of riverbed and seabed and construction method thereof
CN106245587A (en) * 2016-09-12 2016-12-21 辽宁省水利水电科学研究院 A kind of bar planting formula concrete revetment mould bag
CN108487191A (en) * 2018-04-27 2018-09-04 河南创辉水利水电工程有限公司 A method of double protection is carried out to river side slope

Similar Documents

Publication Publication Date Title
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
CN2443994Y (en) Complex row shape matter for filling sand to construct breaked bank
CN108867552A (en) A kind of riverbank peg board revetment structure and revetment method
CN108677925A (en) Half coercion underground continuous wall structure and its construction method
CN201506969U (en) Large-diameter dyke tubular pile and dyke or wharf structure thereof
CN213805480U (en) Gabion retaining wall
CN215165198U (en) A banket structure that is used for regional embankment cofferdam of strong tidal bore
CN113373865B (en) Frame type embankment structure
CN101514554A (en) Flexible structure cofferdam
CN202064318U (en) Cage body
CN106149624A (en) A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof
CN211898208U (en) Impact-resistant deep tooth wall of river damming weir
CN210507492U (en) Cofferdam structure
CN106836130A (en) A kind of dykes and dams based on junked tire inrush and block up multiple construction method
CN112878274A (en) Modular bank slope protective structure
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN215887944U (en) Island platform is built in advancing of deep water high flow velocity river course embankment
CN105256783B (en) Stacked assembly type guide pier structure
CN216973485U (en) Grid lacing wire belt formula geotechnique check room barricade
CN214143525U (en) Embankment ballast
CN2443995Y (en) Complex geotechnical textile soft row shape matter for filling sand
CN216379405U (en) Flood control structure of river course
CN219793969U (en) Film bag sand composite cofferdam structure
CN218263736U (en) Dyke slope ecological management composite assembly type interlocking cage
CN214530486U (en) Dyke heightening and reinforcing structure based on hydraulic design

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20101030

Granted publication date: 20010822