CN2426495Y - Building member for shoal - Google Patents

Building member for shoal Download PDF

Info

Publication number
CN2426495Y
CN2426495Y CN 00215001 CN00215001U CN2426495Y CN 2426495 Y CN2426495 Y CN 2426495Y CN 00215001 CN00215001 CN 00215001 CN 00215001 U CN00215001 U CN 00215001U CN 2426495 Y CN2426495 Y CN 2426495Y
Authority
CN
China
Prior art keywords
plate
stake
linking
linking body
shoal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 00215001
Other languages
Chinese (zh)
Inventor
陈泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00215001 priority Critical patent/CN2426495Y/en
Application granted granted Critical
Publication of CN2426495Y publication Critical patent/CN2426495Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a building member for a shoal for construction in water. The building member for a shoal for construction in water comprises two groups of pile plate connecting bodies, wherein, the plate bodies of which are parallel. A positioning beam composed of a main beam and positioning plates on both sides of the main beam is arranged above the pile plate connecting bodies. The two positioning plates of each positioning beam are positioned on the outer sides of the plate bodies of the two groups of pile plate connecting bodies. The utility model has the advantages of engineering amount reduction, construction speed enhancement and construction cost reduction. In addition, the positioning beam can ensure that the pile plate connecting bodies can not expand outwards or can not sink due to water flow. Thereby, the utility model has the characteristics of simple structure, convenient installation, and good fixing effect on the pile plate connecting bodies.

Description

The Building for shoal member
The utility model is a kind of Building for shoal member of using when water carries out building operations of being used for.
Area for this class water body of shoal mobile (river or morning and evening tides), to build nonvolatil building thereon, as road or man-made island etc., present engineering method is for being lowered to earlier two campshed plate-linking bodies in water, filling rubble therein again, horizontal then draw reinforcing bar cast-in-situ concrete to bind thereon, thereby its construction trouble comparatively.In addition,, add the effect of current, often cause a plate-linking body to occur crooked or sinking because the phytal zone ground is too soft, thereby to be difficult to Lu Xiuzhi.Because construction weight limits, above method can not be used in the bigger area of the depth of water simultaneously.
The purpose of this utility model is: the Building for shoal member that designs a kind of simple in structure, easy for installation and good fixing effect.
The utility model comprises two groups of stake plate-linking bodies that plate body is parallel, and stake plate-linking body top is equipped with the positioning beam of being made up of the location-plate of girder and its both sides, and two location-plates of each positioning beam are positioned at the plate body outside of two groups of stake plate-linking bodies.
The technical solution of the utility model at first is by prefabricated positioning beam two groups of stake plate-linking bodies to be located, and needn't carry out on-the-spot horizontal process of drawing reinforcing bar again, can significantly reduce engineering quantity like this, improve speed of application, and its construction cost reduces greatly; And positioning beam can also guarantee that a plate-linking body is not understood and outer open or sink because of current.Thereby the utlity model has simple in structure, easy for installation, to the characteristics of stake plate-linking body good fixing effect.
Positioning beam of the present utility model be installed in every group of stake plate-linking body in adjacent two plate-linking bodies seam crossing or be installed in and stake plate-linking body and corresponding position on.In the previous case, location-plate is not had specific (special) requirements, its end face can be rectangle; Under latter event, to have on the location-plate and the position of stake, the groove that size adapts to, and make the top of stake be arranged in groove; Perhaps make between a upper surface of plate-linking body stake and its plate body and form groove, the girder of positioning beam is arranged in groove.
For increasing the road surface elevation or the utility model can being suitable for, one group of corresponding with it baffle plate of increasing can be arranged above every group of stake plate-linking body plate body in deep water.
In addition, the inboard crimping baffle plate of at least one group of stake plate-linking body plate body, the crimping baffle plate is made up of the evagination crimping of its plate body and its upper end, and its evagination crimping is positioned at the plate body top of a plate-linking body, increases the length of baffle plate and the spacing of adjacent two positioning beam girders and adapts.
When the water in building site was dark, for ease of construction, the length of the plate body of stake plate-linking body can reduce, and left certain interval between adjacent two plate bodys in every group of stake plate-linking body, was installing the width crimping baffle plate corresponding with the gap additional with these corresponding positions, gap; Each crimping baffle plate is made up of the evagination crimping of its plate body and plate body upper end, and its evagination crimping is positioned on the upper surface of plate-linking body plate body.After the crimping baffle plate is installed, also can above stake plate-linking body and crimping baffle plate, installs and increase baffle plate to adapt to construction requirement.
In addition, the utility model also can be following form: every group of stake plate-linking body is made up of the inboard stake plate-linking body and the outside stake plate-linking body of being separated by one by one, the plate body of the stake plate-linking body of its inboard is square, the top of outside stake plate-linking body is side-prominent to two, its ledge is folded mutually with the plate body of inboard stake plate-linking body, and the location-plate of each positioning beam is positioned at the outside of outside stake plate-linking body.In this case, also can above every group of stake plate-linking body plate body, install and increase baffle plate, increase the length of baffle plate and the spacing of adjacent two positioning beam girders and adapt according to the construction needs.
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated.
The side view of Fig. 1 the utility model embodiment one;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the side view of embodiment two;
Fig. 4 is the B-B view of Fig. 3;
Fig. 5 is the side view of embodiment three;
Fig. 6 is the C-C view of Fig. 5;
Fig. 7 is the side view of embodiment four;
Fig. 8 is the D-D view of Fig. 7;
Wherein, 1-stake plate-linking body, the 2-stake, the 3-positioning beam, the 4-girder, the 5-location-plate, 6-increases baffle plate, 7-crimping baffle plate, 8-guide pile plate-linking body.
Embodiment one:
As shown in the figure, present embodiment comprises two groups of stake plate-linking bodies 1, and every group of interior stake plate-linking body 1 is arranged side by side, and the interstitial site correspondence of two groups of stake plate-linking body 1 each adjacent plate bodys is equipped with a positioning beam 3 above every pair of gap.Each positioning beam 3 comprises its girder 4 and is positioned at the location-plate 5 that girder 4 two ends and and bottom vertical with the length direction of girder 4 protrude in girder 4, and the cross section of girder 4 is rectangle, and location-plate 5 is positioned at the plate body outside of a plate-linking body 1.On the girder 4 hole for hoist is arranged.
Embodiment two:
As shown in the figure, present embodiment comprises two groups of stake plate-linking bodies 1, and its shape, structure are identical with embodiment one, no longer repeats here.There is a positioning beam 3 to be installed on the top of a plate-linking body 1 with corresponding position, two groups of stake plate-linking bodies, 1 every pair of stake 2 position.Each positioning beam 3 by its girder 4 be connected with girder 4 two ends and two location-plates 5 vertical with girder 4 length directions are formed.Location-plate 5 protrudes in girder 4 downwards, and has on its ledge and the corresponding groove of stake 2 width, and two location-plates 5 are positioned at the plate body outside of a plate-linking body 1, and stake 2 is arranged in the groove of location-plate 5.Above every group of stake plate-linking body 1, also be equipped with and move towards identical one group with its plate and increase baffle plate 6, increase on the baffle plate 6 and be shaped on hole for hoist.
Embodiment three:
As shown in the figure, present embodiment by two groups of stake plate-linking bodies 1, positioning beam 3, increase baffle plate 6 and crimping baffle plate 7 is formed, remove in every group of stake plate-linking body 1 and leave at interval between the neighboring board body.The crimping baffle plate 7 of present embodiment is made of the evagination crimping of its plate body and its upper top, the length of its plate body is slightly larger than the interval of adjacent studs plate-linking body 1 plate body and is installed in the inboard of each group stake plate-linking body 1 plate body corresponding with interval location, and its evagination crimping is positioned at the plate body top of its both sides stake plate-linking body 1.The positioning beam 3 of present embodiment is corresponding with the position of 12 of plate-linking body of stake, and location-plate 5 shapes of its both sides and identical with embodiment two with the combination of a plate-linking body 1 repeat no more here.Above crimping baffle plate 7 and stake plate-linking body 1 baffle plate of increasing 6 is arranged, its length is consistent with the spacing of the girder 4 of adjacent two positioning beam 3.
Embodiment four:
As shown in the figure, present embodiment is made up of two groups of stake plate-linking bodies, positioning beam 3.Wherein every group of stake plate-linking body formed by being positioned at the inboard stake plate-linking body 1 and the guide pile plate-linking body 8 in the outside.Wherein, inboard stake plate-linking body 1 its plate body is a rectangle.And the top of the both sides of guide pile plate-linking body 8 its plate bodys is outstanding to its length direction, and the position of its upper end is low than the upper surface of plate body, thereby forms groove.The ledge of guide pile plate-linking body 8 its plate bodys is overlapping with the plate body of inboard stake plate-linking body 1, and the girder 4 of the positioning beam 3 of present embodiment is arranged in the last groove of guide pile plate-linking body 8.

Claims (9)

1, a kind of Building for shoal member, comprise two groups of stake plate-linking bodies (1) that plate body is staggered relatively, it is characterized in that: stake plate-linking body (1) top is equipped with the positioning beam of being made up of the location-plate (5) of its girder (4) and two its both sides (3), and two location-plates (5) of each positioning beam (3) are positioned at the plate body outside of two groups of stake plate-linking bodies (1).
2, Building for shoal member according to claim 1 is characterized in that: said positioning beam (3) is arranged in the seam crossing of every group of adjacent two plate-linking bodies of stake plate-linking body (1).
3, Building for shoal member according to claim 1, it is characterized in that: the position of the stake (2) in said positioning beam (3) and stake plate-linking body (1) is corresponding, have on the location-plate (5) and the position of stake (2), the groove that size adapts to, the top of stake (2) is arranged in groove.
4, Building for shoal member according to claim 1, it is characterized in that: the position of the stake (2) in said positioning beam (3) and stake plate-linking body (1) is corresponding, the upper surface of stake plate-linking body (1) stake (2) and its plate body form groove, and the girder (4) of positioning beam (3) is arranged in groove.
5, according to claim 1 or 2 or 3 or 4 described Building for shoal members, it is characterized in that: there is one group of corresponding with it baffle plate (6) of increasing the top of every group of stake plate-linking body (1) plate body, and increases the length of baffle plate (6) and the spacing of adjacent two positioning beam (3) girders (4) and adapts.
6, according to claim 1 or 2 or 3 or 4 described Building for shoal members, it is characterized in that: there is the crimping baffle plate (7) corresponding with the gap of adjacent two plate bodys the inboard of each group stake plate-linking body plate body (1), crimping baffle plate (7) is made up of the evagination crimping of its plate body and its upper end, and its evagination crimping is positioned at the plate body top of a plate-linking body (1).
7, Building for shoal member according to claim 6 is characterized in that: the top of every group of stake plate-linking body (1) has one group to increase baffle plate (6), and the evagination crimping of crimping baffle plate (7) is positioned to be increased between baffle plate (6) and the stake plate-linking body (1).
8, according to claim 1 or 3 or 4 described Building for shoal members, it is characterized in that: every group of stake plate-linking body (1) is made up of the inboard stake plate-linking body (1) of being separated by one by one and the guide pile plate-linking body (8) in the outside, the plate body of the stake plate-linking body (1) of its inboard is square, the top of guide pile plate-linking body (8) is side-prominent to two, its ledge is folded mutually with the plate body of inboard stake plate-linking body (1), and the location-plate (5) of each positioning beam (3) is positioned at the outside of guide pile plate-linking body (8).
9, Building for shoal member according to claim 8 is characterized in that: there is one group of corresponding with it baffle plate (6) of increasing the top of every group of stake plate-linking body (1) plate body, and increases the length of baffle plate (6) and the spacing of adjacent two positioning beam (3) girders (4) and adapts.
CN 00215001 2000-06-05 2000-06-05 Building member for shoal Expired - Lifetime CN2426495Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00215001 CN2426495Y (en) 2000-06-05 2000-06-05 Building member for shoal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00215001 CN2426495Y (en) 2000-06-05 2000-06-05 Building member for shoal

Publications (1)

Publication Number Publication Date
CN2426495Y true CN2426495Y (en) 2001-04-11

Family

ID=33581020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00215001 Expired - Lifetime CN2426495Y (en) 2000-06-05 2000-06-05 Building member for shoal

Country Status (1)

Country Link
CN (1) CN2426495Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296564A (en) * 2011-06-13 2011-12-28 张康德 Method for treating drifting of sandbars
CN102728980A (en) * 2012-07-05 2012-10-17 南通中远船务工程有限公司 Method for limiting and positioning octagonal spud leg in folding process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296564A (en) * 2011-06-13 2011-12-28 张康德 Method for treating drifting of sandbars
CN102728980A (en) * 2012-07-05 2012-10-17 南通中远船务工程有限公司 Method for limiting and positioning octagonal spud leg in folding process
CN102728980B (en) * 2012-07-05 2014-12-10 南通中远船务工程有限公司 Method for limiting and positioning octagonal spud leg in folding process

Similar Documents

Publication Publication Date Title
CN209989835U (en) Along river curb prestressed anchorage cable sheet-pile wall
CN204753354U (en) Cover worker's board landing stage
CN2426495Y (en) Building member for shoal
CN219653488U (en) Pile plate retaining wall and abutment co-building structure
CN214695427U (en) Novel prefabricated close-packed sheet pile revetment
CN214530142U (en) Assembled hydrophilic pavement
CN2325424Y (en) Equipment for anti-earthquake for building
CN2612724Y (en) Wide width wing opening locking H-shaped steel
CN210597365U (en) Assembled strip lattice type retaining wall
CN2412925Y (en) Dike-closing and dam-building member for irrigation works
KR100531214B1 (en) Construction method composed of sheet piles and wales for the circular temporary work area of the open cassion
CN2769319Y (en) Concrete seepage road
CN1043482C (en) Retaining wall structure and method for constructing same
CN2580001Y (en) Prestress concrete wild goose shape plate
CN2769352Y (en) Pipeline tunnel covering plate
CN2362921Y (en) Shoal built wall
CN217204236U (en) Even arch form assembled ecological retaining wall structure
CN219080212U (en) Inland river bank protection structure at pipeline crossing position
CN220847688U (en) Assembled steel retaining wall
CN216787170U (en) Supporting construction with lean on formula barricade and anchor rope lattice roof beam
CN218291553U (en) Steel structure bridge
CN112523168A (en) Novel prefabricated close-packed sheet pile revetment and construction method thereof
CN212641217U (en) Support system for asymmetric installation of steel box short-tower cable-stayed bridge
CN217949823U (en) Protective shed frame device for crossing existing railway on expressway
CN218711903U (en) Road structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Granted publication date: 20010411