CN2403489Y - Dust control desulfurizing purifying apparatus for smoke dust gas of boiler - Google Patents

Dust control desulfurizing purifying apparatus for smoke dust gas of boiler Download PDF

Info

Publication number
CN2403489Y
CN2403489Y CN 99259104 CN99259104U CN2403489Y CN 2403489 Y CN2403489 Y CN 2403489Y CN 99259104 CN99259104 CN 99259104 CN 99259104 U CN99259104 U CN 99259104U CN 2403489 Y CN2403489 Y CN 2403489Y
Authority
CN
China
Prior art keywords
tower
king
smoke gas
dust
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99259104
Other languages
Chinese (zh)
Inventor
李少峰
喻万钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99259104 priority Critical patent/CN2403489Y/en
Application granted granted Critical
Publication of CN2403489Y publication Critical patent/CN2403489Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model provides a dust removal desulphurization purification apparatus for the smoke gas of a boiler, and belongs to a dust removal desulphurization purification device for smoke gas discharged from industry and families. The utility model is characterized in that a smoke gas inlet is arranged on the upper part of a main tower, and the inlet extends into the upper part along the tangent direction. A purified liquid cylinder body is also arranged on the main tower, the purified liquid cylinder body comprises at least one venturi, a purification inlet pipe, a liquid discharging pipe, a level gauge and a ball float valve, and a vibrating motor and a conveyor are also arranged on the lower part of the main tower. The utility model can be used as a purification device for removing and desulfurizing smoke gas discharged by industrial and civil boilers; the utility model can be widely used for the purification of boilers used in restaurants, factories and mines, organs, schools, etc., and has the advantage of environmental protection.

Description

Boiler smoke gas dust-removal and desulfurizing purifier
The utility model provides a kind of boiler smoke gas dust-removal and desulfurizing purifier, relates to industry and civil boiler dust dust-removal and desulfurizing cleaning equipment.
Existing industry and civil boiler (fire coal, fuel oil) high-temperature smoke gas is after wet dedusting desulfurization is handled, and desulfuration efficiency reaches 80-85%, and about 50 ℃ of discharge temperature does not reach 70 ℃ discharge standard.Because boiler furnace is little negative pressure operation, general industry and civil boiler heat loss due to exhaust gas size directly influence the completing combustion of coal-fired (oil), and increase the loss of coal-fired (oil), increase the consumption of energy.Low excessively as exhaust temperature, also can be directed at sour corrosion, the lifting of influence height.How to improve boiler smoke qi exhaustion sulphur efficiency, improving the exhaust emissions temperature is the technical problem of being badly in need of solution behind current fire coal (oil) the boiler smoke gas dust-removal and desulfurizing.
The purpose of this utility model is exactly for the efficient that improves boiler smoke gas dust-removal and desulfurizing and exhaust emissions temperature and a kind of boiler smoke gas dust-removal and desulfurizing purifier that designs.
The utlity model has king-tower and attached tower, king-tower and attached tower are by the flange bolt sealed attachment, and described king-tower I is provided with dust import a, and this dust import a is that tangent line enters; Described king-tower I also is provided with scavenging solution cylindrical shell m, and this scavenging solution cylindrical shell m comprises at least one Venturi tube 1, purified gas inlet tube 7, discharging tube 8, liquid level gauge 9 and float-controlled valve 10.Discharge elbow 5 and the tube connector 6 that separates barrier 4 and connect attached tower II is housed at the top of king-tower I.Be provided with vibrating motor 2 and conveying worm 3 in the bottom of king-tower I.The lower end of described attached tower II is equipped with residual cake valve 11.Described Venturi tube 1 can have a plurality of.
The utility model adopts master, attached tower and a plurality of Venturi tube can make full use of the temperature effect of high-temperature smoke gas, and the Venturi tube circulation mixes purification and exhaust effect, and the high-temperature tail gas after the purification discharges can be stabilized in 70 ℃.The thermal property of boiler little negative pressure operation can the change greatly boiler increases the power of tail gas and buoyancy, is beneficial to atmospheric turbulance diffusion dilution and self-cleaning; Its efficiency of dust collection can reach 99%, and desulfuration efficiency can reach 90% and improve the environment protection standard rate.
Now described in conjunction with the accompanying drawings.
Fig. 1 is the utility model structural plan figure.
Fig. 2 is along the vertical perspective view of A-A section among Fig. 1.
As shown in the figure, high temperature (500-600 ℃) dust of discharging from boiler (contains grit and SO 2), through the dust import a on king-tower I top eddy flow, flow to Venturi tube 1 downwards, flow velocity increases when dust enters collapsible tube, enters trunnion 12 speed and reaches maximum, forms negative pressure at trunnion 12 places, some apertures are arranged at the top outside the trunnion 12 at Venturi tube 1 place, make to purify emulsion by entering Venturi tube 1 interior circulation outward automatically, diffusion is wetting rapidly to make grit, and cohesion decline is deposited in king-tower I bottom and discharges through conveying worm 3.SO in the high-temperature smoke 2H is combined in the water vapour absorption that pernicious gas also is cleaned in cyclic process in the emulsion 2SO 4Thimerosal, its dedusting particle diameter can reach 0.05-100m.Purified gas rises through purified gas outlet b backhaul behind the high-temperature smoke heat of the intermediate conduit absorption portion on king-tower I top, enter attached tower II through separation barrier 4 by discharge elbow 5 and tube connector 6 and carry out double purification, enter atmosphere through the air-introduced machine chimney again, so can improve exhaust temperature and tail gas lifting temperature.
When the concentration that purifies emulsion reaches pH value 9-12, can reduce the surface tension of scavenging solution and the interfacial tension between the flue dust, make that wettability and emulsifiability improve between dust grit and the scavenging solution, accelerate the purification on solution-air surface and gas-solid surface and assembled, thereby reached the effect of desulfurization and dedusting.When the pH value that purifies emulsion<9, float-controlled valve 10 is in time opened automatically, replenishes liquid level and also keeps scavenging solution concentration that pH value is stabilized between the 9-12.
Also be provided with 2 vibrating motors 2 in the bottom of king-tower I, the control Timing vibration prevents dirt slag caking, makes the dirt slag can pass through conveying worm 3 smooth and easy discharges.

Claims (4)

1. a boiler smoke gas dedusting separation of flow purifier has king-tower and attached tower, and king-tower and attached tower be is characterized in that by the flange bolt sealed attachment described king-tower I is provided with dust import a, and this dust import a is that tangent line enters; Described king-tower I also is provided with scavenging solution cylindrical shell m, and this scavenging solution cylindrical shell m comprises at least one Venturi tube 1, purified gas inlet tube 7, discharging tube 8, liquid level gauge 9 and float-controlled valve 10.
2. according to the described boiler smoke gas of claim 1 dedusting separation of flow purifier, it is characterized in that, the discharge elbow 5 and the tube connector 6 that separate barrier 4 and connect attached tower II are installed at king-tower I top.
3. according to the described boiler smoke gas of claim 1 dedusting separation of flow purifier, it is characterized in that, be provided with vibrating motor 2 and conveying worm 3 in king-tower I bottom.
4. according to the described boiler smoke gas of claim 1 dust-removal and desulfurizing purifier, it is characterized in that described Venturi tube 1 can have a plurality of.
CN 99259104 1999-12-31 1999-12-31 Dust control desulfurizing purifying apparatus for smoke dust gas of boiler Expired - Fee Related CN2403489Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99259104 CN2403489Y (en) 1999-12-31 1999-12-31 Dust control desulfurizing purifying apparatus for smoke dust gas of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99259104 CN2403489Y (en) 1999-12-31 1999-12-31 Dust control desulfurizing purifying apparatus for smoke dust gas of boiler

Publications (1)

Publication Number Publication Date
CN2403489Y true CN2403489Y (en) 2000-11-01

Family

ID=34041516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99259104 Expired - Fee Related CN2403489Y (en) 1999-12-31 1999-12-31 Dust control desulfurizing purifying apparatus for smoke dust gas of boiler

Country Status (1)

Country Link
CN (1) CN2403489Y (en)

Similar Documents

Publication Publication Date Title
CN108554158A (en) A kind of high temperature and humidity flue gas cool-down desulfurizing and purifying system
CN2784762Y (en) Flue-gas desulfurization device for thermal power plant
CN101157007A (en) Whirling particle synthesis desulfurating dust collector
CN107998865A (en) A kind of flue-gas dust-removing and desulfurization cleaning system
CN2925586Y (en) Efficient energy-saving desulfurizing dust collector
CN2403489Y (en) Dust control desulfurizing purifying apparatus for smoke dust gas of boiler
CN201342305Y (en) Powerful atomizing treatment equipment for boiler smoke desulphurization
CN105299674B (en) A kind of Multifunctional smoke energy-saving and emission-reduction system
CN2436218Y (en) Boiler waste gas dust-remover
CN2160452Y (en) Device for dusting, desulfurizing and denitrifying
CN2289596Y (en) High-efficiency dust-rmeoval desulfurization device for boiler smoke
CN2232795Y (en) Desulfurizing dust remover
CN207024935U (en) A kind of foam desulfurization dust-removal system
CN2557209Y (en) High-efficient desulfurizing dust remover
CN2405120Y (en) Apparatus for dust-removing and desulfurization from boiler smoke
CN201055749Y (en) Water immersion type flue gas dust wiper
CN201441873U (en) High-efficiency energy-saving emission-reducing dust precipitator
CN2779257Y (en) Twin-rotor gas cleaner by wet method
CN2235314Y (en) Jetting and bubbling equipment for desulphurizing and dust removing
CN208449036U (en) A kind of desulfurating dust removing device for flue gas
CN2758603Y (en) Sierra wet desulfurizing duster
CN2331853Y (en) Circulation flue gas cleaning device
CN211384408U (en) Spiral-flow type water film desulfurization dust collecting equipment
CN1061430C (en) Technical apparatus of smoke preventing and dust controlling, desulfurizing and denitrifying for coal-burning boiler and furnace
CN107126808A (en) A kind of foam desulfurization dust-removal system and dust removal method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Li Shaofeng

Document name: Notice of termination

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee