CN2381697Y - Blocks made from sludge and solidifying materials - Google Patents
Blocks made from sludge and solidifying materials Download PDFInfo
- Publication number
- CN2381697Y CN2381697Y CN 98241330 CN98241330U CN2381697Y CN 2381697 Y CN2381697 Y CN 2381697Y CN 98241330 CN98241330 CN 98241330 CN 98241330 U CN98241330 U CN 98241330U CN 2381697 Y CN2381697 Y CN 2381697Y
- Authority
- CN
- China
- Prior art keywords
- weight portion
- box
- building block
- plate
- cover plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a boxed building block made of sludge and solidified materials, which is composed of a box (1) and a building block (2) installed in the box, wherein the box (1) is composed of a base plate, a side plate, a cover plate, a connection side plate, rotary sheets on the cover plate, a suspension loop on the side plate and hooks on the cover plate. Holes are formed on the base plate, the side plate and the cover plate; a building block (2) is formed by the solidification of the solidified materials and the sludge which are mixed and injected into the box (1), and the solidified materials are composed of portland cement clinker, ferric aluminate clinker, gypsum, quick lime, slag, aromatic sulfonates aldehyde condensation substances, calcium chloride and sodium tripolyphosphate powder materials. The utility model can be used for cofferdams and slope protection of roads with submerged beaches.
Description
The utility model relates to a kind of box-packed building block made from mud and curing materials, is used for beach apron water channel road bank protection and cofferdam.
The method of repairing the roads behind the first cofferdam is mainly adopted on the existing apron water channel road, beach of building, and adopts cofferdam water retaining, and backfill airing soil on roadbed is used cement bonded sand stone masonry bank protection then.When running into big tidewater, the cofferdam of usually destroying by rush of water.The engineering cost height, speed of application is slow, and cement mortar is subjected to seawater to do wet immersion effect, easily produces chemical erosion, causes the cement mortar cracking, and stone-laying comes off, and subgrade soils is washed in a pan empty, influences the stability of road.
The purpose of this utility model is to avoid above-mentioned weak point of the prior art and provides a kind of with water construction, box-packed building block that cost of raw and processed materials is low, construction technology is simple, speed of application is fast makes with mud and curing materials.
The purpose of this utility model can reach by following measure.
Box-packed building block made from mud and curing materials of the present utility model comprises box 1, building block 2 in box 1, it is characterized in that box 1 comprises base plate 3, side plate 4, cover plate 5, the revolving fragment 6 that connects side plate 4 and cover plate 5, link 7 on side plate 4, hook 8 on cover plate 5, at base plate 3, side plate 4, all has hole 9 on the cover plate 5, the aperture is 1~5mm, pitch of holes is 10~50mm, be filled with building block 2 at hole 9, building block 2 is the mud by water content 35~150%, refetch 1 weight portion by dried mud, the curing material that adds 0.05~0.3 weight portion is again puddled the back and is solidified and form, and this curing material is by 1 weight portion Portland clinker, 1~5 weight portion ferrous aluminate cement grog, 1.5~3 weight portion gypsum, 1~2 weight portion quicklime, 0.5~1.5 weight portion slags, 0.005~0.02 weight portion aromatic sulphonate aldehydes condensation product, 0.01~0.05 weight portion calcium chloride, 0.005~0.01 weight portion sodium phosphate trimer, its powder material is mixed.
Box 1 is a cuboid preferably, base plate 3, side plate 4, the thick 2mm plastic plate of cover plate 5 usefulness is made, base plate 3 is a rectangle, long 800mm, wide 450mm, side plate 4 high 200mm, cover plate 5 is identical with base plate 3 shape and size, building block 2 is the mud by water content 40%, get 1 weight portion by dried mud weight, add to solidify after 0.1 weight portion curing material is puddled and form, this curing material is by 1 weight portion Portland clinker, 4 weight portion ferrous aluminate cement grogs, 2.5 weight portion gypsum, 1.5 weight portion quicklime, 1 weight portion slag, 0.007 weight portion aromatic series naphthalenesulfonate formaldehyde condensation compound, 0.01 weight portion calcium chloride, 0.005 the weight portion sodium phosphate trimer mixes its powder raw material.
Box-packed building block of making of the present utility model with mud and curing materials, manufacture process is as follows: mud and curing material are puddled back injection box 1, close cover plate 5, lock with link 7, hook 8, hole 9 at box 1 has partially mixed thing to ooze out, and treats that certain hour solidifies the back and forms box-packed building block.Base plate 3, side plate 4 can adopt press forming, become one, and side plate 3 is decided according to base plate 4 shapes, when being cuboid as box 1, side plate 4 has 4, and cover plate 5 can be opened and closed by revolving fragment 6, at injection mud with after solidifying the material mixture cover plate 5 is locked by link 7 and hook 8.The shape of base plate 3 is decided according to the construction needs, can adopt rectangle, square, regular hexagon or circle.Box 1 can be made with polyolefin panels such as porous polyethylene, polypropylene, polyester sheet, porous sheeting.When using the box 1 of porous sheeting, after the mixed back thing of mud and curing material of packing into, need put into other forming model moulding, treat to slough model behind the curing molding.
Below in conjunction with description of drawings the utility model.
Fig. 1 is the stereogram of the box-packed building block made from mud and curing materials;
Fig. 2 is the stereogram of box 1 when opening;
Among the figure: 1-box; 2-building block; 3-base plate; 4-side plate; 5-cover plate; 6-revolving fragment; 7-link; 8-hook; 9-hole.
Embodiment 1
The utility model is used for apron water channel road, beach bank protection
Adopt 2mm thick polyethylene plastic plate to make box 1, box 1 is cuboid, and base plate 3 is a rectangle, long 800mm, wide 450mm, side plate 4 high 200mm, cover plate 5 sizes, shape are identical with base plate 3, on base plate 3, side plate 4, cover plate 5, hole is arranged, aperture 1~5mm, pitch of holes 10~50mm.The mud water content is 40% by weight, get a weight portion by dried mud weight, add 0.1 weight portion and solidify the material mixture, this solidifies the material mixture by 1 weight portion Portland clinker, 4 weight portion ferrous aluminate cement grogs, 2.5 the weight portion gypsum, 1.5 weight portion quicklimes, 1 weight portion slag, 0.007 weight portion aromatic series naphthalenesulfonate formaldehyde condensation compound, 0.01 weight portion calcium chloride, 0.005 weight portion sodium phosphate trimer mixes its powder stock.Mud and curing material mixture are puddled in the back injection box 1, had spiece to ooze out, stick on box 1 external surface after the curing, the bonding when helping to build by laying bricks or stones at box 1 hole 9.It is 0.5MPa that the mixture of this mud and curing material is puddled back 12 hours compressive strength, and 1 day compressive strength is 3MPa, and 7 days compressive strength is 5MPa.
When the slope protection construction of apron water channel road, beach, use mortar walling on bank protection box-packed building block of making of the present utility model with mud and curing materials.
The utility model compared with prior art has the following advantages:
1, adopts on-the-spot mud to add a small amount of material that solidifies and make box-packed building block, be used for beach apron water The water construction can be with in road bank protection or cofferdam, and construction technology is simple, and speed of application is fast.
2, anti-water erosion is good, and the strength of materials is higher.
3, greatly reduce engineering cost.
Claims (2)
1, a kind of box-packed building block made from mud and curing materials, comprise box (1), building block (2) in box (1), it is characterized in that box (1) comprises base plate (3), side plate (4), cover plate (5), the revolving fragment (6) that connects side plate (4) and cover plate (5), link (7) on side plate (4), hook (8) on cover plate (5), in base plate (3), side plate (4), all has hole (9) on the cover plate (5), the aperture is 1~5mm, pitch of holes is 10~50mm, be filled with building block (2) at hole (9), building block (2) is the mud by water content 35~150%, refetch 1 weight portion by dried mud, the curing material that adds 0.05~0.3 weight portion is again puddled the back and is solidified and form, and this curing material is by 1 weight portion Portland clinker, 1~5 weight portion ferrous aluminate cement grog, 1.5~3 weight portion gypsum, 1~2 weight portion quicklime, 0.5~1.5 weight portion slags, 0.005~0.02 weight portion aromatic sulphonate aldehydes condensation product, 0.01~0.05 weight portion calcium chloride, 0.005~0.01 weight portion sodium phosphate trimer, its powder material is mixed.
2, a kind of box-packed building block of making as claimed in claim 1 with mud and curing materials, it is characterized in that box 1 is cuboid, base plate (3), side plate (4), cover plate (5) is made with the thick plastic plate of 2mm, base plate (3) is a rectangle, long 800mm, wide 450mm, the high 200mm of side plate (4), cover plate (5) is identical with base plate (3) shape and size, building block (2) is the mud by water content 40%, get 1 weight portion by dried mud weight, add to solidify after 0.1 weight portion curing material is puddled and form, this curing material is by 1 weight portion Portland clinker, 4 weight portion ferrous aluminate cement grogs, 2.5 weight portion gypsum, 1.5 weight portion quicklime, 1 weight portion slag, 0.007 weight portion aromatic series naphthalenesulfonate formaldehyde condensation compound, 0.01 weight portion calcium chloride, 0.005 the weight portion sodium phosphate trimer mixes its powder raw material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98241330 CN2381697Y (en) | 1998-10-14 | 1998-10-14 | Blocks made from sludge and solidifying materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98241330 CN2381697Y (en) | 1998-10-14 | 1998-10-14 | Blocks made from sludge and solidifying materials |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2381697Y true CN2381697Y (en) | 2000-06-07 |
Family
ID=33988109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98241330 Expired - Fee Related CN2381697Y (en) | 1998-10-14 | 1998-10-14 | Blocks made from sludge and solidifying materials |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2381697Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102344813A (en) * | 2011-07-18 | 2012-02-08 | 徐辰楚 | Curing agent for curing marine poor subsoil |
CN102503295A (en) * | 2011-10-12 | 2012-06-20 | 无锡晨驰江河科技有限公司 | Non-sintered brick prepared from river and lake silt and preparation process thereof |
CN102765906A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method for producing aerated hollow bricks by fluorite slag |
CN102765908A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method capable of utilizing mine tailings to produce aerated hollow brick |
CN102765907A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method capable of utilizing blast-furnace slag to produce aerated hollow brick |
-
1998
- 1998-10-14 CN CN 98241330 patent/CN2381697Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102344813A (en) * | 2011-07-18 | 2012-02-08 | 徐辰楚 | Curing agent for curing marine poor subsoil |
CN102344813B (en) * | 2011-07-18 | 2014-04-02 | 徐辰楚 | Curing agent for curing marine poor subsoil |
CN102503295A (en) * | 2011-10-12 | 2012-06-20 | 无锡晨驰江河科技有限公司 | Non-sintered brick prepared from river and lake silt and preparation process thereof |
CN102503295B (en) * | 2011-10-12 | 2014-02-05 | 无锡晨驰江河科技有限公司 | Non-sintered brick prepared from river and lake silt and preparation process thereof |
CN102765906A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method for producing aerated hollow bricks by fluorite slag |
CN102765908A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method capable of utilizing mine tailings to produce aerated hollow brick |
CN102765907A (en) * | 2012-06-30 | 2012-11-07 | 安徽中龙建材科技有限公司 | Method capable of utilizing blast-furnace slag to produce aerated hollow brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1561733A1 (en) | Construction material based upon a sludge or sludged waste material | |
CN1315752C (en) | High-strength water-permeable concrete floor brick and its production method | |
CN2876152Y (en) | High strength water permeable concrete ground brick | |
CN101684038A (en) | Curing agent and construction method of weak soil | |
CN1670313A (en) | Canal system earth solidification agent and its production method | |
KR20100123930A (en) | Eco underground pile and wall | |
CN101602567A (en) | Waste mud solidification processing method based on polypropylene acetamide | |
CN102976677A (en) | Dredged soil composite curing agent and engineering building material | |
CN110330272A (en) | A kind of solidification regeneration product process of construction slurry | |
CN100448790C (en) | Constructional material curing agent and its application in constructional material | |
JPH06200249A (en) | Solidifying material containing stone powder and method of construction using solidifying material containing stone powder | |
CN2381697Y (en) | Blocks made from sludge and solidifying materials | |
CN112745098B (en) | Original shield muck baking-free pavement brick and preparation method thereof | |
JP2000157094A (en) | Stone material for sinking and disposing in water and its production | |
CN109704690A (en) | A kind of concrete and its construction method inhibiting frozen swell and melt settlement | |
Hurley et al. | Sodium silicate stabilization of soils: A review of the literature | |
CN216765450U (en) | Solidified salted red clay roadbed structure | |
CN111908853A (en) | Self-compacting soil, preparation method thereof and construction method for backfilling municipal cavity | |
CN1629092A (en) | Braking free and steaming free environmental protection brick and its preparing process | |
CN109440756A (en) | Reinforcement module pressure-bearing pile body combination curing interlayer composite foundation structure processing method is placed in backfill | |
CN210421151U (en) | Prefabricated assembled solidified sludge retaining wall | |
KR101183187B1 (en) | Combined paving method | |
CN2466286Y (en) | Pump house made of waste drilling mud and curing material | |
JP3875962B2 (en) | Revetment or retaining wall using artificial granular material and porous concrete block | |
JP2002115204A (en) | Manufacturing method for permeable concrete block using molten slag of general waste |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |