CN2354996Y - Hammer for piling process - Google Patents

Hammer for piling process Download PDF

Info

Publication number
CN2354996Y
CN2354996Y CN 99200138 CN99200138U CN2354996Y CN 2354996 Y CN2354996 Y CN 2354996Y CN 99200138 CN99200138 CN 99200138 CN 99200138 U CN99200138 U CN 99200138U CN 2354996 Y CN2354996 Y CN 2354996Y
Authority
CN
China
Prior art keywords
hammer
mentioned
ramming
groove
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99200138
Other languages
Chinese (zh)
Inventor
王继忠
杨秋新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99200138 priority Critical patent/CN2354996Y/en
Application granted granted Critical
Publication of CN2354996Y publication Critical patent/CN2354996Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model aims to provide a tamping hammer for piling construction. When the tamping hammer is lifted up, the generation of negative pressure states at the bottom surface of the hammer can be avoided, which prevent the phenomenon of pipe reduction from producing. The tamping hammer whose inner part is provided with an air exhaust passage (8) comprises a hammer body. One end of the air exhaust passage is communicated with an air outlet (7) that is arranged on the hammer body, and the other end is communicated with a recess (9) that is arranged on the bottom part of the hammer body. The inner part of the recess is provided with an air exhaust plate (5) which is supported in the resess (9) of the hammer body in an elastic mode.

Description

The tumping rummer that bore forming is used
The present invention relates to field of civil engineering, relate in particular to the construction equipment of stake.
In the past, ground for the soil body of moisture content less, no matter be the tumping rummer that adopts compacting pile construction to use, still its bottom has the working tumping rummer of cast-in-place concrete pile that rams enlarged footing, occasion at the impact holing that does not use sleeve pipe to carry out, when tumping rummer being promoted at every turn, bottom surface at tumping rummer can form negative pressure, promptly be in vacuum state, thereby the foundation soil of vicinity, tumping rummer bottom surface is known from experience along with proposing on the above-mentioned tumping rummer upward suction, be easy to like this produce the undergauge phenomenon, thereby influence the efficiency of construction and the quality of pore-forming.
The tumping rummer that provides a kind of bore forming to use is provided the purpose of this utility model, and it can be avoided in the impact holing process, produces negative pressure in the bottom surface when last carrying, thereby prevents the undergauge phenomenon.
Above-mentioned purpose of the present utility model is to realize by the tumping rummer that the bore forming of following structure is used, this tumping rummer comprises hammer body, this hammer body inside offers the exhaust passage, the exhaust opening of offering on one end of this exhaust passage and the hammer body is communicated with, the groove of offering on its other end and the hammer body bottom is communicated with, be provided with exhaustion plate in this groove, this exhaustion plate is supported in the groove of hammer body with elastic type.
In above-mentioned tumping rummer, between above-mentioned exhaustion plate and above-mentioned groove floor, be fixed with compression spring, so that when carrying hammer, this exhaustion plate is extruded.
In above-mentioned tumping rummer, above-mentioned exhaustion plate end face is fixed with bar, and this bar extends to along the steam vent in the hammer body in the chamber that is arranged in the hammer body, and the top of this bar is fixed with catch, be provided with compression spring between the surface in this catch and above-mentioned chamber, this spring encapsulation is on this bar.
In above-mentioned tumping rummer, it comprises the parts of ramming that are positioned at the bottom, this end face of ramming parts is along being vertically fixed with the positioning and fixing bar, near this ram parts above be stacked with the removable hammer piece of ramming, this is rammed in the hammer piece and offers through hole, by this through hole, this is rammed the hammer piece and is placed on the above-mentioned positioning and fixing bar, is stacked with standard hammer piece on this rams the hammer piece, offers through hole in this standard hammer piece, by this through hole, this standard hammer piece is placed on the above-mentioned positioning and fixing bar.
In above-mentioned tumping rummer, it is stacked with a plurality of standard hammer pieces above-mentioned ramming along the vertical direction above hammer piece, and these hammer pieces are all offered through hole, and by this through hole, these standard hammer pieces are placed on the above-mentioned positioning and fixing bar.
In above-mentioned tumping rummer, the external surface of above-mentioned positioning and fixing bar offers screw thread, is fixed with the nut of twisting on this positioning and fixing bar on the standard hammer piece at top.
In above-mentioned tumping rummer, above-mentioned exhaust passage is formed at the inside of above-mentioned positioning and fixing bar, offer groove in the above-mentioned bottom of ramming parts, one end of above-mentioned exhaust passage is communicated with this groove, the other end of this exhaust passage is communicated with the exhaust opening that is arranged at above-mentioned positioning and fixing masthead end, above-mentioned exhaustion plate embeds in the above-mentioned groove of ramming in the parts, between the end face of this plate and the above-mentioned groove floor compression spring is set.
In above-mentioned tumping rummer, it is for ramming the hammer of usefulness to cast-in-place concrete pile end ground stabilization material.
In above-mentioned tumping rummer, its for the filler in the compaction pile hole is rammed so that form the hammer of ramming that compaction pile uses.
The advantage of the tumping rummer that bore forming of the present utility model is used is that this tumping rummer inside is formed with the exhaust passage that is communicated with atmosphere, the bottom of this exhaust passage is communicated with the hammer bottom, when hammer is mentioned, exhaustion plate ejects downwards under pressure, thereby the hammer bottom space is communicated with atmosphere, can't form vacuum state, can avoid like this foundation soil body is picked up, produce the unfavorable phenomenon of stake hole undergauge.
With reference to the accompanying drawings, the tumping rummer of bore forming of the present utility model being used by the mode of embodiment specifically describes.
The elevational schematic view of the tumping rummer that Fig. 1 uses for bore forming of the present utility model;
Fig. 2 is the enlarged diagram of ramming parts in the tumping rummer shown in Figure 1.
As shown in Figure 1, the tumping rummer of using as the bore forming of an embodiment of the present utility model comprises rams parts 4, it is taper, promptly up big and down small, become overall fixed that positioning and fixing bar 3 is arranged at this central part of ramming the end face of parts 4, it extends along vertical, this bar 3 is a hollow stem, have exhaust passage 8 in it, this is rammed to be stacked with above the parts 4 and rams hammer piece 1, offer through hole in the middle of it, thereby it is set on the above-mentioned positioning and fixing bar 3, hammers piece 2a into shape along being stacked with a plurality of standards up and down on ram hammer piece 1,2b, 2c, 2d, 2e, the pars intermedia of these standard hammer pieces equally also offers through hole, thereby these standard hammer pieces are set on the above-mentioned positioning and fixing bar 3, and folded putting down together, the external surface of above-mentioned positioning and fixing bar 3 is threaded, like this by nut 6 being tightened against the top of above-mentioned positioning and fixing bar 3, just above-mentioned parts can be fixed together, and assembling forms tumping rummer.As shown in Figure 2, the above-mentioned bottom of ramming parts 4 offers groove 9, is provided with exhaustion plate 5 in it, is fixed with compression spring 10 between the bottom surface of the end face of exhaustion plate 5 and groove 9.The bottom of the exhaust passage 8 in the above-mentioned positioning and fixing bar 3 is communicated with above-mentioned groove 9, and its top is communicated with the exhaust opening 7 at positioning and fixing bar 3 tops.
Be provided with spring 10 and exhaustion plate 5 owing to ram the bottom of parts 4, be provided with the exhaust passage 8 that is communicated with groove 9 in addition in the positioning and fixing bar 3, like this in the process of carrying out impact holing, when mentioning tumping rummer, exhaustion plate 5 extrudes downwards under the elastic force effect of spring 10, thereby make the tumping rummer bottom surface keep being communicated with, and (vacuum) state that do not form negative pressure can avoid putting forward the undergauge phenomenon that causes when hammering into shape like this with atmosphere.
During fabrication, can only make ramming of a plurality of different-diameters and hammer piece 1 into shape, just can satisfy the construction requirement in piles with different footpath, thereby can obtain the tumping rummer of different-diameter by only changing the mode of fewer parts (ramming the hammer piece).In addition, also can the change standard quantity of hammer piece, the weight of tumping rummer is changed, so that increase or reduce the impact energy of ramming the ground stabilization material.

Claims (9)

1. tumping rummer that bore forming is used, it comprises hammer body, it is characterized in that this hammer body inside offers the exhaust passage, the exhaust opening of offering on one end of this exhaust passage and the hammer body is communicated with, the groove of offering on its other end and the hammer body bottom is communicated with, be provided with exhaustion plate in this groove, this exhaustion plate is supported in the groove of hammer body with elastic type.
2. tumping rummer according to claim 1 is characterized in that being fixed with compression spring between above-mentioned exhaustion plate and above-mentioned groove floor, so that when carrying hammer this exhaustion plate is extruded.
3. tumping rummer according to claim 1, it is characterized in that above-mentioned exhaustion plate end face is fixed with bar, this bar extends in the chamber that is arranged in the hammer body along the steam vent in the hammer body, the top of this bar is fixed with catch, be provided with compression spring between the surface in this catch and above-mentioned chamber, this spring encapsulation is on this bar.
4. tumping rummer according to claim 1, it is characterized in that it comprises the parts of ramming that are positioned at the bottom, this end face of ramming parts is along being vertically fixed with the positioning and fixing bar, near this ram parts above be stacked with the removable hammer piece of ramming, this is rammed in the hammer piece and offers through hole, by this through hole, this is rammed the hammer piece and is placed on the above-mentioned positioning and fixing bar, on ramming the hammer piece, this is stacked with standard hammer piece, offer through hole in this standard hammer piece, by this through hole, this standard hammer piece is placed on the above-mentioned positioning and fixing bar.
5. tumping rummer according to claim 4 is characterized in that along the vertical direction being stacked with a plurality of hammer pieces above-mentioned above ramming the hammer piece, and these hammer pieces are all offered through hole, and by this through hole, these standards hammer pieces are placed on the above-mentioned positioning and fixing bar.
6. according to claim 4 or 5 described tumping rummers, it is characterized in that the external surface of above-mentioned positioning and fixing bar offers screw thread, on the standard hammer piece at top, be fixed with the nut of twisting on this positioning and fixing bar.
7. according to claim 4 or 5 described tumping rummers, it is characterized in that above-mentioned exhaust passage is formed at the inside of above-mentioned positioning and fixing bar, offer groove in the above-mentioned bottom of ramming parts, one end of above-mentioned exhaust passage is communicated with this groove, the other end of this exhaust passage is communicated with the exhaust opening that is arranged at above-mentioned positioning and fixing masthead end, above-mentioned exhaustion plate embeds in the above-mentioned groove of ramming in the parts, between the end face of this plate and the above-mentioned groove floor compression spring is set.
8. tumping rummer according to claim 1 is characterized in that it is a hammer of cast-in-place concrete pile end ground stabilization material being rammed usefulness.
9. tumping rummer according to claim 1 is characterized in that it is that the filler in the compaction pile hole is rammed so that form the hammer of ramming that compaction pile uses.
CN 99200138 1999-01-06 1999-01-06 Hammer for piling process Expired - Fee Related CN2354996Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99200138 CN2354996Y (en) 1999-01-06 1999-01-06 Hammer for piling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99200138 CN2354996Y (en) 1999-01-06 1999-01-06 Hammer for piling process

Publications (1)

Publication Number Publication Date
CN2354996Y true CN2354996Y (en) 1999-12-22

Family

ID=33996180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99200138 Expired - Fee Related CN2354996Y (en) 1999-01-06 1999-01-06 Hammer for piling process

Country Status (1)

Country Link
CN (1) CN2354996Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094420A (en) * 2011-03-02 2011-06-15 翟宇思 Construction device for rammed bulb pile and construction method using device
CN102797248A (en) * 2012-08-31 2012-11-28 机械工业勘察设计研究院 Soil moisture meter embedding device and embedding method
CN111893983A (en) * 2020-07-31 2020-11-06 西安卧龙网络科技有限公司 Self-cleaning formula damping engineering tamping equipment
CN112502128A (en) * 2020-12-30 2021-03-16 梁会鑫 Rammer capable of automatically dredging air vent
CN112502127A (en) * 2020-12-30 2021-03-16 梁会鑫 Rammer for foundation construction

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094420A (en) * 2011-03-02 2011-06-15 翟宇思 Construction device for rammed bulb pile and construction method using device
CN102094420B (en) * 2011-03-02 2012-10-17 翟宇思 Construction device for rammed bulb pile and construction method using device
CN102797248A (en) * 2012-08-31 2012-11-28 机械工业勘察设计研究院 Soil moisture meter embedding device and embedding method
CN102797248B (en) * 2012-08-31 2014-06-11 机械工业勘察设计研究院 Soil moisture meter embedding device and embedding method
CN111893983A (en) * 2020-07-31 2020-11-06 西安卧龙网络科技有限公司 Self-cleaning formula damping engineering tamping equipment
CN112502128A (en) * 2020-12-30 2021-03-16 梁会鑫 Rammer capable of automatically dredging air vent
CN112502127A (en) * 2020-12-30 2021-03-16 梁会鑫 Rammer for foundation construction

Similar Documents

Publication Publication Date Title
US20060147274A1 (en) Construction process for composite pile foundation
CN100485134C (en) Construction technique for holding type PHC tube pile with tip entering into rock by augering technique
CN2354996Y (en) Hammer for piling process
CN106320318B (en) waist discharging vibroflotation equipment and pile making method thereof
CN201581394U (en) Large pile toe grout-injection precast pile
CN2354995Y (en) Hammer for piling process
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN2828142Y (en) Wolf tooth bar building pile
CN201065530Y (en) Tapered macrocephalic rod-type hammer
CN213358613U (en) Pulling device for steel pipe slope protection pile
CN213682097U (en) Civil engineering is with small-size building pile driver
CN209556925U (en) The outer pipe device of hammer in a kind of
CN206902686U (en) A kind of dynamic compaction machinery of soil-stone embankment
CN2148096Y (en) Pounder for ground stabilization
CN220768008U (en) Impact hammer for SDDC method
CN215948185U (en) Hole guiding device of foundation construction piling equipment
CN201080607Y (en) Open type head-forging pipe pile
CN201891115U (en) Three-point continuous screw pile foundation
CN218263851U (en) Pile sinking pipe with wide-diameter storage
CN218263867U (en) Multifunctional column hammer structure
CN219280414U (en) Rammer of dynamic compactor
CN219825251U (en) Tubular pile hammering construction auxiliary device
CN109853533A (en) The construction method of static-pressure expanding bottom pile
CN2151175Y (en) Tamper for ground base
CN219705041U (en) Pre-buried hole of rack support column strikes head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee