CN2333937Y - Accumulating auxiliary unit of air conditioner - Google Patents
Accumulating auxiliary unit of air conditioner Download PDFInfo
- Publication number
- CN2333937Y CN2333937Y CN98220400U CN98220400U CN2333937Y CN 2333937 Y CN2333937 Y CN 2333937Y CN 98220400 U CN98220400 U CN 98220400U CN 98220400 U CN98220400 U CN 98220400U CN 2333937 Y CN2333937 Y CN 2333937Y
- Authority
- CN
- China
- Prior art keywords
- utility
- air conditioner
- model
- energy
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Other Air-Conditioning Systems (AREA)
Abstract
The utility model relates to an accumulating auxiliary unit of an air conditioner, which has the technical proposal that a coil pipe blower is connected with an energy accumulating device in a housing. The utility model combined with a refrigerant evaporator is arranged between a capillary of the air conditioner and an air evaporator. The utility model can supply cold and heat via energy accumulating when the main air conditioner not works, so the utility model can satisfy requirements of users for adjusting refrigeration load as well as electricity peak and valley utilization. The utility model makes full use of energy source and economic operation to enhance utilization rate and performance of an air conditioner. Besides, the utility model has the advantages of simple structure and easy application.
Description
The utility model relates to a kind of idle call auxiliary equipment, can carry out energy storage.
Along with expanding economy, living standards of the people improve constantly, and various household appliances enter common people house successively, and especially, in recent years, large-scale household electrical appliances such as air conditioner entered family and become a reality, and this just makes the peak valley contradiction of power supply more outstanding.But existing household appliances such as air conditioner can not be adjusted this situation of adaptation voluntarily, and when needing to enable often, air conditioner exactly can not start because of the electric power situation, has brought inconvenience to use.If can be according to the peak and the low ebb of electricity consumption, make the air conditioner can accumulation of energy, then can regulate the cooling load of air conditioner, satisfy the facility that the user enables at any time, that will improve the utilization rate and the serviceability of air conditioner.
The purpose of this utility model just provides energy-storage type air-conditioning subsidiary engine a kind of simple in structure, easy to implement, is installed on to satisfy the requirement that the user adjusts air conditioner refrigeration load and electric power electricity using at the peak time on the air conditioner.
Energy-storage type air-conditioning subsidiary engine of the present utility model, its major technique characteristics are to link to each other with an energy storage equipment at a housing inner coil pipe blower fan.
Described energy storage equipment is a heat exchanger, and heat exchanger is two parts, and a part is the medium medium, and a part is the accumulation of energy medium.The medium medium brings the accumulation of energy medium cold or heat energy, stores, and constantly discharges fan.The version that can finish this function of exchange has multiple, passes from the accumulation of energy container as the medium pipe, and the curved shape of medium pipe, tabular or aliform etc. are the accumulation of energy media around the medium pipe; The cavity that the medium passage forms after also can being isolated by the accumulation of energy medium constitutes, and forms the form that the medium medium surrounds the accumulation of energy medium.Energy storage equipment is connected by the medium pipe with the coil pipe blower fan.
Can have pipeline in addition on the tube connector between above-mentioned coil pipe blower fan and energy storage equipment (medium pipe), on tube connector and the pipeline valve is installed, on the medium pipeline pump is installed.Be convenient to increase the quantity of coil pipe blower fan, or be independent of the coil pipe blower fan energy storage equipment is carried out accumulation of energy etc.
The above energy storage equipment or (with) coil pipe blower fan place also can be added with electric heater.
Heat-insulation layer is arranged in the housing, also storeroom can be arranged on the housing, make the utility model form a storage cabinet.
The utility model is installed on the air-conditioning, by cooperating with other device, can carry out energy storage, and does not influence the original performance and the use of air-conditioning.
Below in conjunction with accompanying drawing the utility model and use thereof are described:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 carries out the structural representation of accumulation of energy for the utility model;
Fig. 3 is the flow chart of the utility model at air conditioner;
Fig. 4 forms the structured flowchart of storage cabinet for the utility model.
Fig. 1-4 all is embodiment with the refrigeration.
Among the figure: 1 housing, 2 refrigerant pipes, 3 electric heaters, 4,5,12,14,15,16 valves, 6 blower fans, 7 pumps, 8 accumulation of energy WATER AS FLOW MEDIUM, 9 pipelines, 10 refrigerant evaporators, 11 refrigerating chambers, 13 refrigerant return pipes, 17 heat-insulation layers, 18 energy storage equipments
As shown in Figure 2, refrigerant evaporator 10 is installed between air conditioner capillary and air evaporator, the import and export of the passage and the refrigerant of air-conditioning refrigerant are arranged respectively on the refrigerant evaporator, and the import and export of refrigerant connect energy storage equipment successively by refrigerant pipe (medium pipe) 2 and the coil pipe blower fan constitutes circulation.Energy storage equipment is that refrigerant pipe 2 passes from the cold-storage container, is accumulation of energy WATER AS FLOW MEDIUM 8 around the curved shape of refrigerant pipe (as shown in Figure 1), refrigerant pipe.
Cold-producing medium in the refrigerant evaporator 10 is the same in existing air conditioner, constitutes circulation in process of refrigerastion, and refrigerant medium ethylene glycol brings accumulation of energy WATER AS FLOW MEDIUM 8 in the energy storage equipment with cold energy, and water absorption cold energy becomes ice cold energy is stored.The surplus cold of ethylene glycol can further discharge by coil pipe blower fan 6, and ethylene glycol is got back to refrigerant evaporator at last and formed circulation.In this circulation, shut off valve 12, valve 14, can form a kind of refrigeration cycle that is independent of refrigerant evaporator, provide power by pump 7, when having realized that air-conditioner host does not move, air conditioner can discharge accumulation of energy and keep as usual refrigeration, thereby the user's time that can enable air-conditioner host according to electric power peak valley and peak valley price difference.The user also can increase pipeline 9 and valve as required, increases the quantity (as Fig. 2) of coil pipe blower fan, and the distribution situation of adjustable disc manage-style machine is adjusted cooling load, adjusts refrigeration and distributes, or form the accumulation of energy circulation that is independent of the coil pipe blower fan.Also can utilize accumulation of energy to do other purposes, as chilled goods etc., as shown in Figure 4.
Shut off valve 5 also can carry out cold-storage to energy storage equipment by refrigerant evaporator, forms the accumulation of energy circulation that is independent of the coil pipe blower fan.
Shut off valve 14, refrigerant do not flow, and refrigerant evaporator is only done pipeline and used, and is the same with former air conditioner.
The process of heating is the inverse process of process of refrigerastion, when air-conditioning heats, utilizes the utility model to realize the accumulation of heat heating equally, simultaneously energy storage equipment or (with) coil pipe blower fan place can be added with electric heater, during in order to warming by air conditioner, solves the problem of accumulation of energy medium heat quantity not sufficient.When heating, on the coil pipe blower fan, add filtering evaporator, can play air filtration and humidification function.
Advantage of the present utility model:
The utility model is used for air conditioner and can be made into the air conditioner with accumulation of energy function, and the user can enable according to demand, satisfies and uses The requirement that the family is adjusted cooling load and electric power electricity using at the peak time takes full advantage of the energy, and economical operation improves the profit of air conditioner With rate and serviceability. It is simple in structure, and is easy to implement.
Claims (7)
1, a kind of energy-storage type air-conditioning subsidiary engine is characterized in that linking to each other with an energy storage equipment at a housing (1) inner coil pipe blower fan (6).
2, air-conditioning subsidiary engine according to claim 1 is characterised in that described energy storage equipment is a heat exchanger.
3, air-conditioning subsidiary engine according to claim 2 is characterised in that described heat exchanger is two parts, and a part is the medium medium, and a part is the accumulation of energy medium.
4, air-conditioning subsidiary engine according to claim 1 is characterised in that to have pipeline (9) on the tube connector between coil pipe blower fan and energy storage equipment in addition, on tube connector and the pipeline valve is installed, and pump (7) is installed on the medium pipeline.
5, air-conditioning subsidiary engine according to claim 1, be characterised in that energy storage equipment or (with) coil pipe blower fan place is added with electric heater (3).
6, air-conditioning subsidiary engine according to claim 1, being characterised in that has heat-insulation layer (17) in the housing.
7, air-conditioning subsidiary engine according to claim 1, being characterised in that to add on the housing has storeroom (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN98220400U CN2333937Y (en) | 1998-02-26 | 1998-02-26 | Accumulating auxiliary unit of air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN98220400U CN2333937Y (en) | 1998-02-26 | 1998-02-26 | Accumulating auxiliary unit of air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2333937Y true CN2333937Y (en) | 1999-08-18 |
Family
ID=33972203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN98220400U Expired - Fee Related CN2333937Y (en) | 1998-02-26 | 1998-02-26 | Accumulating auxiliary unit of air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2333937Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105716280A (en) * | 2015-07-21 | 2016-06-29 | 张卫军 | Dual-purpose box capable of storing and converting energy during off-peak electricity consumption period |
-
1998
- 1998-02-26 CN CN98220400U patent/CN2333937Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105716280A (en) * | 2015-07-21 | 2016-06-29 | 张卫军 | Dual-purpose box capable of storing and converting energy during off-peak electricity consumption period |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101655281B (en) | Heat pump hot water air conditioning unit and working method thereof | |
CN205351809U (en) | Changes in temperature circulation system for house | |
CN103629859B (en) | Three-in-one air conditioner | |
CN103759352A (en) | Heat pump and solar energy comprehensively utilized phase change energy storage system | |
CN201377933Y (en) | Heat pump hot water air conditioning unit | |
CN2333937Y (en) | Accumulating auxiliary unit of air conditioner | |
CN2716713Y (en) | Water heater utilizing heat energy of air conditioner | |
CN2333952Y (en) | Accumulating air conditioner and its energy-storage device | |
CN2362024Y (en) | Integrated refrigerating installation for refrigerator and air conditioner | |
CN2245744Y (en) | Cold accumulating air conditioner | |
CN202350266U (en) | Low-carbon air conditioning refrigeration and hot water device | |
CN102759219A (en) | Energy-saving heat pump hot water air conditioner and working method thereof | |
CN2330924Y (en) | Air conditioning equipment | |
CN2929590Y (en) | Air cool heat pump air conditioning system | |
CN201191050Y (en) | Four-pump heat pump and hot water three-purpose central air-conditioning apparatus | |
CN101235993A (en) | Four pipe heating pump, hot water three-purpose central air-conditioning system | |
CN2604649Y (en) | Domestic small central air conditioner | |
CN2615557Y (en) | Air conditioner apparatus for cooling, warming and hot water supply | |
CN205664584U (en) | Cold heat energy -saving recovery system | |
CN104949247A (en) | Movable phase-change air conditioner with cold storage function and heat storage function | |
CN115143553B (en) | Regulation and control method of small direct expansion type phase change cold storage air conditioner | |
CN2515581Y (en) | Cold-heat split air conditioner | |
CN2578754Y (en) | Heat absorbing cabinet as thermal source | |
CN2750231Y (en) | Energy-saving environmental protection cabinet air-conditioner hot-water machine | |
CN2363251Y (en) | Domestic cooling/heating apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |