CN2320660Y - Dyke core stone structure for engineering - Google Patents

Dyke core stone structure for engineering Download PDF

Info

Publication number
CN2320660Y
CN2320660Y CN 97228569 CN97228569U CN2320660Y CN 2320660 Y CN2320660 Y CN 2320660Y CN 97228569 CN97228569 CN 97228569 CN 97228569 U CN97228569 U CN 97228569U CN 2320660 Y CN2320660 Y CN 2320660Y
Authority
CN
China
Prior art keywords
box culvert
engineering
discarded object
stone structure
waterstop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97228569
Other languages
Chinese (zh)
Inventor
李荣昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97228569 priority Critical patent/CN2320660Y/en
Application granted granted Critical
Publication of CN2320660Y publication Critical patent/CN2320660Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a dyke core stone structure for engineering, particularly a dyke core stone structure which is suitable for dikes, sea dikes, road beds and other engineering construction materials. Ordinary granular domestic waste, industrial waste, sludge, etc. are arranged in a precast concrete box culvert directly by the operation of solidifying agents after sorted, broken, mixed, compressed and recrushed. Exposed colloidal water stop ties are embedded in the periphery of the box culvert opening, and can be embedded and combined into integration completely when concrete is cast and capped.

Description

The dyke core stone structure that a kind of engineering is used
The utility model relates to dyke core stone structure that a kind of engineering uses and refers to especially a kind ofly be set as very succinctly, extremely easy to use, can make the processing of general discarded object not only be able to effective solution, reaches certain effect of improving environmental issue.Simultaneously, more causing discarded object has the regeneration effect, builds the material use and be suitable for the public journey of general river levee, sea wall and roadbed.
Even during engineerings such as general construction river levee, river levee sea reclamation, littoral except outer most edge is furnished with Wave-dissipating block, around this dike be all be coated with big and small stone as the dike heart, cause the engineering of construction to have more steadiness and safety; When construction transportation system was desired at comparatively soft geology place, on the whole the construction of its roadbed also was to be equipped with various big and small stones, made the firm effect of row; Undeniable, be to plant the mode of stone that directly cover as the dike heart and abundant roadbed, the intensity that can cause the construction engineering really reaches the required target of expection, even and be the most general modes of engineering application such as present construction river levee, river levee sea reclamation, roadbed paving, yet, these are in the mode of stone as the dike heart and roadbed, no doubt has usefulness, but its grade non-inexhaustible, use not to the utmost, especially, for scheme convenient with make profit What is more in non-minery a large amount of illegal mining sand, stone, and then the heavy damage ecological environment is even jeopardize region security.When the every major works of construction, under the prerequisite that does not influence the engineering quality, the use amount of stone is effectively reduced, be that current utmost point desire is paid attention to and the problem of thinking in fact.
Again, general family discarded object, cause discarded object and mud .... the mode that the like waste is handled, nothing more than being with incineration or burying, though and these modes have seasonable effect, but if deal with improperly, desire very easily to cause various environmental protection fights or secondary pollution problem on the practice, how to make the processing of discarded object open an approach more, improving environmental issue, is as the nearly task of top priority.
The utility model purpose, the dyke core stone structure that provides a kind of engineering to use is provided, wherein, this discarded object is gone through classification, broken, stir, high pressure compressed and after fragmentation is graininess again, can see through the running of curing compound, and in the cemented strong concrete box culvert that is incorporated into a precasting, and be to preset one and expose suitable high colloid waterstop around this box culvert mouth to bury shape underground, after then implementing concrete casting and adding a cover packing, the discarded object of the latent fully envelope of this quilt not only can with the concrete box culvert shape that is combined into one, use as dike cardiolith material, especially, this box culvert mouth, the place, Yi Sheng crack of lid new-old concrete handing-over more can connect airtight by waterstop, and reach the effect that anti-sealing liquid infiltrates and discarded object exosmoses really.
Another purpose of the present utility model, the dyke core stone structure that provides a kind of engineering to use is provided, wherein, this family's discarded object of mat, the cause discarded object, mud .... the like waste, going through every classification, broken, stir, high pressure compressed is high density and after fragmentation is graininess etc. and handles again, be to cooperate by the running of curing compound, and be combined into one with the reinforced concrete box culvert of a precasting, and after adding a cover, this box culvert discarded object can be given latent fully envelope again, and the dike cardiolith material of using as engineering is used, then not only having on the implementation and handle the effect that discarded object improves environmental issue, simultaneously, also is to have the purpose of killing two birds with one stone that makes castoff regenerative utilize effect.
Of the present utility modelly advance a purpose, be to provide a kind of be set as very succinct, extremely easy to use, can make the processing of general discarded object not only be able to effective solution, reach certain effect of improving environmental issue, simultaneously, more causing discarded object has the regeneration effect, and the utmost point is suitable for general river levee, river levee and subgrade construction and builds material and use.
The dyke core stone structure that provides a kind of engineering to use is provided the technical solution of the utility model, it is characterized in that: be provided with one and cast the reinforced concrete box culvert of setting size in advance, around the box culvert mouth is to be equipped with a colloid waterstop that exposes to bury the shape ring underground, in box culvert be filled with go through classification, stirring, high pressure compressed be high density and again fragmentation be graininess, and again by the discarded object of the cemented shape that is combined into one of curing compound, and box culvert mouth position, the surface of the discarded object after curing, other is covered with the reinforced concrete earth mulch, and waterstop is that rank is established and connected airtight in each other.
The technical solution of the utility model also is to provide the section of this colloid waterstop, is that a plurality of clip flanges are preset in planning.
The utility model compared with the prior art advantage and good effect is very obvious, advantage of the present utility model as shown from the above technical solution is: by the above-mentioned the utility model dike cardiolith that constitutes, because this goes through the useless thing that fills after every processing and the high pressure compressed, directly forming integrated with the box culvert 10 (contain and cover 13) of steel concrete combines, and cause integral intensity, weight all can reach the setting value of the general stone that matches in excellence or beauty, then not only can directly replace general construction river levee on the implementation, the stone that the sea wall dike heart and abundant roadbed are used, simultaneously, more can use some discarded objects of digestion, and reach the purpose of killing two birds with one stone that environmental protection and economy can be taken into account.
And have that the utmost point accords with that general construction river is smooth, the usefulness of dealing with problems of engineering such as sea wall or roadbed and offal treatment running actual needs provides, though it is complicated, loaded down with trivial details that its device, structure do not seem, so, the dark well-off specifics of executing of whole running imagination, and be the utilization that present homotype product is not seen.
The dyke core stone structure of a kind of engineering of the utility model being used by most preferred embodiment is elaborated with reference to the accompanying drawings.
In the accompanying drawing:
Fig. 1 is the cross-sectional schematic that the utility model box culvert and discarded object are combined into one.
Fig. 2 is the cross-sectional schematic that the utility model box culvert is added a cover.
At first, see also shown in Fig. 1,2, clear demonstration, the dyke core stone structure that a kind of engineering of the utility model is used comprises the box culvert 10 of casting preliminary dimension, it is to constitute with concrete that this box culvert 10 removes, and be laid with the reinforcing bar 101 of predetermined quantity, be combined into high strength all around, and around the box culvert mouth of upper end, especially be equipped with one and expose suitable high colloid waterstop 11 to bury the shape ring underground, and the reinforcing bar 101 around this and be to expose with suitable height equally; In addition, be to be filled with to go through the discarded object 12 that high pressure compressed is handled in box culvert 10, and this discarded object 12 is general family discarded object, cause discarded object and mud ... wait and go through classification, fragmentation, stirring, height and take compression by force and be high density and (promptly be compressed into the density that is about 0.8-1.2, density greater than seawater) and after fragmentation is graininess again, see through the curing compound running again and the cemented box culvert 10 that is incorporated into, and make mutual formation integrated; Again, after discarded object 12 solidified, 10 places were laid with reinforcing bar 102 in addition at the box culvert mouth, and these reinforcing bars 102 and be with box culvert 10 around the reinforcing bar 101 that exposes interconnect and set firmly, can implement to add a cover 13 to box culvert mouth 10 with concrete again, and give the latent fully envelope of row solidifying in interior discarded object 12; Wherein, because aforementioned box culvert mouth 10 waterstop 11 all around that is embedded in advance exposes with suitable high shape, so when concrete is implemented as cover 13, these waterstops that expose 11 are located between box culvert mouth and the lid from can directly holding in the mouth, make general concrete new, Yi Sheng crack, old junction, easily infiltrate and cause water liquid, and discarded object 12 is subjected to infiltrate immersion for a long time, give row elimination fully and easily waste liquid is oozed out the shortcoming that produces secondary pollution, especially, utilize the section of this waterstop 11 to preset a plurality of clip flanges 111, then these waterstop 11 integral intensity not only can be used reinforcement and improve really, simultaneously, more can use and box culvert mouth 10, lid 13 concrete does that more shape is certain, firm clip, set firmly effect, guarantee to connect airtight leakproof.

Claims (2)

1, the dyke core stone structure used of a kind of engineering, it is characterized in that: be provided with one and cast the reinforced concrete box culvert of setting size in advance, around the box culvert mouth is to be equipped with a colloid waterstop that exposes to bury the shape ring underground, in box culvert be filled with go through classification, stirring, high pressure compressed be high density and again fragmentation be graininess, and again by the discarded object of the cemented shape that is combined into one of curing compound, and box culvert mouth position, the surface of the discarded object after curing, other is covered with the reinforced concrete earth mulch, and waterstop is that rank is established and connected airtight in each other.
2, the dyke core stone structure used of engineering as claimed in claim 1 is characterized in that, the section of this colloid waterstop is that a plurality of clip flanges are preset in planning.
CN 97228569 1997-10-13 1997-10-13 Dyke core stone structure for engineering Expired - Fee Related CN2320660Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97228569 CN2320660Y (en) 1997-10-13 1997-10-13 Dyke core stone structure for engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97228569 CN2320660Y (en) 1997-10-13 1997-10-13 Dyke core stone structure for engineering

Publications (1)

Publication Number Publication Date
CN2320660Y true CN2320660Y (en) 1999-05-26

Family

ID=33941703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97228569 Expired - Fee Related CN2320660Y (en) 1997-10-13 1997-10-13 Dyke core stone structure for engineering

Country Status (1)

Country Link
CN (1) CN2320660Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101205724B (en) * 2006-12-19 2010-09-15 朴斗绪 Prefabricated concrete box culvert using grouting method and bidirectional anchoring system as well as mounting structure and method thereof
CN101566686B (en) * 2008-04-24 2011-09-07 中国神华能源股份有限公司 Method for precisely controlling section of underwater dike core stones
CN104018436A (en) * 2014-05-07 2014-09-03 四川华西绿舍建材有限公司 Prefabricated box culvert system and installation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101205724B (en) * 2006-12-19 2010-09-15 朴斗绪 Prefabricated concrete box culvert using grouting method and bidirectional anchoring system as well as mounting structure and method thereof
CN101566686B (en) * 2008-04-24 2011-09-07 中国神华能源股份有限公司 Method for precisely controlling section of underwater dike core stones
CN104018436A (en) * 2014-05-07 2014-09-03 四川华西绿舍建材有限公司 Prefabricated box culvert system and installation method thereof
CN104018436B (en) * 2014-05-07 2018-02-09 四川华西绿舍建材有限公司 Prefabricated box culvert system and its installation method

Similar Documents

Publication Publication Date Title
CN103334469B (en) The treatment system removed for inner city pollution of river bed mud and treatment process
KR20160080028A (en) Multipurpose artifical island
CN203498891U (en) Treatment system for removing polluted bed mud in river channel of central urban area
CN102485666A (en) Technology of in situ harmless treatment on waste drilling mud
CN2320660Y (en) Dyke core stone structure for engineering
CN109516657A (en) A kind of solidification of sludge in-situ and stabilization treatment method
JP2005240543A (en) Method of developing shallows and the like
CN216041423U (en) River channel dredging robot device
CN212128697U (en) Soft soil roadbed structure of pin-connected panel binge grid structure body
JPH11158863A (en) Method for effective use of built-up soil through soil improvement by construction ship
US5184917A (en) Method of hydrocarbon decontamination
CN107299637A (en) A kind of solidified earth for possessing mobility pours backfill handling process
JP4736448B2 (en) Construction method of shallow ground
JP2021071459A (en) Mass processing method of ton bags containing high-level and low-level radioactive waste
CN207314077U (en) A kind of precast rc slab block
JP3669401B2 (en) Ground strengthening method
CN108978681A (en) A kind of method of large area mud place backfill
JPH11131436A (en) Consolidating construction method of bottom mud of lake and marsh
CN111441207B (en) Soft foundation treatment split type guest grid replacing and filling structure and construction method
CN215562312U (en) High-strength comprehensive function breakwater with breakwater core prepared from urban waste soil resources
CN220977578U (en) Highway expands catch basin and moves device outward
JPH038751A (en) Method for discarding construction residual soil and soil concrete block
JP2004162426A (en) Foundation cell, cell foundation structure, and construction method for cell foundation structure
JPH10280461A (en) Floating preventing device for underground container
CN207259261U (en) A kind of road construction sewage Multifunctional treatment device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee