CN2278934Y - Lower insert filling iron & steel melt sampler - Google Patents

Lower insert filling iron & steel melt sampler Download PDF

Info

Publication number
CN2278934Y
CN2278934Y CN 96241347 CN96241347U CN2278934Y CN 2278934 Y CN2278934 Y CN 2278934Y CN 96241347 CN96241347 CN 96241347 CN 96241347 U CN96241347 U CN 96241347U CN 2278934 Y CN2278934 Y CN 2278934Y
Authority
CN
China
Prior art keywords
sampler
tube
shell
paper tube
folding mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 96241347
Other languages
Chinese (zh)
Inventor
刘永广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=33915770&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN2278934(Y) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 96241347 priority Critical patent/CN2278934Y/en
Application granted granted Critical
Publication of CN2278934Y publication Critical patent/CN2278934Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigating And Analyzing Materials By Characteristic Methods (AREA)

Abstract

The utility model belongs to a lower inserting and filling type iron and steel melt sampler. The utility model is composed of an outer case, a connection end, a large paper tube, a slag breaking cap, an opening-closing mould, a quartz glass tube, a metal cap and a small paper tube used for connecting, wherein, one end of the outer case is covered with the slag breaking cap, and the other end is a tube-shaped end connected with the big paper tube; the other end of the big paper tube is provided with the small paper tube; the opening-closing mould arranged in the outer case is formed by buckling two blocks of pan-shaped components made in a cold rolling way; one end of each of the components of the opening-closing mould is rolled into a semitubular shape, and a tube segment is formed after the two components of the opening-closing mould are buckled, and can be inserted into the quartz glass tube; the tube end is covered with the metal cap. Compared with the existing say ladle, the utility model has the advantages of simple structure, convenient use and safe operation and also provides a standard, accurate and fast test sample, providing reliable data for steel making production.

Description

Insert down and pour into formula iron and steel water sampler
The utility model belongs to a kind of iron and steel water sampler, particularly pours into formula iron and steel water sampler in a kind of inserting down.
At present, behind the blast furnace smelting molten iron, before delivering to steel mill's steel-making, steelworks is all taken a sample to molten iron and is reviewed the analytical chemistry composition, now still use traditional big dipper sampling always, pour into again in the rectangle mould, stick seal after cooling and deliver to the laboratory, after the laboratory must cut out section with cutting machine, analyze the molten iron composition with chemical analysis method, this simple and crude sampling method is in operating process, and labor intensity is big, and because molten iron secondary ingress of air causes secondary oxidation, this variation directly causes the assay composition inaccurate, again because repeatedly sampling, repeatedly fall sample in the rectangle mould, sticking other nubbin in the die wall and in the spoon, cause the mixed Xi of sample of taking-up other time sample composition, therefore, also cause the sample composition inaccurate, directly affect foundation and reliability that steel mill correctly grasps the true composition of molten iron.And aspect the sampling standard of molten steel stokehold, have plenty of and use big dipper sampling, also exist simultaneously the problems referred to above, the use sampler that has, because the sampler sampling mode is taked vacuum suction and contained not science of deoxidizer, the qualification rate that causes taking a sample can only reach about 50 percent, not only be provided with and alleviate labor strength, otherwise increased workman's number of times of taking a sample, especially, delayed tapping owing to not taking out qualified sample at the crucial moment of tapping.
The purpose of this utility model is at problems of the prior art, develop a kind of inserting down and pour into formula iron and steel water sampler, be the molten iron fluorescence analysis, the spectral analysis of molten steel, standard, sample accurately and rapidly are provided, the foundation of reliability is provided for STEELMAKING PRODUCTION.
It is that a kind of inserting down pours into formula iron and steel water sampler that the utility model is inserted the technical scheme that pours into formula iron and steel water sampler down, it is characterized in that it is mainly by shell, link, big paper tube, the break cap, the folding mould, quartz glass tube, metal cap constitutes with being connected with conette, and shell one end cap wherein has glass slag cap, the other end is the tubular tip that is connected with big paper tube, the other end of big paper tube is equipped with conette, and cased folding mould is fastened by two cold rolling pan shape parts of making and forms, and has otch on the every folding mould parts, form through hole behind two fastenings, one end of every folding mould parts is rolled into halfpipe, fastens the back and forms a pipeline section, can insert quartz glass tube, one end of quartz glass tube exposes outside the shell, and its pipe end that exposes is stamped metal cap.Described folding mould is equipped with the steel folder that clamps usefulness when fastening.Described shell is that the parts by two high temperature of anti-the molten iron constitute, and the splicing back is integral with high temperature adhesive is bonding.Scribble to seal in the porch of shell and use high-temp glue.In the described folding mould deoxidizer is housed.The big paper tube of described connection usefulness is fixed on the link of shell.
When sampling, with sampler be connected with sampling gun the back insert in the molten iron cylinder and converter, open hearth, electric furnace in, enter molten iron, molten steel behind the break layer, utilize the power that pours into and the flowability of liquid molten iron, molten steel under the high temperature, force molten iron, molten steel to enter about 4-3 second in the sampler, flow to automatically and solidify.
The utility model is compared with existing sample spoon, have simple in structure, easy to use, the characteristics of handling safety.Former big dipper sampling, chemical analysis means fall behind, and manually-operated labour intensity is big, the numerous and diverse various factors that waits of operation, thereby easily bring error, and this sampler, disposal molding, and standard, sample accurately and rapidly are provided, provide reliable data for STEELMAKING PRODUCTION.This sampler is disposable use sampler.
For further specifying the concrete structure of this sampler, reach embodiment with reference to the accompanying drawings and be described, its accompanying drawing has
Fig. 1 is the front elevation of this sampler;
Fig. 2 is the cut-open view of this sampler;
Fig. 3 is the side view of this sampler;
Fig. 4 is the end-view of this sampler.
In Fig. 1-4: 1 shell, 2 links, 3 paper tubes, 4 break caps, 5 folding moulds, 6 steel folder, 7 through holes (air hole), the pipeline section of 8 folding moulds, 9 quartz glass tubes, 10 metal caps, 11 high-temp glue, 12 nails, 13 deoxidizers, 14 conettes, 15 vents.
Embodiment:
As Fig. 1-shown in Figure 4: the shell 1 of molten iron, molten steel stokehold sampler is after the parts with two blocks of anti-molten iron, molten steel high temperature material fasten, be bonded with high-temp glue again, make shell 1 insoluble not quick-fried at molten iron below 1750 ℃, molten steel, no chemical change, no physics change.On shell 1, has a tubular link 2, be with big paper tube 3 and conette 14 on the link, be used to connect sampling gun, end at shell is equipped with break cap 4, a folding mould 5 is housed in the enclosure, folding mould 5 is two pan shape parts that adopt cold-reduced sheet system, and close to be buckled together and constitute folding mould 5, deoxidizer 13 (molten steel sampler) is arranged in the folding mould, the folding mould has steel folder 6 outward, the folding die clamp tightly together, on the folding mould, be provided with otch, two folding moulds close to be buckled together and constitute through hole 7 to discharge gas, and in the rolling halfpipe end of folding mould one end, two parts snap together the formation tubulose, to put into high temperature resistant quartz glass tube 9, be used for guide molten steel, molten iron pours in the folding mould 5, and quartz ampoule exposes on the end cap of shell, metal cap 10, smear in the porch of shell and to seal high-temp glue 11, with fixing quartz ampoule with prevent molten iron, molten steel pours into outside the folding mould.

Claims (6)

1, a kind of inserting down pours into formula iron and steel water sampler, it is characterized in that it is mainly by shell, link, big paper tube, the break cap, the folding mould, quartz glass tube, metal cap constitutes with being connected with conette, and shell one end cap wherein has the break cap, the other end is the tubular tip that is connected with big paper tube, the other end of big paper tube is equipped with conette, and cased folding mould is fastened by two cold rolling pan shape parts of making and forms, and has otch on the every folding mould parts, form through hole behind two fastenings, one end of every folding mould parts is rolled into halfpipe, fastens the back and forms a pipeline section, can insert quartz glass tube, one end of quartz glass tube exposes outside the shell, and its pipe end that exposes is stamped metal cap.
2, sampler as claimed in claim 1 is characterized in that described folding mould is equipped with the steel folder that clamps usefulness when fastening.
3, sampler as claimed in claim 1 is characterized in that described shell is that parts by two high temperature of anti-the molten iron constitute, and the splicing back is integral with high temperature adhesive is bonding.
4, sampler as claimed in claim 1 is characterized in that scribbling to seal in the porch of shell using high-temp glue.
5, sampler as claimed in claim 1 is characterized in that in described folding mould deoxidizer being housed.
6, sampler as claimed in claim 1 is characterized in that the big paper tube of described connection usefulness is fixed on the link of shell.
CN 96241347 1996-10-29 1996-10-29 Lower insert filling iron & steel melt sampler Expired - Lifetime CN2278934Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96241347 CN2278934Y (en) 1996-10-29 1996-10-29 Lower insert filling iron & steel melt sampler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96241347 CN2278934Y (en) 1996-10-29 1996-10-29 Lower insert filling iron & steel melt sampler

Publications (1)

Publication Number Publication Date
CN2278934Y true CN2278934Y (en) 1998-04-15

Family

ID=33915770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96241347 Expired - Lifetime CN2278934Y (en) 1996-10-29 1996-10-29 Lower insert filling iron & steel melt sampler

Country Status (1)

Country Link
CN (1) CN2278934Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213650A (en) * 2011-03-24 2011-10-12 东北大学 Molten steel sampling device for continuous casting crystallizer
CN104897435A (en) * 2015-06-17 2015-09-09 马鞍山市东江冶金材料有限公司 Tool for manufacturing molten steel sampler and method for manufacturing molten steel sampler by adopting tool
CN105716902A (en) * 2014-12-01 2016-06-29 鞍钢股份有限公司 Sampler and preparation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213650A (en) * 2011-03-24 2011-10-12 东北大学 Molten steel sampling device for continuous casting crystallizer
CN102213650B (en) * 2011-03-24 2014-01-01 东北大学 Molten steel sampling device for continuous casting crystallizer
CN105716902A (en) * 2014-12-01 2016-06-29 鞍钢股份有限公司 Sampler and preparation method thereof
CN104897435A (en) * 2015-06-17 2015-09-09 马鞍山市东江冶金材料有限公司 Tool for manufacturing molten steel sampler and method for manufacturing molten steel sampler by adopting tool
CN104897435B (en) * 2015-06-17 2018-02-02 马鞍山市东江冶金材料有限公司 A kind of frock for making molten steel sampler and its method for making molten steel sampler

Similar Documents

Publication Publication Date Title
KR20110138145A (en) Measuring probes for measuring and taking samples with a metal melt
CN101476014A (en) Whole process dynamic monitoring method for converter steel melting
CN2278934Y (en) Lower insert filling iron & steel melt sampler
CN201508288U (en) Fast molten steel sampler
CN1114096C (en) Sampling container for obtaining cooling curve of molten metal
CN216132797U (en) Tool for preparing copper pyrometallurgical sample
CN2388599Y (en) Molten metal sampler
CN101293753A (en) Resin sand special for probe core body and high-performance structure sublance composite probe made thereof
CN101592651B (en) Method for measuring carbon content of molten steel in electric steelmaking furnace
CN2168246Y (en) Static-pressure cylinderlike device for withdraw steel liquid
CN2283844Y (en) Orifice type molten steel and iron melt sampler
CN111947978A (en) Temperature measurement and sampling device and method for top-blown furnace slag
CN101726431B (en) Sampler of portable multipurpose smelting furnace and sampling method thereof
CN2390198Y (en) Needle quick molten steel sampler
CN214121669U (en) Molten steel sampler
CN214585389U (en) Device for rapidly measuring carbon content of liquid metal
KR900006568Y1 (en) Slag sampler
CN2180360Y (en) Sampling device for molten steel
CN2334030Y (en) Inserted liquid metal temp.-measuring sampler
CN215262160U (en) Molten iron temperature measurement and sample integral type utensil
CN205280434U (en) Converter molten steel sampler
CN2283843Y (en) Extracting type molten steel and iron melt sampler
CN217765629U (en) Sampling spoon for aluminum alloy smelting
CN2607567Y (en) Single, double chamber flowing backward type molten steel and iron sampler
CN219830449U (en) Liquid silicon sampler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE ADDRESS; FROM: 65-9, ZHANGDA STREET, TIE DISTRICT(EAST), ANSHAN CITY, LIAONING PROVINCE, 114005 TO: 36, DONGFENG STREET, TIE DISTRICT(EAST), ANSHAN CITY, LIAONING PROVINCE, 114001

CP03 Change of name, title or address

Address after: 114001 Liaoning, Anshan, East Street, Iron East 36 a.

Patentee after: Liu Yongguang

Address before: 114005 Liaoning Anshan East Main Street 65-9

Patentee before: Liu Yongguang

C56 Change in the name or address of the patentee

Owner name: NO. 51, JIA, NO. 29, LVHUA STREET, TIE DISTRICT(EA

Free format text: FORMER NAME OR ADDRESS: 36, DONGFENG STREET, TIE DISTRICT(EAST), ANSHAN CITY, LIAONING PROVINCE, 114001

CP03 Change of name, title or address

Patentee address after: 114004, No. 51, 29 Green Street East, Anshan, Liaoning

Patentee address before: 114001, 36 East Dongfeng Street, Anshan, Liaoning

C17 Cessation of patent right
CX01 Expiry of patent term