CN2277071Y CN 96219492 CN96219492U CN2277071Y CN 2277071 Y CN2277071 Y CN 2277071Y CN 96219492 CN96219492 CN 96219492 CN 96219492 U CN96219492 U CN 96219492U CN 2277071 Y CN2277071 Y CN 2277071Y
Authority
CN
China
Prior art keywords
battery
jointing
battery cover
seal
pond box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96219492
Other languages
Chinese (zh)
Inventor
毛义
王宝泰
李加
黄进清
刘昭林
姚志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MOBISHI BATTERY CO Ltd TIANJIN
Original Assignee
MOBISHI BATTERY CO Ltd TIANJIN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MOBISHI BATTERY CO Ltd TIANJIN filed Critical MOBISHI BATTERY CO Ltd TIANJIN
Priority to CN 96219492 priority Critical patent/CN2277071Y/en
Application granted granted Critical
Publication of CN2277071Y publication Critical patent/CN2277071Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Secondary Cells (AREA)

Abstract

The utility model relates to a battery withstand voltage testing device, which a testing bench and a testing fixture. The test bench is formed by an air source gas cylinder, a pressure meter, and the joint of fixture with a central air channel connected in series via air pipelines. The joint of the fixture is connected with the central air channel of the testing fixture by sealing together. The testing fixture is provided with a pressure fixture for testing the cover of the battery, a pressure fixture for testing the sealing of the battery, and a fixture for testing the air flow of the cover of the battery.

Description

The battery pressure resistant testing device
The utility model belongs to battery gasproof body pressure test isolated plant.
Inside battery can produce gas because of electrochemical reaction, so battery container should have impermeability.But the inside battery gaseous tension is crossed conference and is set off an explosion, and therefore the seal request to battery should have critical value, surpasses the sealing load of setting and should allow gas leak.The withstand voltage data that detect battery are important test jobs in the battery production.Also there is not at present special-purpose battery pressure resistant testing device.
The purpose of this utility model is to propose a kind of battery pressure resistant testing device technical scheme, and battery production is carried out angles of science monitoring.
The utility model battery pressure resistant testing device, comprise test board and test fixture, test board is by source of the gas gas cylinder, tensimeter and have the anchor clamps jointing of central airway to form with the gas pipeline serial connection, and the anchor clamps jointing communicates with the test fixture central airway and is tightly connected.Test clip has the battery cover of survey pressing jig, constitute by piezoelectricity pond box nut with the jointing threaded, piezoelectricity pond box nut is pressed on the jointing termination with the battery cover outer ring, and make the galvanic anode end place the screw of piezoelectricity pond box nut, between jointing termination and battery cover bottom surface, O-ring seal is arranged.Test fixture is surveyed the battery seal pressing jig in addition, survey the battery seal pressing jig by have the circle shape pressure measurement core that central airway is arranged of T shape section, the clamp nut that cooperates with the pressure measurement core constitutes, the pressure measurement core communicates with anchor clamps jointing air flue to seal and is spirally connected or clamping.Test fixture is surveyed battery cover gas flow anchor clamps in addition, by with jointing be spirally connected the piezoelectricity pond box nut that is sealed and matched and connect the flowmeter valve, flowmeter constitutes, piezoelectricity pond box nut is pressed on the jointing termination with the battery cover outer ring, and make the galvanic anode end place the screw of piezoelectricity pond box nut, between jointing termination and battery cover bottom surface, O-ring seal is arranged; Connect the sealing of flowmeter valve and piezoelectricity pond box nut and be spirally connected, flowmeter with connect the flowmeter valve and be connected by seal for pipe joints.
Characteristics of the present utility model are to have designed a test board and multiple test fixture, change anchor clamps and can test the different withstand voltage properties of battery.
Embodiment of the present utility model is as shown in drawings:
Accompanying drawing 1 is the test board of the utility model battery pressure resistant testing device;
Accompanying drawing 2 is to survey the battery cover pressing jig;
Accompanying drawing 3 is to survey the battery seal pressing jig;
Accompanying drawing 4 is to survey battery cover gas flow anchor clamps.
Number in the figure is represented:
1, the source of the gas gas cylinder, 2, gas pressure reducer, 3, the pressure-stabilized air source gas cylinder, 4, tensimeter 1,5, operation valve, 6, tensimeter 2,7, the pressure measurement interface, 8, vent valve, 9, piezoelectricity pond box nut, 10, tested battery cover, 11, O-ring seal, 12, jointing, 13, jointing, 14, sealing, 15, attachment screw, 16, clamp nut, 17, packing ring, 18, O-ring seal, 19,4/5A type battery, 20, sealing gasket, 21, the pressure measurement core, 22, jointing, 23, piezoelectricity pond box nut, 24, connect the flowmeter valve, 25, tested battery cover, 26, O-ring seal 1,27, O-ring seal 2,28, O- ring seal 3,29, suspended body flowmeter.
In conjunction with the accompanying drawings the utility model is specified:
Accompanying drawing 1 is the test desk of battery pressure resistant testing device.Constitute wherein by source of the gas gas cylinder 1, gas pressure reducer 2, pressure-stabilized air source gas cylinder 3, tensimeter (1) 4, operation valve 5, tensimeter (2) 6, pressure measurement interface 7 and vent valve 8 that gas pressure reducer 2 and pressure-stabilized air source gas cylinder 3 only are to be connected in series when surveying gas flow, the jointing 12 of anchor clamps 13 or 22 and pressure measurement interface 7 be tightly connected.Anchor clamps have three kinds to be respectively: survey the battery cover pressing jig, survey the battery seal pressing jig and survey battery cover gas flow anchor clamps.Its structure is respectively:
Survey the battery cover pressing jig as shown in Figure 2, survey the battery cover pressing jig, constitute by piezoelectricity pond box nut 9 with jointing 12 threaded, piezoelectricity pond box nut is pressed on the jointing termination with battery cover 10 outer rings, and make the galvanic anode end place the screw of piezoelectricity pond box nut, between jointing termination and battery cover bottom surface, O-ring seal 11 is arranged.Earlier on battery cover, smear suds during measurement, the bubble of the suds at monitoring battery cover place during measurement, the force value of the tensimeter during gassing (2) is the opening pressure of battery cover.Battery cover be that pressure is that the seal cavity qi of chong channel ascending adversely of air flue below battery cover by jointing realizes.
Survey the battery seal pressing jig as shown in Figure 3, survey the battery seal pressing jig by have the circle shape pressure measurement core 21 that central airway is arranged of T shape section, the clamp nut 16 that cooperates with pressure measurement core 21 constitutes, pressure measurement core 21 is located among the battery container 19,19 ends of the housing circles wall song that concaves is pressed between pressure measurement core 21 and the clamp nut 16, and O-ring seal 18 and packing ring 17 seal.One attachment screw 15 is arranged between pressure measurement core 21 and jointing 13, the central airway of attachment screw 15 is communicated with the air flue of jointing 13 and pressure measurement core 21, and attachment screw 15 is spirally connected by O-ring seal 18, sealing gasket 20 sealings with pressure measurement core 21, jointing 13 respectively.During measurement earlier in the battery pond shell closing in place smear suds, opening controlling valve 5 gradually adds atmospheric pressure again, the bubble of monitoring battery seal place suds can be by reading the battery seal withstand voltage in the tensimeter (2).
Survey the battery seal pressing jig as shown in Figure 4, survey battery cover gas flow anchor clamps by with the piezoelectricity pond box nut 23 of jointing 22 by O-ring seal 28 sealing threaded, connect flowmeter valve 24, flowmeter 29 constitutes, piezoelectricity pond box nut 23 is pressed on jointing 22 terminations with battery cover 25 outer rings, and make the galvanic anode end place the screw of piezoelectricity pond box nut 23, between jointing 22 terminations and battery cover 25 bottom surfaces, O-ring seal 26 is arranged; Connecing flowmeter valve 24 is spirally connected by O-ring seal 27 sealings with piezoelectricity pond box nut 23.Valve 24 is connected with suspended body flowmeter 29 or other kind flowmeter by tracheae.During use gas pressure reducer 2, pressure-stabilized air source gas cylinder 3 be serially connected in steady air flow is provided in the pressure resistant testing device.Steady air flow flows to battery cover by sealing pipeline, can only enter flowmeter from the battery cover effluent air, the flow in the time of can recording the battery cover unlatching.Change the size that operation valve is opened gradually, simultaneously to being added in air pressure and the gas flow measurement on the battery cover.Can obtain battery cover when supercharging opens the back and is increased in gas flow under the different pressures with air pressure.On the contrary, the gas flow of battery cover under different pressures in the time of can obtaining air pressure during decompression and descend.Lag-effect in the time of can recording battery safety valve and close.The researchist can be by analyzing the quantitative data that these curve datas obtain the withstand voltage quality of battery cover.

Claims (4)

1, a kind of battery pressure resistant testing device, comprise test board and test fixture, it is characterized in that test board is formed with the gas pipeline serial connection by source of the gas gas cylinder, tensimeter and anchor clamps jointing that central airway arranged, the anchor clamps jointing communicates with the test fixture central airway and is tightly connected.
2, battery pressure resistant testing device as claimed in claim 1, it is characterized in that described test fixture is to survey the battery cover pressing jig, constitute by piezoelectricity pond box nut with the jointing threaded, piezoelectricity pond box nut is pressed on the jointing termination with the battery cover outer ring, and make the galvanic anode end place the screw of piezoelectricity pond box nut, between jointing termination and battery cover bottom surface, O-ring seal is arranged.
3, battery pressure resistant testing device as claimed in claim 1, it is characterized in that described test fixture is to survey the battery seal pressing jig, survey the battery seal pressing jig by have the circle shape pressure measurement core that central airway is arranged of T shape section, the clamp nut that cooperates with the pressure measurement core constitutes, the pressure measurement core communicates with anchor clamps jointing air flue to seal and is spirally connected or clamping.
4, battery pressure resistant testing device as claimed in claim 1, it is characterized in that described test fixture is to survey battery cover gas flow anchor clamps, by with jointing be spirally connected the piezoelectricity pond box nut that is sealed and matched and connect the flowmeter valve, flowmeter constitutes, piezoelectricity pond box nut is pressed on the jointing termination with the battery cover outer ring, and make the galvanic anode end place the screw of piezoelectricity pond box nut, between jointing termination and battery cover bottom surface, O-ring seal is arranged; Connect the sealing of flowmeter valve and piezoelectricity pond box nut and be spirally connected, flowmeter with connect the flowmeter valve and be connected by seal for pipe joints.
CN 96219492 1996-10-11 1996-10-11 Battery withstand voltage testing device Expired - Fee Related CN2277071Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96219492 CN2277071Y (en) 1996-10-11 1996-10-11 Battery withstand voltage testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96219492 CN2277071Y (en) 1996-10-11 1996-10-11 Battery withstand voltage testing device

Publications (1)

Publication Number Publication Date
CN2277071Y true CN2277071Y (en) 1998-03-25

Family

ID=33900073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96219492 Expired - Fee Related CN2277071Y (en) 1996-10-11 1996-10-11 Battery withstand voltage testing device

Country Status (1)

Country Link
CN (1) CN2277071Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007093091A1 (en) * 2006-02-14 2007-08-23 Shenzhen Bak Battery Co., Ltd. An apparatus for detecting sealability of a lithium ion cell
CN100442590C (en) * 2004-07-19 2008-12-10 肇庆市风华锂电池有限公司 Method for measuring gas production rate of battery formation and system therefor
CN101915703A (en) * 2010-08-04 2010-12-15 深圳市科达利实业有限公司 Pressure resistant testing device of lithium battery shell
CN103674768A (en) * 2013-11-22 2014-03-26 深圳市迪凯特电池科技有限公司 Gas production amount detection method and measuring device during lithium ion battery formation
CN105628493A (en) * 2015-12-25 2016-06-01 宁波富邦电池有限公司 Battery clamp used for detecting ultimate pressure of battery sealing part
CN106198238A (en) * 2016-09-06 2016-12-07 珠海银隆新能源有限公司 Burst disk pressure resistant testing device
CN107687976A (en) * 2017-07-04 2018-02-13 合肥力翔电池科技有限责任公司 A kind of high-precision power cover plate explosion-proof pressure testing device
CN115060588A (en) * 2022-08-17 2022-09-16 常州武进中瑞电子科技股份有限公司 Lithium battery pressing test device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100442590C (en) * 2004-07-19 2008-12-10 肇庆市风华锂电池有限公司 Method for measuring gas production rate of battery formation and system therefor
WO2007093091A1 (en) * 2006-02-14 2007-08-23 Shenzhen Bak Battery Co., Ltd. An apparatus for detecting sealability of a lithium ion cell
CN101915703A (en) * 2010-08-04 2010-12-15 深圳市科达利实业有限公司 Pressure resistant testing device of lithium battery shell
CN101915703B (en) * 2010-08-04 2012-09-05 深圳市科达利实业股份有限公司 Pressure resistant testing device of lithium battery shell
CN103674768A (en) * 2013-11-22 2014-03-26 深圳市迪凯特电池科技有限公司 Gas production amount detection method and measuring device during lithium ion battery formation
CN105628493A (en) * 2015-12-25 2016-06-01 宁波富邦电池有限公司 Battery clamp used for detecting ultimate pressure of battery sealing part
CN105628493B (en) * 2015-12-25 2018-03-23 宁波富邦电池有限公司 For the battery clamp for the limiting pressure for detecting battery seal
CN106198238A (en) * 2016-09-06 2016-12-07 珠海银隆新能源有限公司 Burst disk pressure resistant testing device
CN107687976A (en) * 2017-07-04 2018-02-13 合肥力翔电池科技有限责任公司 A kind of high-precision power cover plate explosion-proof pressure testing device
CN115060588A (en) * 2022-08-17 2022-09-16 常州武进中瑞电子科技股份有限公司 Lithium battery pressing test device

Similar Documents

Publication Publication Date Title
CN2277071Y (en) Battery withstand voltage testing device
CN112304595B (en) Testing device capable of analyzing influence of O-shaped ring wire diameter on high-pressure sealing performance
CN108956052A (en) A kind of rubber seal method for testing performance of resistance to carbon dioxide
WO2024124860A1 (en) Experimental device for measuring leakage rate of connecting member and sealing member of hydrogen-blended pipeline, and method
US5983706A (en) Versatile air test apparatus
CN117538217A (en) Device and method for analyzing permeation and migration characteristics of helium-rich natural gas in rock
CN217442797U (en) Seal gasket performance detection device
CN2773666Y (en) Pressure-resistant experimental clamp of A-shaped plastic piping material
CN212458815U (en) Tightness detection device
CN210487184U (en) Air pressure detection device for U-shaped heat exchange tube
CN211121844U (en) A device that leaks hunting for valve block processing
CN2218927Y (en) Testing table for gas pressure part
CN219996654U (en) Portable field gas isobaric sampler
CN107515079A (en) The detection means of spheroid and valve base seal property in a kind of ball valve
CN219224071U (en) Small-volume air bag pressure detection device
CN220187943U (en) Bearing air tightness test device
CN216050542U (en) Novel multi-functional integrated form valve terminal module of gas tightness detector
CN219799160U (en) Gas permeability coefficient tester
CN210464840U (en) Air tightness detection device of air valve
CN212617642U (en) Multipurpose gas flow divider
CN213180518U (en) Packer sealing performance testing device
CN216483723U (en) Sleeve type valve air tightness detection clamp
CN217503336U (en) Continuous gas supply device for environment detection site
CN217637807U (en) Nuclear power plant containment wall coating sealing test device
CN219038257U (en) Air-dirt separator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee