CN2263164Y - Beam clamping device - Google Patents
Beam clamping device Download PDFInfo
- Publication number
- CN2263164Y CN2263164Y CN 96218468 CN96218468U CN2263164Y CN 2263164 Y CN2263164 Y CN 2263164Y CN 96218468 CN96218468 CN 96218468 CN 96218468 U CN96218468 U CN 96218468U CN 2263164 Y CN2263164 Y CN 2263164Y
- Authority
- CN
- China
- Prior art keywords
- clamping device
- channel
- jig
- channel steel
- fixture body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a novel beam clamping device which is composed of a clamping device body and an adjustable beam. The beam clamping device is characterized in that the clamping device body comprises a clamping device and a clamping device base, wherein, the clamping device base is composed of channel steel and a square steel tube which are connected in 90 DEG, and the clamping device is connected with the clamping device base through a screw rod and a screw nut. The adjustable beam is composed of two pieces of channel steel, and a supporting board is arranged between the two pieces of channel steel. Adjusting holes are uniformly arranged on the channel steel, and the clamping device body is connected and fixed with the adjustable beam through a positioning pin. The beam clamping device of the utility model has the advantages of reasonable structure, convenient operation and light weight. The beam clamping device is suitable for beams with various sectional dimensions in construction, the early disassembly can be realized, and the investment cost is lowered. The utility model is suitable for the construction of cast-in-place reinforced concrete beams.
Description
The utility model belongs to the building operations instrument, especially for the construction tool of beam.
General Beam clamping device just supports as side template in construction, and can not regulate with the variation of beam section size, very flexible, and the scope of application is little, operates more loaded down with trivial details.
The purpose of this utility model is, designs a kind of novel Beam clamping device, and it can be by the adjustment of fixture body itself, be applicable to the construction of different cross section beam, and can adjust simultaneously at width and short transverse, and when beam slab is constructed, it can also be as the bearing of floor, and is easy and simple to handle, flexible.
Novel Beam clamping device of the present utility model, be made up of fixture body, adjustable beam, it is characterized in that: fixture body comprises jig, jig seat, and the jig seat is made up of the channel-section steel and the square steel pipe that are 90 degree connections, uniform adjustment hole on channel-section steel, jig connects by the square steel pipe of leading screw and nut and jig seat; Adjustable beam is made of two channel-section steels, is provided with gripper shoe between two channel-section steels, and uniform adjustment hole on channel-section steel connects fixture body and jig beam fixing by alignment pin and cottor pin.
Novel Beam clamping device of the present utility model, fixture body can use separately, and when side bar and top board were constructed simultaneously, fixture body was used in the beam outside, wooden a tree, used in making timber for boats can be fixed in vertical direction; After the combination of fixture body and adjustable beam, can adjust in depth of beam and width, mix up after the size with pin location, location by the sectional dimension of beam.
Use the concrete construction sequence of novel Beam clamping device:
Shop main joist → shop secondary joist → shop fixtures mould → upright beam side → be equipped with elongated wooden a tree, used in making timber for boats → installation jig, and press the adjustable beam of size adjusting, installing and locating pin → tighten jig screw.
This novel Beam clamping device, rational in infrastructure, easy to use, compliance is strong, and is in light weight, is the beam of applicable multiple sectional dimension in construction, can realize again early tearing open, reduces the input expense.Be applicable to the construction of cast-in-situ steel reinforced concrete beam.
Below in conjunction with drawings and Examples, novel Beam clamping device is described further.
Fig. 1 is the fixture body figure in the novel Beam clamping device
Fig. 2 is the adjustable beam figure in the novel Beam clamping device
Fig. 3 is novel Beam clamping device user mode figure
As can be seen, a kind of novel Beam clamping device, form by fixture body, adjustable beam, it is characterized in that: fixture body comprises jig 3, jig seat 1, the jig seat is made up of the channel-section steel and the square steel pipe that are 90 degree connections, uniform adjustment hole 8 on channel-section steel, jig connects by the square steel pipe of leading screw and nut 2 and jig seat; Adjustable beam is made of two channel-section steels 4, is provided with gripper shoe 7 between two channel-section steels, and uniform adjustment hole 8 on channel-section steel is fixing with the channel-section steel and the connection of adjustable beam of fixture body by alignment pin 5 and cottor pin 6.
Claims (1)
1, a kind of novel Beam clamping device, be made up of fixture body, adjustable beam, it is characterized in that: fixture body comprises jig, jig seat, and the jig seat is made up of the channel-section steel and the square steel pipe that are 90 degree connections, uniform adjustment hole on channel-section steel, jig connects by the square steel pipe of leading screw and nut and jig seat; Adjustable beam is made of two channel-section steels, is provided with gripper shoe between two channel-section steels, and uniform adjustment hole on channel-section steel connects fixture body and adjustable beam fixing by alignment pin and cottor pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96218468 CN2263164Y (en) | 1996-08-20 | 1996-08-20 | Beam clamping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96218468 CN2263164Y (en) | 1996-08-20 | 1996-08-20 | Beam clamping device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2263164Y true CN2263164Y (en) | 1997-09-24 |
Family
ID=33899305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96218468 Expired - Fee Related CN2263164Y (en) | 1996-08-20 | 1996-08-20 | Beam clamping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2263164Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493642A (en) * | 2011-11-30 | 2012-06-13 | 中国建筑第六工程局有限公司 | Method of adopting tool type clamp to support ground beam template side molds |
CN106224744A (en) * | 2016-10-13 | 2016-12-14 | 攀枝花学院 | Porous counter force wall bearing |
CN106401179A (en) * | 2016-11-21 | 2017-02-15 | 山东新港模板工程技术股份有限公司 | Novel adjustable beam clamp |
CN110512865A (en) * | 2019-07-12 | 2019-11-29 | 中国建筑股份有限公司 | A kind of beam form support frame, support construction and construction method |
-
1996
- 1996-08-20 CN CN 96218468 patent/CN2263164Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493642A (en) * | 2011-11-30 | 2012-06-13 | 中国建筑第六工程局有限公司 | Method of adopting tool type clamp to support ground beam template side molds |
CN106224744A (en) * | 2016-10-13 | 2016-12-14 | 攀枝花学院 | Porous counter force wall bearing |
CN106401179A (en) * | 2016-11-21 | 2017-02-15 | 山东新港模板工程技术股份有限公司 | Novel adjustable beam clamp |
CN110512865A (en) * | 2019-07-12 | 2019-11-29 | 中国建筑股份有限公司 | A kind of beam form support frame, support construction and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201050190Y (en) | Formwork clamp for building construction | |
CN2263164Y (en) | Beam clamping device | |
CN209163463U (en) | A kind of adjustable window hole molding board support construction easy to disassemble | |
CN201245982Y (en) | Formwork apparatus of cast-in-situ wall | |
CN2642931Y (en) | Top support | |
CN201385092Y (en) | Steel bar bending pliers | |
CN217318436U (en) | Supporting template is used in construction of precast beam attached vibrator | |
CN212526172U (en) | Electric hammer operation extension operating device | |
CN205660083U (en) | Steel bar bending machine for building engineering | |
CN214818912U (en) | Grooving device for joint connecting part of hand model | |
CN219840366U (en) | Self-lifting truss type template | |
CN219343310U (en) | High large form supporting structure of super thick roof of large-scale basement | |
CN221620457U (en) | Metal pipeline grounding hoop stewing device | |
JPS639749Y2 (en) | ||
CN209614071U (en) | A kind of portable, desk dual-purpose angle-bender | |
CN218375283U (en) | Repairing tool for dislocation position of template | |
CN2128281Y (en) | Movable support | |
CN217949179U (en) | Bottom reinforcing apparatus of cylinder construction stake for civil engineering | |
CN211597711U (en) | Aluminum template early-dismantling head connecting piece and aluminum template early-dismantling head supporting piece | |
CN219754067U (en) | Preformed hole sleeve fixing device | |
CN214739848U (en) | Steel formwork assembly convenient to build | |
CN221609511U (en) | Lintel template reinforcing device | |
CN218404962U (en) | Adjustable concrete steel template device for pouring walking plate | |
CN219387203U (en) | Aluminum template connection structure | |
CN221336125U (en) | Auxiliary fixture for bending fire-fighting monitoring line road distributed on wood die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |