CN2261415Y - Two-purpose tower with folding arm for lifting and distributing materials - Google Patents

Two-purpose tower with folding arm for lifting and distributing materials Download PDF

Info

Publication number
CN2261415Y
CN2261415Y CN 96234382 CN96234382U CN2261415Y CN 2261415 Y CN2261415 Y CN 2261415Y CN 96234382 CN96234382 CN 96234382 CN 96234382 U CN96234382 U CN 96234382U CN 2261415 Y CN2261415 Y CN 2261415Y
Authority
CN
China
Prior art keywords
jib
joint
arm
jib joint
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96234382
Other languages
Chinese (zh)
Inventor
孙在鲁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Zoomlion Heavy Industry Science and Technology Development Co Ltd
Original Assignee
CHANGSHA CONSTRUCTION MACHINERY INST MINISTRY OF CONSTRUCTIONS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA CONSTRUCTION MACHINERY INST MINISTRY OF CONSTRUCTIONS filed Critical CHANGSHA CONSTRUCTION MACHINERY INST MINISTRY OF CONSTRUCTIONS
Priority to CN 96234382 priority Critical patent/CN2261415Y/en
Application granted granted Critical
Publication of CN2261415Y publication Critical patent/CN2261415Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a two-purpose tower machine with folding arm for lifting and distributing materials, which belongs to the field of engineering building machinery; a trolley arm frame of the utility model is formed by hinging four arm frame sections [3], [4], [7], [10]through a lower chord, and a pulley group [2], a folding mechanism [5], a folding oil cylinder [9], a safety pull plate [14], a pull plate A [6] and a pull plate B [8] are respectively arranged on each arm frame section or between two arm frame sections; a plate lifting winding engine [1], etc., can make the trolley arm frame position in a horizontal position or form various folding states, two functions of lifting and concrete cloth are provided, and the utility model has the advantages of agile action, convenient operation, reasonable design, safety and simple structure.

Description

The double-duty tower machine of folding-jib lifting cloth
The utility model is that a kind of jib can be rolled over, and both can be used for lifting, can be used for the double-duty tower machine of the cloth of pump concrete again, belongs to the construction machine field.
Along with the progress of building construction technology, the shared proportion of pump concrete is increasing, but concrete cloth needs manpower to move cloth tube more, and both time-consuming, labor content is big again; Adopt the concrete placing boom cloth, but it can not lifting and climbs, so degree of utilization is not high.
The purpose of this utility model is at above-mentioned deficiency, adopts folding dolly jib, lifting and two kinds of functions of cloth can be combined, and when promptly lifting weight such as template, reinforcing bar, can work as the hoist tower machine and use; When cast concrete, can make concrete placing boom again and use.Lifting is turned back, and nimbly and freely, thereby has improved usage ratio of equipment greatly, and manpower and investment are saved in the convenient construction operation.
The utility model adopts following proposal to realize:
The dolly jib is formed by the hinged of lower boom by four jib joints;
On first and second jibs joint, pull bar is housed respectively, between is equipped with strut, has reached the plate winch by assembly pulley, can control upwarping angle or keeping level attitude of second jib joint, the insurance arm-tie also is equipped with in the assembly pulley both sides, and the insurance arm-tie is made up of two batten chains.
Be equipped with between second and second jib joint and unfold mechanism and arm-tie, arm-tie can bear pulling force or relieving, fold mechanism then can make between the 3rd and second jib by telescopic oil cylinder and be multiple angle.
Between third and fourth jib joint arm-tie and telescopic oil cylinder are housed side by side, the former can bear pulling force or relieving, and the latter then can make between the 4th and the 3rd jib joint and be multiple angle.
As follows below in conjunction with the Brief Description Of Drawings working process:
Scheme drawing when Fig. 1 is the utility model lifting operating mode.[1] has been the plate winch among the figure, and [2] are assembly pulley, and [3] are first jib joint, [4] be second jib joint, [5] are fold mechanism, and [6] are arm-tie A, [7] be the 3rd jib joint, [8] are arm-tie B, and [9] are the 4th jib joint for folding oil cylinder [10], [11] be the concrete distributing pipe, [12] are pull bar A, and [13] are strut, [14] be the insurance arm-tie, [15] are pull bar B, and [16] are crane carriage, [17] be body of the tower, [18] are the tower cap, and [19] are equilibrium arm.
Fig. 2 is the utility model concrete distributing operating mode scheme drawing,
Fig. 3 is fold mechanism [a 5] work scheme drawing.[5.1] are telescopic oil cylinder among the figure, and [5.2] are connecting rod A, and [5.3] are connecting rod B, connecting rod A[5.2] and connecting rod B[5.3] an end all and an end of telescopic oil cylinder [5.1] hinged, the other end then respectively with arm-tie A[6] two annexes [6.2] and [6.3] hinged.
Fig. 4 and Fig. 5 are two views of assembly pulley [2] and insurance arm-tie [14].
(see figure 1) has reached plate winch [1] maintenance second jib joint [4] in level attitude by assembly pulley [2] when the utility model is in the lifting operating mode, at this moment, pull bar A[12], strut [13] is all stressed, particularly insure arm-tie [14], insurance position plate [14] is made up of two batten chains, is contained in the both sides of assembly pulley [2] respectively, when second jib saves [4] when being horizontal, insurance arm-tie [14] is stressed, guarantees that second jib saves [4] and keeps horizontality and unlikely having a down dip.In addition, arm-tie A[6] stressed.The 3rd jib joint [7] and the axis of second jib joint [4] are remained on the horizontal linear.Arm-tie B[8] stressed, the axis of the 4th jib joint [10] and the 3rd jib joint [7] is remained on the horizontal linear.Like this, second jib joint [4], the 3rd jib joint [7], the 4th jib joint [10] and first jib joint [3] all remain on the horizontal linear, because first jib joint [3] is that hoisting operation or cloth operation are all by pull bar B[15] remain on level attitude, like this, crane carriage [16] can normally be walked along track, carries out hoisting operation.
When the utility model carries out the concrete distributing operation, having reached plate winch [1] by assembly pulley [2] can make second jib joint [4] upwarp an angle, at this moment, pull bar A[12], strut [13] is still stressed, but insurance arm-tie [14] is no longer stressed, sagging naturally by the insurance arm-tie [14] that two batten chains are formed, certainly, first jib saves still by pull bar B[15] remain on level attitude; In addition, unclamp arm-tie A[6 between second jib joint [4] and the 3rd jib joint [7]] and arm-tie annex [6.2] is hinged, elongation telescopic oil cylinder [5.1], (see figure 3) is connecting rod A[5.2 then] and connecting rod B[5.3] will move to position shown in the long and two-short dash line among Fig. 3 respectively, be a straight line at last, then telescopic oil cylinder [5.1] no longer stretches out, and at this moment, the 3rd jib joint has constituted an acute angle with second jib joint [2]; Equally, unclamp the arm-tie B[8 between the 3rd jib joint [7] and the 4th jib joint [10]], the folding oil cylinder [9] of elongation, then the 4th jib joint [10] and the 3rd jib joint [7] can form multiple obtuse angle.So the concrete distributing pipe [11] that is arranged in the dolly jib is also tortuous along with folding of dolly jib, can realize the concrete distributing of different radii (that is far and near) scope.
The utility model utilizes the hinged of lower boom and is contained in the fold mechanism of top boom, can keep the trolley type jib or be horizontal, perhaps be in folded state, have lifting, two kinds of functions of cloth, and insurance arm-tie etc. is housed, be reasonable in design, safe and reliable, structure is also uncomplicated, is convenient to implement.

Claims (3)

1. a folding-jib lifting cloth double-duty tower machine belongs to the construction machine field, comprises body of the tower [17], tower cap [18], equilibrium arm [19], crane carriage [16], and feature of the present utility model is:
I) the dolly jib saves [3], second jib joint [4], the 3rd jib joint [7], the 4th jib joint [10] by first jib and forms by lower boom is hinged;
Ii) first jib joint [3] has pull bar A[15];
Iii) second jib joint [4] has pull bar B[12], interrelate by an assembly pulley [2] and a plate winch [1];
Ix) between first jib joint [3] and second jib joint [4], tappet [13] is arranged;
X) between second arm joint [4] and the 3rd jib [7], arm-tie A[6 is housed side by side] and fold mechanism [5],
Xi) between the 3rd jib joint [7] and the 4th jib joint [10], arm-tie B[8 is housed side by side] and folding oil cylinder [9],
Xii) concrete distributing pipe [11] runs through first jib joint [3], second jib joint [4], the 3rd jib joint [7] and the 4th jib joint [10], is flat in the dolly jib.
2. by the described double-duty tower machine of claim 1, it is characterized in that the insurance arm-tie of being made up of two batten chains [14] is equipped with in the both sides of assembly pulley [2].
3. by the described double-duty tower machine of claim 2, it is characterized in that having the folding mechanism [5] of a cover, it is by telescopic oil cylinder [5.1], connecting rod A[5.2] and connecting rod B[5.3] form, one end of telescopic oil cylinder [5.1] is fixed on the top boom of second jib joint [4], its other end and connecting rod A[5.2] and connecting rod B[5.3] hinged, connecting rod A[5.2] and connecting rod B[5.3] the other end then respectively with arm-tie A[6] annex [6.2] and [6.3] hinged.
CN 96234382 1996-03-13 1996-03-13 Two-purpose tower with folding arm for lifting and distributing materials Expired - Fee Related CN2261415Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96234382 CN2261415Y (en) 1996-03-13 1996-03-13 Two-purpose tower with folding arm for lifting and distributing materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96234382 CN2261415Y (en) 1996-03-13 1996-03-13 Two-purpose tower with folding arm for lifting and distributing materials

Publications (1)

Publication Number Publication Date
CN2261415Y true CN2261415Y (en) 1997-09-03

Family

ID=33910789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96234382 Expired - Fee Related CN2261415Y (en) 1996-03-13 1996-03-13 Two-purpose tower with folding arm for lifting and distributing materials

Country Status (1)

Country Link
CN (1) CN2261415Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102320526A (en) * 2011-09-14 2012-01-18 哈尔滨东建机械制造有限公司 Self-loading and unloading foldable tower crane
CN102358580A (en) * 2011-08-12 2012-02-22 中联重科股份有限公司 Folding jib structure and method for unfolding and folding the same
CN104495650A (en) * 2014-12-16 2015-04-08 吴春生 Tower crane type concrete delivery device
CN104876135A (en) * 2015-06-10 2015-09-02 南京工业大学 Folding tower crane with automatic locking and unlocking functions
CN105174084A (en) * 2015-06-10 2015-12-23 南京工业大学 Inner tower body and outer tower body automatic locking and unlocking apparatus of rapid installation folding tower crane
CN109703802A (en) * 2019-02-27 2019-05-03 上海钧志物流设备有限公司 Filled fluid ancillary equipment
WO2020052931A1 (en) * 2018-09-13 2020-03-19 Liebherr-Werk Biberach Gmbh Crane
CN113526366A (en) * 2021-06-11 2021-10-22 浙江省建设工程机械集团有限公司 Multifunctional flat-arm tower crane capable of being used for fire fighting

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102358580A (en) * 2011-08-12 2012-02-22 中联重科股份有限公司 Folding jib structure and method for unfolding and folding the same
CN102358580B (en) * 2011-08-12 2013-03-27 中联重科股份有限公司 Folding jib structure and method for unfolding and folding the same
CN102320526A (en) * 2011-09-14 2012-01-18 哈尔滨东建机械制造有限公司 Self-loading and unloading foldable tower crane
CN104495650B (en) * 2014-12-16 2016-04-13 吴春生 A kind of tower crane type appts. for transferring ready-mixed concrete
CN104495650A (en) * 2014-12-16 2015-04-08 吴春生 Tower crane type concrete delivery device
CN104876135A (en) * 2015-06-10 2015-09-02 南京工业大学 Folding tower crane with automatic locking and unlocking functions
CN105174084A (en) * 2015-06-10 2015-12-23 南京工业大学 Inner tower body and outer tower body automatic locking and unlocking apparatus of rapid installation folding tower crane
CN104876135B (en) * 2015-06-10 2017-01-25 南京工业大学 Folding tower crane with automatic locking and unlocking functions
WO2020052931A1 (en) * 2018-09-13 2020-03-19 Liebherr-Werk Biberach Gmbh Crane
US12012313B2 (en) 2018-09-13 2024-06-18 Liebherr-Werk Biberach Gmbh Crane
CN109703802A (en) * 2019-02-27 2019-05-03 上海钧志物流设备有限公司 Filled fluid ancillary equipment
CN109703802B (en) * 2019-02-27 2021-05-28 上海钧志物流设备有限公司 Fluid filling auxiliary equipment
CN113526366A (en) * 2021-06-11 2021-10-22 浙江省建设工程机械集团有限公司 Multifunctional flat-arm tower crane capable of being used for fire fighting
CN113526366B (en) * 2021-06-11 2023-10-03 浙江省建设工程机械集团有限公司 Multifunctional flat arm tower crane for fire fighting

Similar Documents

Publication Publication Date Title
CN2261415Y (en) Two-purpose tower with folding arm for lifting and distributing materials
RU2271330C2 (en) Crane with multifunctional boom
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN2075187U (en) Trackless wheel type manual crane
CN2426870Y (en) Lifting and distributing two-purpose tower crane
CN107235422A (en) It is exclusively used in the crane device of lifting steel pipes and welding
CN2059156U (en) Small crane mounted on truck
CN2466127Y (en) Gin pole for track crane
CN2430420Y (en) Portable light hoist
CN207209826U (en) A kind of derrick crane
CN101077757A (en) Light folding arm type tower crane
CN115650079A (en) Construction equipment and construction method for power tower assembly
CN2285275Y (en) Two-purpose tower machine for lifting and material distributing
CN2057658U (en) Self-lifting type crane
CN2410330Y (en) Double Walking double folding pile-driver
CN206345616U (en) A kind of building tower crane of stable safety
CN221140968U (en) Hoisting trolley
CN218712197U (en) Rigid frame bridge hanging basket hoisting device
CN2212037Y (en) Mulitfunction high speed wellhead by hydraulic lift
CN2292782Y (en) Tower craning and concrete distributing machine
CN2253737Y (en) Small lifting device
CN2587834Y (en) Rotary jib with walking trolley
CN101037175A (en) Weight-balancing type lifting method and equipment
CN114961201B (en) Air film reinforced concrete structure construction operation platform and application method thereof
CN2511666Y (en) Device for keeping balance of multi-folding top mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE; FROM: MINISTRY OF CONSTRUCTION, CHANGSHA CONSTRUCTION MACHINERY RESEARCH INSTITUTE TO: CHANGSHA ZOOMLION HEAVY INDUSTRY SCI-TECH CO., LTD

CP03 Change of name, title or address

Address after: 410013 No. 307 South silver basin, Hunan, Changsha

Patentee after: Chang Sha Zoomlion Heavy Industry Science & Technology Development Co., Ltd.

Address before: 410013 box 9, Changsha, Hunan

Patentee before: Changsha Construction Machinery Research Institute of Ministry of construction

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee