CN115650079A - Construction equipment and construction method for power tower assembly - Google Patents

Construction equipment and construction method for power tower assembly Download PDF

Info

Publication number
CN115650079A
CN115650079A CN202211159152.7A CN202211159152A CN115650079A CN 115650079 A CN115650079 A CN 115650079A CN 202211159152 A CN202211159152 A CN 202211159152A CN 115650079 A CN115650079 A CN 115650079A
Authority
CN
China
Prior art keywords
tower
construction
amplitude
arm
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211159152.7A
Other languages
Chinese (zh)
Inventor
辛鹏
相振松
孙虹宇
周辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tysim Piling Equipment Co ltd
Original Assignee
Tysim Piling Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tysim Piling Equipment Co ltd filed Critical Tysim Piling Equipment Co ltd
Priority to CN202211159152.7A priority Critical patent/CN115650079A/en
Publication of CN115650079A publication Critical patent/CN115650079A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The invention discloses construction equipment of a power tower assembly and a construction method thereof, belonging to the technical field of building construction, and comprising an expanding chassis, an amplitude-varying mechanism, a telescopic boom arm body, a bottom supporting device, a hoisting winch device, an amplitude-varying winch device, a top lengthened section, a left rocker arm, a right rocker arm, a rotary joint and a top upright rod, wherein the amplitude-varying mechanism is hinged on the expanding chassis, the telescopic boom arm body is rotatably connected on the expanding chassis, the bottom supporting device is arranged at the bottom of the telescopic boom arm body, the hoisting winch device is arranged on the telescopic boom arm body and positioned above the bottom supporting device, the amplitude-varying winch device is arranged on the hoisting winch device, the top lengthened section is arranged at the top of the telescopic boom arm body, the left rocker arm and the right rocker arm are horizontally arranged at the top of the top lengthened section through the rotary joint, and the top upright rod is vertically arranged at the top of the rotary joint. The construction method can greatly improve the construction operation efficiency, reduce the construction safety risk and reduce the equipment transportation cost.

Description

Construction equipment and construction method for power tower assembly
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to construction equipment and a construction method for a power tower assembly.
Background
There is a lack of efficient, specialized construction machines. A large number of excellent engineering machinery manufacturing enterprises emerge domestically, and the improvement of the construction mechanization level is promoted. For the construction industry of assembling iron towers in power transmission line engineering, the application of efficient and professional construction machinery to carry out mechanized construction is urgently needed. The labor intensity of operators is high, the efficiency is low, the construction period is long, the operation risk is high, and the requirements of environmental protection cannot be fully considered in part of construction modes. With the continuous and rapid development of economic society, the cost of the power grid construction human resources is greatly increased, and particularly, first-line constructors are lacked and wages are continuously increased. Meanwhile, the strong smart power grid puts forward higher requirements on the engineering construction quality and the construction period, the design concept and the method are innovated, the mechanical construction requirements of the whole process of the line are met, the manual investment and the operation risk are reduced, the engineering construction quality and efficiency are further improved, and the economic, environmental and social benefits are improved.
Along with the continuous improvement of transmission line voltage class, the tower shape size of transmission line iron tower is showing to be increased, and tower material singleton weight is big, and the installation accuracy requires highly, and quality control is tight, and the tower construction degree of difficulty increases, has also proposed higher requirement to the tower construction level. Therefore, a reasonable mechanical tower combining mode is selected according to the actual conditions of the combined engineering, and a new schedule is provided for the research, development and utilization of mechanical equipment with stronger universality, better reliability and higher mechanization level.
The mobile crane (including an automobile crane, a full-ground crane, a crawler crane, an off-road tire crane and the like) is key equipment for construction of heavy projects such as metallurgy, wind power, high-speed rail, nuclear power, petrochemical industry and the like, and plays an irreplaceable role in infrastructure. The mobile crane has the advantages of good maneuverability, convenient field transfer and larger hoisting weight, and the mobile crane is a safe and efficient construction method when used for assembling a mobile crane in narrow areas or high towers accessed by transportation roads, is limited by terrain and road conditions, and has less chance of using the mobile crane in iron tower assembly in power transmission line engineering. The mobile crane comprises a crawler crane, a tire crane, an all-terrain crane and a lorry-mounted crane, and various types of the mobile crane have own characteristics and advantages, and are the most commonly used automobile cranes at present. The automobile crane arranges the lifting, amplitude variation, rotation and operation devices on a tyre type chassis, can flexibly run on a road surface, has better maneuverability, but has high requirements on roads and fields, and has the advantages of larger frame, higher gravity center, higher overall height, more various transmission line engineering points, dispersed operation points, poorer road transportation conditions, and the automobile crane is only applied in small ranges such as urban areas, plains and the like. The crawler crane can run under load and has good maneuvering, cross-country and obstacle crossing performances. However, the main arm 55m has a heavy weight (three are taken as examples, the main arm 55m has an SCC800HD self weight of 88t, a counterweight of 27.6t and a transport width of 3.49 m), and the main arm needs to be assembled by a crane on site in a matching way, and can only be applied to areas with less smoke, such as western plateaus, northern plains and the like.
The diversity of the domestic tower assembling construction machine and method adapts to the requirements of different voltage grades and different tower types under different terrain conditions, and the tower assembling method and technology are continuously innovated and perfected in development, thereby playing an important role in ensuring the safety of tower assembling construction and improving the work efficiency. However, the construction of the floor double-flat-arm holding pole tower assembly and the rocker arm holding pole technology are only suitable for pile positions with good terrain and traffic convenience, few domestic application cases exist in high and large mountainous areas and steep terrains due to the adoption of the floor double-flat-arm holding pole and the rocker arm holding pole tower assembly, and the mainstream mode is that the outer stay wire suspension holding pole and the inner stay wire suspension holding pole are disassembled to form the tower. However, in recent years, accidents caused by the use of the suspension holding pole group tower are frequent. Therefore, the development of research and application of key technologies of the novel crawler-type electric construction crane for mountainous terrain is necessary, and the research result can effectively solve the problem that tower assembly is difficult in parts of terrain complex areas.
Therefore, it is necessary to provide a construction apparatus for a power tower and a construction method thereof.
Disclosure of Invention
The embodiment of the invention provides construction equipment and a construction method of a power tower assembly, which aim to solve the problems in the prior art.
The embodiment of the invention adopts the following technical scheme: the utility model provides a construction equipment of power pack tower, includes the chassis that widens, becomes width mechanism, the flexible armarm body, bottom sprag device, lifts by crane hoisting device, becomes width of cloth hoisting device, top extension festival, controls rocking arm, rotary joint and top pole setting, become width mechanism articulates on the chassis that widens, flexible armarm body rotates to be connected on the chassis that widens and flexible armarm body is articulated with become width mechanism, bottom sprag device sets up the bottom at the flexible armarm body, hoisting device sets up on the flexible armarm body and is located bottom sprag device's top, become width of cloth hoisting device and install on lifting hoisting device, top extension festival sets up the top at the flexible armarm body, control the rocking arm level and pass through the rotary joint and install the top at top extension festival, the vertical top that sets up at the rotary joint of top pole setting.
Furthermore, a supporting oil cylinder is arranged on the amplitude variation mechanism, the tail end of the supporting oil cylinder is rotatably connected to the widening chassis, and the telescopic end of the supporting oil cylinder is hinged to the side wall of the telescopic arm body.
Furthermore, the bottom supporting device is a supporting leg oil cylinder, and the tail end of the supporting leg oil cylinder is fixedly connected to the bottom of the telescopic arm body.
Furthermore, the arm body of the telescopic arm is of a multi-layer rod body structure, and a safety lock pin is arranged on the arm body of the telescopic arm.
Furthermore, a rotary supporting seat is arranged on the top lengthened section, and the rotary joint is connected with the top lengthened section through the rotary supporting seat.
Furthermore, the hoisting winch device and the variable amplitude winch device are respectively provided with two hoisting steel wire ropes and variable amplitude steel wire ropes.
Furthermore, a plurality of fixed cables are arranged on the arm body of the telescopic arm, and two adjusting cables are arranged on the left rocker arm and the right rocker arm.
A construction device and a construction method of a power tower assembly are provided, wherein the construction method comprises the following steps:
s1: the method comprises the steps that a track widening lower frame of a widening chassis is widened to the maximum position, a top lengthening section, a left rocker arm, a right rocker arm, a rotary joint and a top vertical rod are installed at the top of an inner rod of a telescopic boom, a hoisting steel wire rope and a luffing steel wire rope on a hoisting winch and a luffing winch are correctly wound, then a telescopic boom body is erected in a vertical state by adjusting a luffing mechanism and a supporting oil cylinder arranged on the luffing mechanism, then a supporting oil cylinder is used for firmly supporting the ground, and a fixed cable is used for reliably connecting the telescopic boom body with a power tower foundation, so that the construction stability and reliability are ensured;
s2: then, the telescopic arm body begins to extend and retract to lift a section of arm height by adopting a single-cylinder bolt mode, the hoisting device is operated to hoist the electric tower building material, the distance from a hoisted heavy object to the vertical center of the telescopic arm body can be adjusted by operating the amplitude-variable hoisting device in the construction process, and the electric tower can be conveniently built to be installed on an alignment hole;
s3: after the left side electric tower and the right side electric tower are assembled, the adjusting cables are pulled manually to enable the rotary joints, the left rocker arms, the right rocker arms and the top upright rods to rotate by 90 degrees, the electric tower assembling operation in the orthogonal direction is realized, and at the moment, the tower assembling operation at the height is completed; the telescopic arm bodies extend out of the second section of arm body and the third section of arm successively until all the sections of arm bodies extend out completely to reach the maximum extending height, and finally the tower operation of the power tower group is completed;
s4: after the electric tower is built, the arm body of the telescopic arm retracts completely, a lifting steel wire rope of the lifting winch device retracts, the left rocker arm and the right rocker arm are made to move upwards from a 90-degree orthogonal state to a parallel state with the top upright rod by adjusting the amplitude-variable steel wire rope of the amplitude-variable winch device, and then the equipment slowly moves to the outside of the tower from the tower body by itself by adjusting the amplitude-variable mechanism and the supporting oil cylinder, so that the electric tower building construction is completed.
The embodiment of the invention adopts at least one technical scheme which can achieve the following beneficial effects:
the construction method meets the self-walking requirement of the complex stratum of the power tower, has compact structural design, reduces the transportation difficulty and the field operation difficulty; a mature single-cylinder bolt telescopic arm structure is adopted, so that the construction reliability and safety are ensured; through the construction method, the construction operation efficiency can be greatly improved, the construction safety risk is reduced, and the equipment transfer cost is reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view illustrating a transport state of the construction equipment;
FIG. 3 is a schematic diagram of a tower-assembling process of the present invention;
FIG. 4 is a schematic diagram of the process of electrically building a tower and lifting the tower out of the tower according to the present invention;
reference numerals
The device comprises a widening chassis 1, a luffing mechanism 2, a supporting oil cylinder 2-1, a telescopic boom body 3, a bottom supporting device 4, a supporting oil cylinder 4-1, a hoisting winch 5, a hoisting steel wire rope 5-1, a luffing winch 6, a luffing steel wire rope 6-1, a top extension joint 7, a left rocker arm 8, a right rocker arm 8, a rotary joint 9, a top upright rod 10, a fixed cable 11, an adjusting cable 12 and a rotary supporting seat 13.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the specific embodiments of the present invention and the accompanying drawings. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
The technical solutions provided by the embodiments of the present invention are described in detail below with reference to the accompanying drawings.
Referring to fig. 1 to 4, an embodiment of the present invention provides a construction device for an electric power tower assembly, including an widening chassis 1, a luffing mechanism 2, a telescopic boom arm 3, a bottom support device 4, a hoisting device 5, a luffing device 6, a top extension joint 7, left and right rocker arms 8, a rotary joint 9, and a top vertical rod 10, where the luffing mechanism 2 is hinged to the widening chassis 1, the luffing mechanism 2 has a function of adjusting the posture and support of the telescopic boom arm 3, the telescopic boom arm 3 is rotatably connected to the widening chassis 1, the telescopic boom arm 3 is hinged to the luffing mechanism 2, the bottom support device 4 is disposed at the bottom of the telescopic boom arm 3, the hoisting device 5 is disposed on the telescopic boom arm 3 and above the bottom support device 4, the luffing device 6 is mounted on the hoisting device 5, the top extension joint 7 is disposed at the top of the telescopic boom arm 3, the left and right rocker arms 8 are horizontally mounted at the top of the top extension joint 7 through the rotary joint 9, and the top vertical rod 10 is disposed at the top of the top rotary joint 9. The broadening chassis 1 is a crawler type travelling mechanism, the lower vehicle body is a crawler broadening lower vehicle body, the crawler broadening lower vehicle body has a telescopic function, and a crawler retracts in a transportation state to reduce the transportation width; the operating condition track widens, increases construction stability, and flexible arm body 3 adopts the single cylinder bolt mode, belongs to prior art and refers to chinese patent application No. CN2014202311000. The hoisting and conveying body of the crawler-type electric building tower is shown in figure 2, and the crawler-type electric building tower can travel by itself and climb a certain slope. The long-distance transportation is carried to a construction site through a transport vehicle, and the equipment automatically travels to a specific construction station.
Specifically, a supporting oil cylinder 2-1 is arranged on the luffing mechanism 2, the tail end of the supporting oil cylinder 2-1 is rotatably connected to the widening chassis 1, and the telescopic end of the supporting oil cylinder 2-1 is hinged to the side wall of the telescopic arm body 3; the angle of the telescopic arm body 3 in the vertical direction is adjusted through the supporting oil cylinder 2-1, so that the construction state and the transportation state are achieved.
Specifically, the bottom support device 4 is a support oil cylinder 4-1, and the tail end of the support oil cylinder 4-1 is fixedly connected to the bottom of the telescopic arm body 3; when the support leg oil cylinder 4-1 is in a working state, the support leg oil cylinder is completely supported to the ground, and the construction stability of equipment is improved.
Specifically, flexible armarm body 3 is multilayer body of rod structure, and this flexible armarm body 3 sets up to the multilayer body of rod according to lifting height difference, designs different numbers of piles for the multilayer body of rod, and the flexible armarm top of its inlayer body of rod is connected with controlling rocking arm 8, top pole setting 10 through top extension 7, rotary joint 9, controls 8 symmetrical arrangement rotary joint 9's of rocking arm both sides, controls rocking arm 8, top pole setting 10 and flexible armarm body 3 and realizes the perpendicular ground axis rotation function of axial body of rod through rotary joint 9.
And a safety lock pin is arranged on the telescopic arm body 3. And after each layer of rod body of the multilayer rod body is completely stretched out, the safety lock pin is locked, so that safety accidents are prevented, and the construction safety is improved.
Specifically, the top extension section 7 is provided with a rotary support base 13, and the rotary joint 9 is connected with the top extension section 7 through the rotary support base 13, so that the mutual rotation function can be realized.
Specifically, two hoisting winches 5 and two amplitude-variable winches 6 are arranged, and the hoisting winches 5 and the amplitude-variable winches 6 are respectively wound with hoisting steel wire ropes 5-1 and amplitude-variable steel wire ropes 6-1.
Specifically, be equipped with a plurality of fixed hawsers 11 on the flexible arm body 3, fixed hawser 11 will stretch out and draw back arm body 3 and reliably be connected with the electric power tower basis, ensure construction stability and reliability, rocking arm 8 is equipped with two adjustment hawsers 12 about, accomplishes the back of the construction of the left and right sides electricity tower, makes rotary joint 9, rocking arm 8, top pole setting 10 rotate 90 about, realization quadrature direction electricity tower group tower operation through manpower pulling adjustment hawser 12.
A construction device and a construction method of a power tower assembly are provided, wherein the construction method comprises the following steps:
s1: the method comprises the steps that a track widening lower frame of a widening chassis 1 is widened to the maximum position, a top lengthening section 7, a left rocker arm 8, a right rocker arm 8, a rotary joint 9 and a top upright rod 10 are installed at the top of an inner rod of a telescopic boom, a hoisting steel wire rope 5-1 and a luffing steel wire rope 6-1 on a hoisting winch 5 and a luffing winch 6 are correctly wound, then a telescopic boom body 3 is erected in a vertical state by adjusting a luffing mechanism 2 and a supporting oil cylinder 2-1 arranged on the luffing mechanism, a supporting oil cylinder 4-1 is firmly supported, and a fixed cable 11 reliably connects the telescopic boom body 3 with an electric power tower foundation, so that the construction stability and reliability are ensured;
s2: then, the telescopic arm body 3 starts to stretch and lift by one-section arm height by adopting a single-cylinder bolt mode, the hoisting winch 5 is operated to hoist the electric tower construction material, and the distance from a hoisted heavy object to the vertical center of the telescopic arm body 3 can be adjusted by operating the variable-amplitude hoisting device 6 in the construction process, so that the electric tower can be conveniently constructed to carry out installation operation on the alignment hole site;
s3: after the left and right electric towers are assembled, the adjusting cables 12 are pulled manually to enable the rotary joints 9, the left and right rocker arms 8 and the top upright stanchions 10 to rotate 90 degrees, so that the tower assembling operation of the electric towers in the orthogonal direction is realized, and at the moment, the tower assembling operation of the height is completed; the telescopic arm body 3 extends out of the second arm body and the third arm successively until all the arm bodies extend out completely to reach the maximum extending height, and finally the tower assembling operation of the power tower is completed;
s4: after the electric tower is built, the telescopic boom arm body 3 is completely retracted, a lifting steel wire rope 5-1 of the lifting winch device 5 is retracted, the left and right rocker arms 8 are upwards folded together with the top upright stanchion 10 from a 90-degree orthogonal state to a parallel state by adjusting the amplitude-variable steel wire rope 6-1 of the amplitude-variable winch device 6, and the equipment slowly moves to the outside of the tower from the tower body by self through the adjustment amplitude-variable mechanism 2 and the support oil cylinder 2-1, so that the electric tower building construction is completed.
The construction method meets the self-walking requirement of the complex stratum of the power tower, has compact structural design, reduces the transportation difficulty and the field operation difficulty; a mature single-cylinder bolt telescopic arm structure is adopted, so that the construction reliability and safety are ensured; by the construction method, the construction operation efficiency can be greatly improved, the construction safety risk is reduced, and the equipment transfer cost is reduced.
The above description is only an example of the present invention, and is not intended to limit the present invention. Various modifications and alterations to this invention will become apparent to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a construction equipment of power unit tower, its characterized in that, including widening chassis (1), luffing mechanism (2), flexible army body (3), bottom strutting arrangement (4), lift hoisting gear (5), luffing hoisting gear (6), top extension joint (7), control rocking arm (8), revolute joint (9) and top pole setting (10), luffing mechanism (2) articulates on widening chassis (1), flexible army body (3) rotate to be connected on widening chassis (1) and flexible army body (3) and luffing mechanism (2) are articulated, bottom strutting arrangement (4) set up the bottom at flexible army body (3), hoisting gear (5) set up on flexible army body (3) and are located the top of bottom strutting arrangement (4), luffing gear (6) are installed on hoisting gear (5), top extension joint (7) set up the top at flexible army body (3), control rocking arm (8) level is installed at the top that adds revolute joint (7) through revolute joint (9), top setting up at the top of vertical revolute joint (10).
2. The construction equipment of a power pack tower as claimed in claim 1, wherein: the variable-amplitude mechanism (2) is provided with a supporting oil cylinder (2-1), the tail end of the supporting oil cylinder (2-1) is rotatably connected to the widening chassis (1), and the telescopic end of the supporting oil cylinder (2-1) is hinged to the side wall of the telescopic arm body (3).
3. The construction equipment of a power pack tower as claimed in claim 1, wherein: the bottom supporting device (4) is a supporting leg oil cylinder (4-1), and the tail end of the supporting leg oil cylinder (4-1) is fixedly connected to the bottom of the telescopic arm body (3).
4. The construction equipment of a power pack tower as claimed in claim 1, wherein: the telescopic arm body (3) is of a multi-layer rod body structure, and a safety lock pin is arranged on the telescopic arm body (3).
5. The construction equipment of a power pack tower as claimed in claim 1, wherein: and a rotary supporting seat (13) is arranged on the top lengthened section (7), and the rotary joint (9) is connected with the top lengthened section (7) through the rotary supporting seat (13).
6. The construction equipment of a power pack tower as claimed in claim 1, wherein: the hoisting winch device (5) and the amplitude-variable winch device (6) are respectively provided with two hoisting steel wire ropes (5-1) and two amplitude-variable steel wire ropes (6-1) in a winding mode.
7. The construction equipment of a power pack tower as claimed in claim 1, wherein: the telescopic arm body (3) is provided with a plurality of fixed mooring ropes (11), and the left rocker arm and the right rocker arm (8) are provided with two adjusting mooring ropes (12).
8. The construction equipment and construction method of the power tower assembly according to any one of 1 to 7, characterized in that: the construction method comprises the following steps:
s1: the method comprises the steps that a track widening chassis (1) is widened to the maximum position, a top lengthened section (7), a left rocker arm, a right rocker arm (8), a rotary joint (9) and a top upright rod (10) are installed at the top of an inner rod of a telescopic boom, a hoisting steel wire rope (5-1) and a variable amplitude steel wire rope (6-1) on a hoisting winch (5) and a variable amplitude winch (6) are correctly wound, then a telescopic boom body (3) is lifted up to be in a vertical state by adjusting a variable amplitude mechanism (2) and supporting oil cylinders (2-1) arranged on the variable amplitude winch, then a supporting oil cylinder (4-1) is firmly supported, a fixed cable (11) is used for reliably connecting the telescopic boom body (3) with an electric power tower foundation, and construction stability and reliability are guaranteed;
s2: then, the telescopic arm body (3) begins to extend and retract to lift a section of arm height by adopting a single-cylinder bolt mode, a hoisting winch (5) is operated to hoist the electric tower construction material, the distance from a hoisted heavy object to the vertical center of the telescopic arm body (3) can be adjusted by operating a variable-amplitude hoisting winch (6) in the construction process, and the electric tower can be conveniently built to carry out installation operation on the alignment hole position;
s3: after the left and right electric towers are assembled, the adjusting cables (12) are pulled manually to enable the rotary joints (9), the left and right rocker arms (8) and the top upright stanchions (10) to rotate 90 degrees, so that the tower assembling operation of the electric towers in the orthogonal direction is realized, and at the moment, the tower assembling operation of the height is completed; the telescopic arm body (3) extends out of the second arm body and the third arm successively until all the arm bodies extend out completely to reach the maximum extension height, and finally the tower assembling operation of the power tower is completed;
s4: after the electric tower is built, the telescopic boom arm body (3) is completely retracted, a hoisting steel wire rope (5-1) of the hoisting winch device (5) is retracted, the left and right rocker arms (8) are upwards closed to be parallel to the top upright rod (10) from a 90-degree orthogonal state by adjusting the amplitude-variable steel wire rope (6-1) of the amplitude-variable winch device (6), and then the equipment slowly moves to the outside of the tower from the tower body by self by adjusting the amplitude-variable mechanism (2) and the supporting oil cylinder (2-1), so that the electric tower building construction is completed.
CN202211159152.7A 2022-09-22 2022-09-22 Construction equipment and construction method for power tower assembly Pending CN115650079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211159152.7A CN115650079A (en) 2022-09-22 2022-09-22 Construction equipment and construction method for power tower assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211159152.7A CN115650079A (en) 2022-09-22 2022-09-22 Construction equipment and construction method for power tower assembly

Publications (1)

Publication Number Publication Date
CN115650079A true CN115650079A (en) 2023-01-31

Family

ID=84986259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211159152.7A Pending CN115650079A (en) 2022-09-22 2022-09-22 Construction equipment and construction method for power tower assembly

Country Status (1)

Country Link
CN (1) CN115650079A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117105114A (en) * 2023-07-25 2023-11-24 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117105114A (en) * 2023-07-25 2023-11-24 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN117105114B (en) * 2023-07-25 2024-04-09 常州润源电力建设有限公司 Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation

Similar Documents

Publication Publication Date Title
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN115650079A (en) Construction equipment and construction method for power tower assembly
CN114751316A (en) Internal climbing type double-flat-arm holding pole
CN103832933A (en) Group tower type crane with auxiliary boom
WO2024066291A1 (en) Middle hoisting-type unit support carrier
CN113023587A (en) Movable tower crane for electric tower assembly
CN210659920U (en) Pulling type drilling machine derrick base structure
CN216945934U (en) Double-rocker floor holding pole
CN218400764U (en) In put and lift by crane type unit support carrier
CN111608081A (en) Transportation and erection integrated equipment
CN208376906U (en) Shift unit, dynamic compaction machinery, crane, continuous wall grab chute forming machine and rotary drilling rig
CN113582046B (en) Crawler-type electric tower crane
CN115259037A (en) Self-walking track mast vertical lifting platform
CN210117175U (en) Hoisting equipment
CN114572854A (en) Assembled squat silo roof hoisting system and silo roof hoisting method
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN109534182B (en) Movable fast assembling crane
CN2306981Y (en) Double deck tong fixed tower crane lift-up mechanism
CN217201750U (en) Internal climbing type double-flat-arm holding pole
CN216549370U (en) Rolling structure for drum body of wheeled crane
CN2410330Y (en) Double Walking double folding pile-driver
CN206751239U (en) A kind of safe and convenient shock-absorbing type crane leg
CN2539831Y (en) Telescopic three-section derrick for truck-mounted drilling and repairing equipment
CN213037273U (en) Self-propelled hydraulic lifting gantry crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination