CN2260819Y - Prefabricated short pile of reinforced concrete - Google Patents
Prefabricated short pile of reinforced concrete Download PDFInfo
- Publication number
- CN2260819Y CN2260819Y CN 96234238 CN96234238U CN2260819Y CN 2260819 Y CN2260819 Y CN 2260819Y CN 96234238 CN96234238 CN 96234238 CN 96234238 U CN96234238 U CN 96234238U CN 2260819 Y CN2260819 Y CN 2260819Y
- Authority
- CN
- China
- Prior art keywords
- pile
- reinforced concrete
- prefabricated
- prefabricated short
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a prefabricated short pile of reinforced concrete, belonging to the building component. The upper end of a column pile body whose cross section is square has hooks, and the bottom is a four-edged cone pile tip. When used for the construction of compound pile foundation, the prefabricated short pile which can be tightly combined with soil foundations has high bearing capacity and low cost, suitable for the construction of building foundations in such complicated geological conditions as underground water, etc.
Description
Building unit is specifically related to a kind of reinforced concrete prefabricated stub.
The construction work foundation construction, the foundation pile that piling is used is the most common with precast reinforced concrete piles, generally is the flat long stake in square-section; What adopt with the tube-sinking cast-in-situ pile of prefabricated pile crown is conical precast reinforced concrete piles head, can not combine closely with the ground of carrying during construction, composite pile foundation technology (number of patent application 95110893.X) for adapting to various complicated geological environment constructions needs its corresponding reinforced concrete prefabricated stub.
The purpose of this utility model is a kind of reinforced concrete prefabricated stub that can combine closely with ground on every side that is designed for composite pile foundation.
A kind of reinforced concrete prefabricated stub of the utility model design is characterized in that the cross section is that suspension ring are arranged at the top of foursquare cylindricality pile body, and the bottom is the stake point of tetrapyamid shape, and tapering is 30 °-60 °.
Use the concrete prefabricated stub of the utility model design to carry out the composite pile foundation construction, earlier with traditional luoyang spade stake machine shoveling pore-forming, then the precast reinforced concrete piles drop shot is put in the hand-hole at the bottom of the hole, dose again through selecting the building waste or the rubble of break process, dash with the hammer ram at the bigger sharp end of the power of splitting and to ram, make and fill thing and combine more closely with soil layer around it, the reinforced concrete prefabricated stub at the sharp end is convenient to stretch into soil layer, form integral body, improved the bearing capacity of foundation pile.
The schematic diagram of a kind of reinforced concrete prefabricated stub that accompanying drawing designs for the utility model.
A kind of reinforced concrete prefabricated stub shown in the figure, pile body [1] are that the cross section is foursquare long column body, and hook [2] is arranged at its top, and the bottom is the stake point [3] of rectangular pyramid shape, and tapering is 45 °, and promptly the four sides all is an equilateral triangle.
The Prefabricated short pile of reinforced concrete that the utility model proposes, more mixed than general reinforcing bar Solidifying native prefabricated pile will be lacked, and point is easier enters in the soil layer in the stake of rectangular pyramid shape, by splitting The hammer ram of the garden cone point that power is bigger after adding building waste, rushes rammer, with ground The base layer is in conjunction with tight, and single pile bearing can reach 150KN-300KN. Use this practicality new The composite pile foundation of the Prefabricated short pile of reinforced concrete of type design can solve the Luoyang Spade punching Meet the difficult problem of water pile difficulty at the bottom of the priming concrete pile hole, also can overcome general prefabricated pile cost height Waste big shortcoming, the bearing capacity height, cost is low, is suitable for the stratum of complex geological condition Construction is its outstanding advantage.
Claims (1)
1, a kind of reinforced concrete prefabricated stub is characterized in that the cross section is a foursquare long column shape pile body [1], and there are suspension ring [2] upper end, and the bottom is the stake point [3] of tetrapyamid shape, and tapering is 30 °-60 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96234238 CN2260819Y (en) | 1996-02-12 | 1996-02-12 | Prefabricated short pile of reinforced concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96234238 CN2260819Y (en) | 1996-02-12 | 1996-02-12 | Prefabricated short pile of reinforced concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2260819Y true CN2260819Y (en) | 1997-08-27 |
Family
ID=33910679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96234238 Expired - Fee Related CN2260819Y (en) | 1996-02-12 | 1996-02-12 | Prefabricated short pile of reinforced concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2260819Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359450A (en) * | 2019-07-29 | 2019-10-22 | 中铁二院工程集团有限责任公司 | Assembled circle pilework and construction method |
-
1996
- 1996-02-12 CN CN 96234238 patent/CN2260819Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359450A (en) * | 2019-07-29 | 2019-10-22 | 中铁二院工程集团有限责任公司 | Assembled circle pilework and construction method |
CN110359450B (en) * | 2019-07-29 | 2024-03-08 | 中铁二院工程集团有限责任公司 | Assembled round pile structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201883438U (en) | Pit-in-foundation-pit steel sheet pile foundation pit supporting structure | |
CN2647920Y (en) | Diagonal post supporting ground hole for construction | |
CN104294821A (en) | Pile forming method for confined reinforced cement soil pile | |
CN2260819Y (en) | Prefabricated short pile of reinforced concrete | |
CN202369993U (en) | Oppositely pulled type filling pile base pit supporting structure | |
CN213390202U (en) | Combined type polygonal tubular structure fan foundation | |
CN212656252U (en) | Novel transmission line tower foundation | |
CN2622250Y (en) | Built-up rammer | |
CN1259604A (en) | Cement earth reinforced composite piling method | |
CN2283679Y (en) | Tamping hammer | |
CN2153578Y (en) | High efficiency ground pile | |
CN202881932U (en) | Underwater mud pile | |
CN1970892A (en) | Prefabricated reinforced concrete under-reamed pile | |
CN201087402Y (en) | High bearing ability filling pile | |
CN206635772U (en) | Piling bar combined side slope supporting construction | |
CN111576469A (en) | Novel power transmission line tower foundation and construction method | |
CN103835290A (en) | Pile foundation structure suitable for marine soft soil and design method thereof | |
CN218880931U (en) | Composite pile suitable for soft foundation | |
CN213476947U (en) | Novel cup mouth foundation structure for bedrock geology | |
CN202577281U (en) | Forming device for multi-pipe encircled cement maintenance body | |
CN2343204Y (en) | Inverted-cone pile | |
CN102660953A (en) | Moulding equipment and construction method of multitube surrounded-connecting cement maintaining body | |
CN1320215C (en) | Method for making foundation piles in high embankment region | |
CN1243159C (en) | Concrete pile foundation constructing technology and equipment | |
CN221255457U (en) | Implanted precast pile suitable for household garbage incineration power generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |