CN2241147Y - Apparatus for production of slag glass ceramics sheet - Google Patents
Apparatus for production of slag glass ceramics sheet Download PDFInfo
- Publication number
- CN2241147Y CN2241147Y CN 95218666 CN95218666U CN2241147Y CN 2241147 Y CN2241147 Y CN 2241147Y CN 95218666 CN95218666 CN 95218666 CN 95218666 U CN95218666 U CN 95218666U CN 2241147 Y CN2241147 Y CN 2241147Y
- Authority
- CN
- China
- Prior art keywords
- district
- pond
- brick
- kiln
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a slag nucleated glass plate device which uses a continuous calendering method for production, particularly a slag nucleated glass plate device. The device is composed of a feeding mechanism, a unit kiln, a special feeding track mechanism, a calendering mechanism, a movable roller table, etc. The device improves the unit kiln, and is additionally provided with the special feeding track mechanism which is composed of a first zone, a second zone and a third zone. The first zone can cause glass liquid to be in standing, the second zone can cause the glass liquid to be effectively slowed and cooled, and the third zone can cause the glass liquid cause to be effectively kept heat. The device can produce nucleated glass plates with high quality.
Description
The utility model relates to a kind of device with continuous calendering method production slag nucleated glass plate, i.e. slag nucleated glass plate production equipment.
What existing slag nucleated glass plate production was adopted is that unit kiln is founded and the pair roller calendaring molding.When glass metal flows to the rolling press moulding, its middle part temperature, if too high, could moulding; If high slightly or reach mold temperature, limit portion temperature has been lower than or has been significantly less than mold temperature so.Because the mold temperature and the crystallization upper limit only differ 30 ℃-50 ℃, at this moment limit portion has been lower than the crystallization upper limit, and limit portion, bottom have begun crystallization, and caking also spreads very soon gradually, makes whole holder brick glass fluid stream knot dead, and calendering formation can't be carried out continuously.94213741.8 pairs of rolling press fronts of Chinese patent, holder brick and overflow port structure are improved, promptly lift the dam shape holder brick of the longitudinal section approximate trapezoid that graphite of increase is made on the brick at rolling press, its inclination angle to the pressure roller direction is 15 °-45 °, simultaneously at the upper and lower well heater of setting up more than two of overflow port.But also there are some problems in this patent: the one,, the easy oxidation of graphite brick, in case should place's graphite support brick scaling loss, calendering will be ended immediately, can not guarantee that the production steady and continuous carries out; The 2nd,, this patent has still adopted unit kiln to found, and can't found out high-quality glass; The 3rd,, overflow port is communicated with Dayao, so operating mode interacts, and it is to cause one of reason that strip bursts that mold temperature fluctuates with the Dayao fluctuation of operating conditions.Chinese patent 942123727 discloses the fervent linkage system of a kind of microcrystal glass plate, this device is used for temperature of glass liquid and exceeds much than mold temperature, and strip is to connect to press, and does not have under the production status of typing, moulding, this operating mode is non-ordinary production operating mode, so this patent has limitation.
The purpose of this utility model is: provide a kind of glass metal that can make to leave standstill, lower the temperature, be incubated and be effectively controlled, glass metal crystallization not in the time of making calendering can be produced the slag nucleated glass plate production equipment of qualified crystallizing glass sheet material continuously and stably.
Realize that the above-mentioned purpose technical solution is as follows:
The slag nucleated glass plate production equipment, form by batch charging mechanism (1), unit kiln (2), special-purpose supply channel mechanism (3), calendering mechanism (4), moving roil table (5), crystallization kiln (6), rollgang (7) and double-pole longitudinal cutter structure (8), it is characterized in that:
End in A, unit kiln (2) pond is established a weir (2-3), and the width between centers of itself and adjacent weir (3-11) is less than 6m, and the pond between two weirs is dark less than the pond at other positions of unit kiln (2) deeply;
B, special-purpose supply channel mechanism are made up of I district, II district and III district,
(a), in unit kiln (2) and junction, I district, in the pond, be provided with weir (3-11), top, pond is provided with short arch ring (3-10), top, I district is provided with well heater (3-13) and the temperature instrumentation (3-1) more than two, in its pond two survey uniform 2 pairs with top electrode (3-12), wherein pair of electrodes is located at below the dog-hole working hole, and dog-hole top is provided with temperature measuring gauge (3-2);
(b), be provided with dog-hole front arch (3-14) and barricade (3-15) in I district and junction, II district; Be provided with two with upper heater (3-3) and temperature instrumentation (3-4) on top, II district; In the pond, its underpart uniform two pairs with top electrode (3-16), be provided with temperature instrumentation (3-5); Available floater guide block, barricade are separated several little warm areas in the II district as required.
(c), be provided with a grade brick (3-7) and shelves wall (3-18) in II district and junction, III district; Be provided with two on top, III district and (3-8), and be provided with temperature instrumentation (3-7), the glass metal heating of the ad hoc opposite side of well heater (3-8) portion with upper heater (3-6); Uniform a pair of with top electrode (3-19) in the pond, III district, the pond port is provided with floater guide block (3-20), and the last end distance pool wall top distance of floater guide block (3-20) is greater than 20mm;
C, calendering mechanism are made of lower roll (4-1), top roll (4-2), limit brick (4-3) and holder brick (4-4), it is the arc or the polygonal edge of a knife (4-5) that top roll (4-2) external cylindrical surface upper edge one generatrix direction is provided with a transverse section, the height of the edge of a knife (4-5) is less than the microcrystal glass plate tape thickness, and the edge of a knife (4-5) two ends and top roll (4-2) two ends are equidistant; Holder brick (4-4) transverse section is for being the right angle tetragon of camber line on one side, and the inclined-plane and the horizontal sextant angle of holder brick are 45 °-60 °, and cambered surface is close to lower roll (4-1) periphery;
D, double-pole longitudinal cutter structure are made up of chain and pan conveyor (8-1) and cutting facility (8-2).
Advantage with several aspects of the present utility model:
One, adopts in the unit kiln pond end to establish a weir, melting end and fining end are separated, stoped unclean bottom glass to flow into dog-hole, make glass metal clarification substantially before entering special-purpose supply channel mechanism.
Two, the setting of special-purpose supply channel mechanism, make unit kiln improve the condition of founding, in the I district glass metal is left standstill, the dog-hole front arch has blocked scum silica frost and material skin effectively, glass metal stream not only obtains clarifying homogenizing but also remove the material skin, and the II district can make glass metal obtain effectively lowering the temperature at a slow speed, and the III district can make glass metal obtain insulation, and both sides and middle portion temperature difference are reduced, temperature of glass liquid can effectively be controlled in the processing requirement scope.
Three, the improvement of calendering mechanism structure makes when calendering glass metal crystallization not, thereby makes continuous calendering accomplished.
Four, because the edge of a knife of calendering top roll periodically rolls strip to go out " zanjon ", again through the cutting of double-pole longitudinal cutter structure, the kiln tail can be produced to steady and continuous the qualified sheet material that specification is arranged.
Accompanying drawing 1 is a structural representation of the present utility model,
Accompanying drawing 2 is special-purpose supply channel mechanism structure synoptic diagram,
Accompanying drawing 3 is a calendering formation mechanism structure synoptic diagram.
Below in conjunction with drawings and Examples the utility model is described further.
Admixtion is put into giving in the 2-1 of molten bath of unit kiln 2 by charging device 1, gives 2-1 both sides, molten bath and a pair of well heater 2-4 is housed to admixtion reinforcement heating, makes this place's temperature all reach processing requirement, makes admixtion accelerate fusing.Unit kiln 2 front portions have horizontal flue 2-2 will give the molten bath to separate, the rear portion again with special-purpose supply channel system partitioning, full kiln is implemented all risk insurance temperature, has improved the condition of founding.End in unit kiln 2 ponds is provided with weir 2-3, and melting end and fining end are separated, and has stoped unclean bottom glass to flow into dog-hole, enters forming section.
Clarifying substantially glass metal enters special-purpose supply channel mechanism in weir 3-11 place's overflow.Special use supply channel mechanism is made up of I district, II district and III district.Less than 6m, the pond between two weirs is dark less than the pond at unit kiln 2 other positions deeply apart from the distance of the weir 2-3 of unit kiln 2 ends for the weir 3-11 of unit kiln 2 and junction, I district.Well heater 3-13 and temperature instrumentation 3-1 more than two are housed on top, I district, in its pond both sides uniform two pairs with top electrode 3-12, wherein pair of electrodes is contained in below the dog-hole working hole.Heating by electrode 3-12 in upper portion heater 3-13 and the pond has changed the liquid properties of flow, has eliminated liquid stream dead angle, and glass metal is left standstill, and obtains further clarification and homogenization.Enter the II district by further clarifying high temp glass liquid through dog-hole.
On the top of ingress, II district dog-hole front arch 3-14 is housed, its role is to block effectively scum silica frost, baffle plate 3-15 is equipped with on the top of front arch 3-14, and the two effect is that II district and I district, Dayao are separated fully.Glass metal simultaneously under dog-hole front arch 3-14, the heated by electrodes (see figure 2) is housed, so can not freeze at this.Well heater 3-3 and temperature instrumentation 3-4 are equipped with in top, II district in addition, in its pond uniform two pairs with top electrode 3-16 and temperature instrumentation 3-5.Reduce to the temperature of process stipulation lentamente by high temperature at II district glass metal, also can it be divided into several sub-districts as required, control cooling better with shelves brick, barricade.Cooled glass metal flows into the III district down by floater guide block 3-17.
III district and II differentiation are isolated by shelves brick 3-17 and shelves wall 3-18 in ingress, III district.Electrode 3-19 is controlled in the desired temperature range of moulding the glass metal that flows into this district effectively in the well heater 3-6 on top, III district and the pond, particularly top, III district ad hoc well heater 3-8 opposite side portion heating is controlled in allowed limits the temperature difference of limit portion temperature and middle part temperature effectively.Thereby make the preceding glass metal of moulding reach the chemical uniformity and the thermal uniformity of processing requirement.III district exit end is provided with a grade brick 3-20, and the last end distance top pool wall distance of shelves brick 3-20 is greater than 20mm.Glass metal stream enters calendaring molding mechanism by shelves brick 3-20 overflow.
Glass metal stream descends along 45 °~60 ° the inclined-plane that holds in the palm brick 4-4, and between through top roll 4-2 and the lower roll 4-1, upper and lower roll cools off glass metal rapidly, and with its pulling, is pressed into strip and pulls away.Because holder brick 4-4 bevel angle is big, glass metal is extremely short in this residence time, has little time crystallization and is promptly pulled away.It is arc or polygonal small lugs edge of a knife 4-5 that top roll 4-2 external cylindrical surface upper edge one generatrix direction is provided with a transverse section, and the height of small lugs edge of a knife 4-5 is less than the microcrystal glass plate tape thickness, and small lugs edge of a knife 4-5 two ends and top roll 4-2 two ends are equidistant.Under small lugs edge of a knife 4-5 calendering, form groove on the glass strip 9, prepare for follow-up cutting.
Claims (1)
1, slag nucleated glass plate production equipment, form by batch charging mechanism (1), unit kiln (2), special-purpose supply channel mechanism (3), calendering mechanism (4), moving roil table (5), crystallization kiln (6), rollgang (7) and double-pole longitudinal cutter structure (8), it is characterized in that:
End in A, unit kiln (2) pond is established-weir (2-3), and the width between centers of itself and adjacent weir (3-11) is less than 6m, and the pond between two weirs is dark less than the pond at other positions of unit kiln (2) deeply;
B, special-purpose supply channel mechanism are made up of I district, II district and III district,
(a), in unit kiln (2) and junction, I district, in the pond, be provided with weir (3-11), top, pond is provided with short arch ring (3-10), top, I district is provided with well heater (3-13) and the temperature instrumentation (3-1) more than two, in its pond two survey uniform 2 pairs with top electrode (3-12), wherein pair of electrodes is located at below the dog-hole working hole, and dog-hole top is provided with temperature measuring gauge (3-2);
(b), be provided with dog-hole front arch (3-14) and barricade (3-15) in I district and junction, II district, be provided with two with upper heater (3-3) and temperature instrumentation (3-4) on top, II district, in the pond, its underpart uniform two pairs with top electrode (3-16), be provided with temperature instrumentation 3-5)
(c), be provided with a grade brick (3-17) and shelves wall (3-18) in II district and junction, III district; Be provided with two on III top and (3-8), and be provided with temperature instrumentation (3-7) with upper heater (3-6); Uniform a pair of with top electrode (3-19) in the pond, III district, the pond port is provided with floater guide block (3-20), and the last end distance pool wall top distance of floater guide block (3-20) is greater than 20mm;
C, calendering mechanism are by lower roll (4-1), top roll (4-2), limit brick (4-3) and holder brick (4-4) constitute, it is the arc or the polygonal edge of a knife (4-5) that top roll (4-2) external cylindrical surface upper edge one generatrix direction is provided with a transverse section, the height of the edge of a knife (4-5) is less than the microcrystal glass plate tape thickness, and the edge of a knife (4-5) two ends and top roll (4-2) two ends are equidistant; Holder brick (4-4) transverse section is for being the right angle tetragon of camber line on one side, and the inclined-plane and the horizontal sextant angle of holder brick are 45 °~60 °, and cambered surface is close to the lower roll periphery;
D, double-pole longitudinal cutter structure are made up of chain and pan conveyor (8-1) and cutting facility (8-2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95218666 CN2241147Y (en) | 1995-07-25 | 1995-07-25 | Apparatus for production of slag glass ceramics sheet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95218666 CN2241147Y (en) | 1995-07-25 | 1995-07-25 | Apparatus for production of slag glass ceramics sheet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2241147Y true CN2241147Y (en) | 1996-11-27 |
Family
ID=33867118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 95218666 Expired - Fee Related CN2241147Y (en) | 1995-07-25 | 1995-07-25 | Apparatus for production of slag glass ceramics sheet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2241147Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101787786A (en) * | 2010-02-10 | 2010-07-28 | 姚桂龙 | Preparation method of non-porous nano crystalline glass ground decoration tile |
CN103771684A (en) * | 2012-10-18 | 2014-05-07 | 温州市康尔微晶器皿有限公司 | Microcrystalline glass unit kiln total-oxygen electric-boosting melting technology |
-
1995
- 1995-07-25 CN CN 95218666 patent/CN2241147Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101787786A (en) * | 2010-02-10 | 2010-07-28 | 姚桂龙 | Preparation method of non-porous nano crystalline glass ground decoration tile |
CN103771684A (en) * | 2012-10-18 | 2014-05-07 | 温州市康尔微晶器皿有限公司 | Microcrystalline glass unit kiln total-oxygen electric-boosting melting technology |
CN103771684B (en) * | 2012-10-18 | 2016-04-20 | 温州市康尔微晶器皿有限公司 | A kind of devitrified glass unit kiln total oxygen electricity fusing-aid melting technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3241939A (en) | Method of manufacture of flat glass | |
CN201261063Y (en) | Pouring apparatus for cast-rolling of twin-roll thin strip | |
CN2241147Y (en) | Apparatus for production of slag glass ceramics sheet | |
US3770407A (en) | Glass manufacturing methods | |
CN1012471B (en) | Pouring device for double-roll type conticaster | |
CN111195715A (en) | Full vacuum continuous casting device for producing high-purity metal rod by continuous feeding | |
CN2775046Y (en) | Glass fusing kiln capable of realizing two kinds of glass forming process | |
DE2462148B2 (en) | DEVICE FOR PRODUCING AN ENDLESS GLASS RIBBON | |
CN111792821A (en) | Process for producing large-size quartz cylinder by continuous melting method, quartz cylinder and application of quartz cylinder | |
US3289257A (en) | Continuous casting mold having ribs | |
EP0275533A1 (en) | Vertical delivery arrangement for float glass process | |
CN115784576A (en) | Spreading forming equipment, production equipment and spreading forming process for special glass | |
CN103553301B (en) | Production method of high-zebra-angle 2mm automobile float glass | |
CN112743057A (en) | Horizontal continuous casting furnace set for red copper bar blank | |
CN106480323B (en) | A kind of up-drawing method is continuously segregated the device and its method of purification of purification refined aluminium | |
CN212127955U (en) | Device for removing scum of float glass melting furnace | |
US3679389A (en) | Method and apparatus for the manufacture of flat glass | |
CN213469740U (en) | Double-acting type suspension billet hydraulic shear for blast furnace steel shearing machine | |
US3928012A (en) | Method and apparatus for regulating the temperature of a glass sheet float tank | |
CN113830994A (en) | Kiln for producing high-quality photovoltaic glass and novel calendaring molding overflow port | |
CN2326597Y (en) | Falls-type continuous rolling formation apparatus | |
CN107840561B (en) | Glass extrusion type secondary pulling plate forming device and method thereof | |
CN109133583B (en) | Production process of touch screen glass | |
CN220149451U (en) | Four-roller glass ceramic calender | |
CN112414130B (en) | Aluminum melting furnace control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |