Prior art keywords
cross bar
scaffold
adjustable
rod
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95246154
Other languages
Chinese (zh)
Inventor
胡颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95246154 priority Critical patent/CN2234984Y/en
Application granted granted Critical
Publication of CN2234984Y publication Critical patent/CN2234984Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a multi-function steel pipe scaffold, composed of an upright post, a transverse rod, an adjustable tie rod, an adjustable supporting seat, a spacing transverse bar, a special transverse rod for formworks, etc. The utility model is characterized in that the adjustable tie rod comprises a casing tube and a telescopic rod; one end of the casing tube is provided with a clamping sleeve; an expansion pipe is inserted in the casing tube and fixed by the clamping sleeve; simultaneously the casing tube, the expansion pipe and fasteners can also rotate correspondingly by taking a central rivet as a pivot shaft. The adjustable tie rod can randomly be connected with scaffold rods to complete the horizontal inclined support and the space inclined support; the bowl-buckled type steel pipe scaffold and other common steel pipe scaffolds can be mutually connected; the stability of the scaffold is enhanced; the safety of the construction is guaranteed.

Description

Multifunctional bowl button steel pipe scaffold
The utility model relates to the steel pipe scaffold of the realm of building construction, particularly a kind of multifunctional bowl button steel pipe scaffold.
Existing bowl fastening type steel pipe scaffold, owing to can only connect 4 cross bars or brace simultaneously on each bowl snapping head, brace can not be arranged on the node sometimes owing to this restriction.In addition, existing bowl fastening type steel pipe scaffold can only be made the lateral plane diagonal brace, can not make space or horizontal plane diagonal brace, thereby causes the poor stability of scaffold, even distortion is collapsed.Bracing frame as the Fig. 9 in the application number 86201080U patent specification is a geometrically unstable system, under the effect of horizontal force with easy deformation even collapse.The cross bar of this scaffold can not be regulated vertical pole ' s span arbitrarily owing to be normalization simultaneously.In addition, when this bowl fastening type scaffold and other steel pipe scaffold interconnected, its spacing was not necessarily determined, therefore brings certain trouble to construction.
The purpose of this utility model provides and a kind ofly can make adjustable tie-rod both can make adjustable brace, also can make adjustable cross bar, both adjustable length simultaneously, and adjustable angle again can strengthen the resistance to overturning of scaffold, guarantees the steel pipe scaffold of construction safety.
The purpose of this utility model is achieved by the following scheme: the adjustable tie-rod of this scaffold comprises sleeve pipe, telescoping tube, and sleeve pipe one end is provided with gripping sleeve, and telescoping tube inserts sleeve pipe and fixes by gripping sleeve.The end of sleeve pipe and telescoping tube is flat-shaped, with center rivet itself and fastener is fused, simultaneously still can center rivet between sleeve pipe, telescoping tube and the fastener to be that pivot is relative rotate.The locking device of said gripping sleeve and fastener can be a bolt type, also can be Wedge-type.
The special-purpose cross bar of formwork of the present utility model is at the two ends of shaped steel or light-gauge steel section the cross bar joint to be set to form, and can replace former cross bar and wooden frame.
Inter cross bar of the present utility model two ends are connected to the n shaped steel plate, wherein have the n shaped steel plate of an end to have breach, can guarantee that when scaffold vertically is provided with Inter cross bar Inter cross bar needn't interlock and set up, and can be arranged to straight line.
The utility model compared with prior art has reasonable in designly, easy to operate, meets the actual requirement of construction, can improve the total bearing capacity of scaffold, guarantees construction safety.In addition, the utility model is designed to adjustable tie-rod both can adjust length, can adjust angle again, can bear the active force that stretches and compress.Simultaneously both adjustable brace can be made, adjustable cross bar can be made again.During as adjustable brace, it can be connected in the scaffold rod member at any time, finishes horizontal plane diagonal brace or space diagonal brace.During as adjustable cross bar, it can regulate vertical pole ' s span arbitrarily, and bowl fastening type steel pipe scaffold and other common steel tube scaffold are interconnected.Thereby remedied deficiency of the prior art, strengthened the resistance to overturning of scaffold.
Below in conjunction with accompanying drawing the utility model is illustrated.
Fig. 1 is the special-purpose cross bar schematic diagram of beam forms support applications formwork
Fig. 2 is with adjustable tie-rod connection fastener formula steel pipe scaffold schematic diagram;
Fig. 3 is adjustable tie-rod schematic diagram;
Fig. 4 is another embodiment schematic diagram of Fig. 3;
Fig. 5 is the Inter cross bar schematic diagram;
Fig. 6 is the vertical view of Fig. 5;
Fig. 7 is that the adjustable tie-rod of bracing frame of the present utility model is arranged schematic diagram;
Fig. 8 is the vertical view of Fig. 7;
Fig. 9 is the special-purpose cross bar schematic diagram of formwork.
Embodiment: as Fig. 1 to Fig. 9, the utility model is made of a plurality of unit constructions, by vertical rod 1, cross bar 2, adjustable tie-rod 3, adjustable seats 4, the special-purpose cross bar 5 of formwork, attached members such as Inter cross bar 6 and scaffold floor, protective screening, railing, pitman are formed jointly respectively for it.Wherein the adjustable tie-rod 3 shown in Fig. 3,4 comprises sleeve pipe 3-2, telescoping tube 3-4, and sleeve pipe 3-2 one end is provided with gripping sleeve 3-3, and telescoping tube 3-4 inserts in the sleeve pipe 3-2, is fixedly clamped by gripping sleeve 3-3 after adjusting length.The end of sleeve pipe 3-2 and telescoping tube 3-4 is flat-shaped, can be convenient to rivet 3-5 and fastener 3-1 fuses, simultaneously still can center rivet 3-5 between sleeve pipe 3-2, telescoping tube 3-4 and the fastener 3-1 to be that pivot is relative rotate, to satisfy the requirement of installation different angles.During installation, fastener 3-1 can be locked on vertical rod 1 or the cross bar 2, the locking device of gripping sleeve and fastener can be a bolt type, as shown in Figure 3, also can be Wedge-type, as shown in Figure 4.When this locking device adopts bolt type, then tighten the nut 3-6 on the fastener 3-1, the fastener fastening is good with length adjustment then, tighten the bolt 3-6 on the gripping sleeve 3-3, with gripping sleeve telescoping tube 3-4 is clamped and get final product (see figure 3).When locking device adopts Wedge-type, then hammer the voussoir on the clasp into shape, with the fastener fastening, adjust length, hammer grips the voussoir 3-6 that tightly puts, and with gripping sleeve telescoping tube 3-4 is clamped and gets final product (see figure 4).This is adjustable, and tie-rod 3 promptly can be adjusted its length, can adjust angle again, can bear the active force of Compression and Expansion.Simultaneously can make adjustable brace or adjustable cross bar.As adjustable brace, it can be connected in the scaffold rod member at any time, can make plane diagonal brace or space diagonal brace, as Fig. 7, shown in Figure 8.As adjustable cross bar, it can regulate the spacing of vertical rod 1 arbitrarily, and bowl fastening type steel pipe scaffold and other steel pipe scaffold are interconnected, as shown in Figure 2.Thereby remedied the deficiency of existing bowl fastening type steel pipe scaffold.
As shown in Figure 9: the special-purpose cross bar 5 of formwork can be given full play to down the bearing capacity of bowl button, provides a kind of simple and efficient and economic important component for the template in the building operations supports.Special-purpose cross bar 5 usefulness shaped steel of this formwork or light-gauge steel section constitute, and the two ends of shaped steel 5-2 are provided with cross bar joint 5-1 becomes the special-purpose cross bar 5 of formwork.This cross bar can replace former cross bar 2 and wooden frame, and a thing dual-purpose and bearing capacity are big, as shown in Figure 1.
In the building operations of southern area, the common practice is that scaffold floor is erected on vertical cross bar, so Inter cross bar need vertically be set.These Inter cross bar 6 two ends are provided with the n shaped steel plate, wherein have the n shaped steel plate of an end to have breach, can allow the n shaped steel plate of another Inter cross bar 6 inject this breach, make Inter cross bar 6 be straight line when vertically setting up, shown in Fig. 5,6.Like this, scaffold floor just can be set up on the center line of Inter cross bar, makes this scaffold floor stressed even and firm, guarantees construction safety.

Claims (5)

1, a kind of multifunctional bowl button steel pipe scaffold, by vertical rod (1), cross bar (2), adjustable tie-rod (3), adjustable seats (4), the special-purpose cross bar (5) of formwork, Inter cross bar (6) and scaffold floor, protective screening, railing, attached member such as pitman is formed, it is characterized in that: said adjustable tie-rod (3) comprises sleeve pipe (3-2), telescoping tube (3-4), sleeve pipe (3-2) end is provided with gripping sleeve (3-3), one end of telescoping tube (3-4) inserts in the sleeve pipe (3-2) fixing by gripping sleeve (3-3), sleeve pipe (3-2) is flat-shaped with the end of telescoping tube (3-4), center rivet (3-5) is passed sleeve pipe (3-2) telescoping tube (3-4) and is fused with fastener (3-1), simultaneously sleeve pipe, still can center rivet between telescoping tube and the fastener to be that pivot is relative rotate.
2, steel pipe scaffold according to claim 1 is characterized in that: the gripping sleeve (3-3) in the said adjustable tie-rod (3) and the locking device (3-6) of fastener (3-1) can be bolt types, also can be Wedge-types.
3, steel pipe scaffold according to claim 1 is characterized in that: said adjustable tie-rod (3) both can be made adjustable cross bar, can make adjustable brace again.
4, scaffold according to claim 1 is characterized in that: the special-purpose cross bar of said formwork (5) adopts shaped steel or light-gauge steel section, a cross bar joint (5-1) is set respectively and constitutes special-purpose cross bar (5) at shaped steel (5-2) two ends.
5, steel pipe scaffold according to claim 1, it is characterized in that: Inter cross bar (6) two ends are provided with the n shaped steel plate, wherein there is the n shaped steel plate of an end to have breach, can guarantees that Inter cross bar can be arranged to straight line when scaffold vertically is provided with Inter cross bar (5).
CN 95246154 1995-10-27 1995-10-27 Multi-function steel pipe scaffold Expired - Fee Related CN2234984Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95246154 CN2234984Y (en) 1995-10-27 1995-10-27 Multi-function steel pipe scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95246154 CN2234984Y (en) 1995-10-27 1995-10-27 Multi-function steel pipe scaffold

Publications (1)

Publication Number Publication Date
CN2234984Y true CN2234984Y (en) 1996-09-11

Family

ID=33885784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95246154 Expired - Fee Related CN2234984Y (en) 1995-10-27 1995-10-27 Multi-function steel pipe scaffold

Country Status (1)

Country Link
CN (1) CN2234984Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351430A (en) * 2016-10-14 2017-01-25 天津大学 Truss-reinforced type fastener steel tube scaffolding
CN108868113A (en) * 2018-08-28 2018-11-23 广州云奇科技有限公司 Disk buckle type scaffold is fixedly connected device
CN113756574A (en) * 2021-10-11 2021-12-07 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351430A (en) * 2016-10-14 2017-01-25 天津大学 Truss-reinforced type fastener steel tube scaffolding
CN108868113A (en) * 2018-08-28 2018-11-23 广州云奇科技有限公司 Disk buckle type scaffold is fixedly connected device
CN113756574A (en) * 2021-10-11 2021-12-07 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method
CN113756574B (en) * 2021-10-11 2022-04-22 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method

Similar Documents

Publication Publication Date Title
US7165361B2 (en) Building construction shores
CN214834751U (en) High-rise concrete batter post structure die carrier supports and connection structure
CN2234984Y (en) Multi-function steel pipe scaffold
CN107975251A (en) A kind of assembled architecture wallboard combines support device
CN220150526U (en) Reinforced steel structure
CN110714603A (en) Steel pipe and steel rope composite scaffold system and construction method thereof
CN2194949Y (en) Insertion built-up scaffold
CN114182646B (en) Assembled ladder cage buttress with adjustable length
CN215484679U (en) High-support template structure
AU593011B2 (en) Space frames
CN214462703U (en) Be used for construction steel bar ligature work platform
CN108643561B (en) Building carrier plate draws bearing structure to one side
CN212078597U (en) Combined building scaffold
CN219710964U (en) Supporting structure of cast-in-situ floor
CN208152356U (en) A kind of rack smallpox cell cube system
CN212880905U (en) Portable ball net rack
CN215564254U (en) Scaffold frame that construction was used
CN219081073U (en) Assembled externally hung protection system
CN217079634U (en) Support structure for lower support and vertical rod of scaffold
CN217028203U (en) Side-mounted adjustable telescopic tool type guardrail
JPH0618977Y2 (en) Angle adjustable scaffolding
CN221194255U (en) Anti-toppling structure of frame body for building beam formwork
CN221073408U (en) Scaffold is detained to dish of adjustable base
CN213330160U (en) Assembled steel construction floor bearing structure
CN216641629U (en) Simple and easy assembled canopy

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee