CN2229459Y - Improved high periodic wave heat treatment induction coil - Google Patents

Improved high periodic wave heat treatment induction coil Download PDF

Info

Publication number
CN2229459Y
CN2229459Y CN94243571U CN94243571U CN2229459Y CN 2229459 Y CN2229459 Y CN 2229459Y CN 94243571 U CN94243571 U CN 94243571U CN 94243571 U CN94243571 U CN 94243571U CN 2229459 Y CN2229459 Y CN 2229459Y
Authority
CN
China
Prior art keywords
ring portion
annular part
straight path
induction coil
straight way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN94243571U
Other languages
Chinese (zh)
Inventor
张平雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN94243571U priority Critical patent/CN2229459Y/en
Application granted granted Critical
Publication of CN2229459Y publication Critical patent/CN2229459Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The utility model discloses an improved high periodic wave heat treatment induction coil. A distance taken from one end of an induction coil can carry out the torsion so as to form an upper annular part; the upper annular part can extend a distance downwards and inwards so as to form a first straight path; the bottom end of the first straight path can be bent into a lower annular part parallel to the upper annular part; the outside of the upper annular part and the lower annular part are respectively provided with a plurality of water jet holes according to the equal distance; the lower annular part can extend a distance upwards and inwards so as to form a second straight path; the second straight path can pass through the upper annular part to the other end of the induction coil; the second straight path is drilled with a plurality of water jet holes whose water jet direction faces to the first straight path; thereby, the utility model can once complete the high periodic wave heat treatment in two different area segments for the inner part of a hollow working component; therefore, the utility model can reach the effect of saving working time, reducing processing program, and lowering fraction defective of products.

Description

A kind of improved high frequency thermal treatment ruhmkorff coil
The utility model provides a kind of improved high frequency thermal treatment ruhmkorff coil, especially refers to a kind of hollow work-piece (as tubular body arranged inside, cylindrical body workpiece) internal fixation section be carried out the improvement of the heat treated ruhmkorff coil structure of high frequency surface hardening.
Usually the actuated element in mechanical; must make with shock-resistant with tough steel; but the contacted part of actuated element is wear-resistant again; can't reach this two kinds of requirements simultaneously with common heat treating method, have only and use the good steel of toughness and make its surface hardening just can reach this purpose.In all multi-methods of surface hardening, the induction hardening method is because control is easy, and speed reaches cleanliness of operation soon, and does not change the Chemical Composition of material surface, is widely adopted in surface hardening.
The high frequency heating principle is the ruhmkorff coil that passes to the water coolant protection in the workpiece placed around; but the workpiece of contact hardening not; when logical high frequency electric current; the alternation flux can take place around the ruhmkorff coil; during this kind alternation flux feed-through material; can produce induced current in the material; be called eddy current, the direction of the primary current of its direction and circulation ruhmkorff coil is opposite, and the degree of depth of eddy current and the frequency of electric current are inversely proportional to; the frequency that is electric current is higher; then the degree of depth is more shallow, so eddy current concentrates on material surface, eddy current can be generated heat according to Ohm's law; and the material surface temperature is raise rapidly; when the high stagnation point scope of heating arrival material, this heats lowers gradually, therefore can not cause material overheated; water coolant quenches to material surface simultaneously, finishes surface hardening.
In general, in the time of will carrying out the surface hardening processing to the fixedly processing section of small hollow workpiece, need elder generation that the stage casing of ruhmkorff coil is surrounded into an annular, and outwards equidistantly offer several tiny spout holes at this ring part, when handling workpiece preparation surface hardened processing section is moved to the ring part in ruhmkorff coil stage casing, logical water coolant is protected in the ruhmkorff coil, pass to the high frequency electric current again, cut off the power supply when making this section be heated to proper temperature, the water coolant of blowing water hole ejection this moment promptly to this processing section Cooling Quenching, is finished surface hardening; If when also having the second processing section to handle in the same workpiece, then needing again second section to be moved to above-mentioned position handles again, so then become and to do twice high frequency processing, two different sections in the same workpiece can be finished surface hardening, though this mode is feasible, but, or omitted another section and carried out the surface hardening processing if in operation careless careless mistake then very easily causes substandard products.An end of ruhmkorff coil can be got certain distance for this reason and go up ring portion around Qu Chengyi, and go up certainly to stretch downwards in the ring portion and establish certain distance (spacing of desire processing section) formation first straight way, and in the bottom of first straight way around the Qu Chengyi following ring portion parallel with last ring portion, and in the outside of upper and lower ring portion each equidistantly is provided with several spout holes, and descend ring portion inwardly upwards to be provided with second straight way certainly and pass the other end of ring portion, make the neither same section in the same workpiece of its energy primary treatment to ruhmkorff coil.
But when our desire is carried out the surface hardening processing to workpiece, workpiece is moved the ring portion up and down that the section up and down that makes desire processing corresponds respectively to ruhmkorff coil, and the two ends of self-induction coil feed water coolant, logical again high frequency electric current is when ruhmkorff coil, after the water coolant major part of being injected by ruhmkorff coil upper end is introduced into and cools off ring portion, penetrate by last ring portion spout hole, to processing upper curtate cooling, only there is the water coolant of minute quantity to arrive first straight way it is cooled off; And by the water coolant that the ruhmkorff coil the other end injects, from the spout hole ejaculation of ring portion down, also can't cool off first straight way behind second straight way of flowing through.Because ruhmkorff coil itself is made by copper pipe, add and feed the high frequency electric current when handling, do not have enough water coolants first straight way is cooled off this moment, workpiece working position spatial restriction can't add cooling line in addition in addition, so often cause ruhmkorff coil in use first straight way partly melt down because of cooling off deficiency.For above-mentioned reasons, the utility model provides a kind of improved high frequency thermal treatment ruhmkorff coil.
The purpose of this utility model provides a kind of improved high frequency thermal treatment ruhmkorff coil, especially refer to a kind of hollow work-piece (as tubular body arranged inside, simple shape body workpiece) internal fixation section be carried out the heat treated ruhmkorff coil of high frequency surface hardening, can in hollow work-piece, once finish the high frequency surface hardening thermal treatment of two different sections, and reach the effect of saving man-hour, reducing work program and reduction product disqualification rate.
The purpose of this utility model is to realize like this, get distance ring portion on Qu Chengyi at an end of ruhmkorff coil, and go up ring portion certainly and inwardly stretch downwards and establish a distance and form first straight way, and in the bottom of first straight way around the Qu Chengyi following ring portion parallel with last ring portion, each equidistantly is provided with several spout holes in the outside of ring portion up and down, inwardly upwards establish tool second straight way from following ring portion and pass the other end of ring portion, be drilled with the spout hole of several water outlet directions on this second straight way towards first straight way to ruhmkorff coil.
Through this utility model after improving, can once finish the high frequency surface hardening thermal treatment of two different sections to miniature workpiece, and can reach the effect of saving man-hour, reducing work program, because of the generation of workpiece deformation has been avoided in the reduction of work program, thereby reduced the product disqualification rate.
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the utility model synoptic diagram.
Fig. 2 implements the state front view for the utility model.
Fig. 3 is the utility model vertical view
Fig. 4 is Fig. 2 partial enlarged drawing
Wherein: 23 times ring portions of ring portion 22 first straight ways, 24 second straight ways, 25 spout holes, 301 spout holes, 302 spout holes, 303 water coolants 40 on the workpiece 10 first processing sections 11 second processing sections 12 ruhmkorff coils 20 coils one end 201 coil the other ends 202
See also Fig. 1, Fig. 2, Fig. 3, Fig. 4, a kind of improved high frequency thermal treatment ruhmkorff coil of the utility model, its end 201 at ruhmkorff coil 20 is got segment distance ring portion 22 on Qu Chengyi, and go up ring portion 22 certainly and inwardly stretch downwards and establish the segment distance spacing of section (desire processing) and form first straight way 23, and in the bottom of first straight way 23 around the parallel following ring portion 24 of Qu Chengyi and last ring portion 22, and in ring portion 22 up and down, each equidistantly is provided with several spout holes 301 24 the outside, 302, and inwardly upwards establishing tool second straight way 25 passes the other end 202 of ring portion 22 to ruhmkorff coil 20 to descend ring portion 24 certainly, and is drilled with the spout hole 303 of several water outlet directions towards first straight way 23 on this second straight way 25.
But two different sections in the utility model primary treatment hollow work-piece in use, and the unlikely ruhmkorff coil that causes is because of cooling off the phenomenon that deficiency melts down, in the time will carrying out surface hardening and handle, workpiece 10 be moved and make the section 11 that to process workpiece 10,12 correspond respectively to the ring portion up and down 22 of ruhmkorff coil 20,24, and self-induction coil 20 201, water coolant 40 is injected at 202 two ends, feed the high frequency electric current again in ruhmkorff coil 20, water coolant 40 major parts that flowed into by 201 ends of ruhmkorff coil 20 this moment are introduced into and cool off after the ring portion 22, spout hole 301 by last ring portion 22 penetrates, to the first processing section, 11 Cooling Quenching, only there is the water coolant 40 of minute quantity to arrive first straight way 23 to its cooling, but simultaneously can be from the water spray of second straight way 25 also 303 directives, first straight way 23 to its cooling and other water coolant 40 still can arrive the following ring portion 24 that is positioned at bottom by the part of ruhmkorff coil 202 water coolants that end injects 40, and by spout hole 302 water outlets of ring portion 24 down, to the second processing section, 12 Cooling Quenching.

Claims (1)

1, a kind of improved high frequency thermal treatment ruhmkorff coil, be by get distance ring portion on Qu Chengyi at an end of ruhmkorff coil, and go up ring portion certainly and inwardly stretch downwards and establish a distance and form first straight way, and in the bottom of first straight way around the Qu Chengyi following ring portion parallel with last ring portion, each equidistantly is provided with several spout holes and forms in the outside of ring portion up and down, ring portion is inwardly upwards established tool second straight way and is passed the other end of ring portion to ruhmkorff coil under it is characterized in that certainly, is drilled with several holes towards first straight way on this second straight way.
CN94243571U 1994-11-07 1994-11-07 Improved high periodic wave heat treatment induction coil Expired - Fee Related CN2229459Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN94243571U CN2229459Y (en) 1994-11-07 1994-11-07 Improved high periodic wave heat treatment induction coil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN94243571U CN2229459Y (en) 1994-11-07 1994-11-07 Improved high periodic wave heat treatment induction coil

Publications (1)

Publication Number Publication Date
CN2229459Y true CN2229459Y (en) 1996-06-19

Family

ID=33849891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN94243571U Expired - Fee Related CN2229459Y (en) 1994-11-07 1994-11-07 Improved high periodic wave heat treatment induction coil

Country Status (1)

Country Link
CN (1) CN2229459Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104004893A (en) * 2013-02-25 2014-08-27 上银科技股份有限公司 Internal diameter quenching apparatus
CN106319163A (en) * 2016-10-27 2017-01-11 山东科技大学 Ultrasonic vibration-assisted screw induction hardening device and technique
CN108546802A (en) * 2018-05-23 2018-09-18 燕山大学 A kind of inner chamber body part underwater electromagnetic annealing device and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104004893A (en) * 2013-02-25 2014-08-27 上银科技股份有限公司 Internal diameter quenching apparatus
CN104004893B (en) * 2013-02-25 2016-04-13 上银科技股份有限公司 Internal diameter quenching device
CN106319163A (en) * 2016-10-27 2017-01-11 山东科技大学 Ultrasonic vibration-assisted screw induction hardening device and technique
CN108546802A (en) * 2018-05-23 2018-09-18 燕山大学 A kind of inner chamber body part underwater electromagnetic annealing device and method
CN108546802B (en) * 2018-05-23 2019-11-22 燕山大学 A kind of inner chamber body part underwater electromagnetic annealing device and method

Similar Documents

Publication Publication Date Title
CN102864294B (en) Method and device of local heat treatment for thin-walled tubular parts
JPS5817716B2 (en) Electric resistance welding equipment for manufacturing equipment for molten metal plated steel pipes
US4894501A (en) Method and apparatus for induction heating of gear teeth
US4855556A (en) Method and apparatus for hardening gears and similar workpieces
CN101448347B (en) Method for manufacturing induction coil used for medium frequency induction heating
US4637844A (en) Method for heat treating ferrous parts
CN104831018A (en) Surface hardening process of marine crankshaft
JP2006344421A (en) High frequency induction heating device
CN2229459Y (en) Improved high periodic wave heat treatment induction coil
CN104963225B (en) Many steel wire induction heating water cooling production lines
CN210916149U (en) Quenching inductor
JP2001234245A (en) High-frequency heating method for rack bar and high- frequency heating device
CN103074470A (en) Surface quenching sensor of small-diameter internal spline
US4715907A (en) Method for heat treating ferrous parts
CN101676412A (en) Novel quenching furnace
CN112961969A (en) Anti-cracking low-frequency quenching process for bolt for engineering machinery
JPH05148531A (en) Induction hardening device for work provided with flange
JP2006028589A (en) Hardening and tempering method with direct electric-conduction hardening apparatus
CN216919336U (en) Quenching inductor for inner hole of part with missing hole wall
JPS54118372A (en) Production of cold drawn steel pipe from electrically seamed steel pipe
CN115433813A (en) Quenching device for continuously heating internal spline for quenching machine tool
JPS60131114A (en) Gear producing device
CN219536348U (en) Intermediate frequency inductor of universal joint handle
JPS5839729A (en) Partial tempering method for carburized and hardened parts
CN210261892U (en) Preheating device of quenching machine tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee