China
Prior art keywords
guide rail
climbing
material platform
wall
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420159400.6U
Other languages
Chinese (zh)
Inventor
侯犇
李彪
瞿守杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202420159400.6U priority Critical patent/CN221609549U/en
Application granted granted Critical
Publication of CN221609549U publication Critical patent/CN221609549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses an assembled self-climbing material platform, which comprises a material platform, an anti-falling wall-attached support and a climbing guide rail, wherein the climbing guide rail is formed by assembling a plurality of climbing guide rail sections with equal length up and down, the climbing guide rail sections comprise a guide rail main body, guide rail connecting rods and platform mounting columns, the climbing guide rail is formed by combining a plurality of shorter climbing guide rail sections, when the whole equipment is disassembled, the climbing guide rail is only required to be lowered to be in contact with the ground through traction equipment, then reinforcing bolts on the lowermost climbing guide rail section are screwed out, the lowermost climbing guide rail section is pulled leftwards, all climbing guide rail sections can be taken out from bottom to top in sequence, and when the material platform is taken out, the material platform is lifted up by adopting a lifter, and then the material platform is taken out from the climbing guide rail section.

Description

Assembled self-climbing material platform
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to an assembled self-climbing material platform.
Background
The material platform is a temporary operation table and an operation frame which are often erected on a construction site and are generally used for material turnover. The existing material platform is inconvenient to install, the time of a tower crane is required to be occupied when climbing or descending, time and labor are wasted, construction progress is influenced, safety is not high, in order to solve the problem, some manufacturers design an assembled self-climbing material platform, a self-climbing function of the platform is achieved by arranging structures such as an anti-falling wall attaching support, a guide rail, a platform main body and a tractor, the guide rail is always in a spliced connection mode, the length of the existing guide rail corresponds to the height of a building layer, when the integral platform is detached, the integral platform is always required to be lifted up and taken down by using a tower crane (the guide rail in the assembled climbing material platform with an all-steel structure published by Chinese patent CN206971760U is assembled by adopting the mode), and the self-climbing function of the assembled self-climbing material platform cannot be utilized to achieve the detachment of the guide rail, so that the dependence on the tower crane is strong.
Disclosure of utility model
In order to solve the problems, the utility model discloses an assembled self-climbing material platform which is simple in structure, convenient to assemble and disassemble, high in safety, free of tower cranes in the whole process, and labor-saving and material-saving.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
The utility model provides an assembled self-climbing material platform, includes material platform, anti-falling attached wall support, climbing guide rail, the climbing guide rail is assembled from top to bottom by a plurality of equilong climbing guide rail sections and is formed, climbing guide rail section includes guide rail main part, guide rail connecting rod, platform erection column, the guide rail connecting rod sets up between guide rail main part, platform erection column, the outer wall of guide rail connecting rod has horizontal truss through bolt fixed mounting, two guide rail connecting rods are connected simultaneously at the front and back both ends of horizontal truss, the top fixed mounting of platform erection column has T type piece, the T type groove has been seted up on the left surface outer wall of platform erection column bottom, T type piece joint is in T type inslot, the countersink has been seted up in the front of platform erection column, countersink's inner wall threaded connection has the reinforcing bolt, the inner wall threaded connection of reinforcing bolt and T type piece, the bottom and the top fixed mounting of guide rail connecting rod have unable adjustment base, unable adjustment base passes through bolt fixedly connected with stiffener, the top and bottom of stiffener respectively with unable adjustment base on two climbing guide rail sections.
Further, the material platform includes the bearing bottom plate, the left end and the guide rail main part of bearing bottom plate are connected, the top of bearing bottom plate is provided with the guardrail through the bolt, the outer wall of guardrail passes through bolt fixedly connected with drop-down festival pole, the right-hand member of drop-down festival pole is provided with the pull-up festival pole, the right-hand member of pull-up festival pole passes through bolt and the guide rail festival outer wall fixed connection that climbs of the top.
Further, prevent weighing down and attach wall support including attaching the wall seat, attach wall seat fixed mounting on the building floor, it has the guide rail sliding seat through bolt fixed mounting to attach the left side outer wall of wall seat, guide rail sliding seat sliding sleeve establishes on the platform erection column, the outer wall threaded connection of guide rail sliding seat has the guide rail locking piece.
Further, a notch is formed in the edge of the front end of the reinforcing bolt, and the outer diameter of the front end of the reinforcing bolt is smaller than the inner diameter of the countersunk head groove.
Further, the connection part of the bearing bottom plate and the guide rail main body is provided with a platform locking block, and the pull-down joint rods are provided with a plurality of groups and are respectively positioned on the front and back outer walls of the guardrail.
Further, a traction seat is fixedly arranged on the outer wall of the right side of the horizontal truss, and the traction seat is connected with the output end of traction equipment.
The beneficial effects of the utility model are as follows:
When the whole equipment is disassembled, the climbing guide rail is only required to be lowered to be in contact with the ground through traction equipment, then reinforcing bolts on the bottommost climbing guide rail section are screwed out, the bottommost climbing guide rail section is pulled leftwards, all climbing guide rail sections can be taken out from bottom to top in sequence, when the material platform is taken out, the ground clearance of the material platform is smaller, and the material platform can be taken out from the climbing guide rail section after the material platform is jacked up by adopting a lifter;
2. The fixed base on two climbing guide rail sections is connected through the reinforcing rod, the connection strength between the upper climbing guide rail section and the lower climbing guide rail section is increased, and the reinforcing rod and the bolt on the fixed base can be taken down by using a tool when the climbing guide rail sections are disassembled.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the material platform according to the present utility model;
FIG. 3 is a schematic view of the right side view of the climbing rail and horizontal truss of the present utility model;
FIG. 4 is a schematic view of the structure of the climbing rail and anti-roll-off wall mount of the present utility model;
FIG. 5 is a schematic view of the structure of an exploded view of the attachment portion of the climbing rail of the present utility model;
Fig. 6 is a schematic structural view of the reinforcing rod of the present utility model.
List of drawing identifiers:
1. A material platform; 101. a bearing bottom plate; 102. guard bars; 103. a pull-down joint rod; 104. a pull-up joint rod; 2. anti-falling wall-attached support; 201. wall-attached base; 202. a guide rail sliding seat; 203. a guide rail locking block; 3. climbing the guide rail section; 301. a guide rail main body; 302. a guide rail connecting rod; 303. a platform mounting post; 4. a horizontal truss; 5. a platform locking piece; 6. a traction seat; 7. a T-shaped groove; 8. a T-shaped block; 9. reinforcing bolts; 10. a countersunk head groove; 11. a reinforcing rod; 12. and (5) fixing the base.
Detailed Description
The present utility model is further illustrated in the following drawings and detailed description, which are to be understood as being merely illustrative of the utility model and not limiting the scope of the utility model.
Referring to fig. 1-6, the assembled self-climbing material platform of the utility model comprises a material platform 1, an anti-falling wall-attaching support 2 and a climbing guide rail, wherein the climbing guide rail is formed by up-down assembling a plurality of climbing guide rail sections 3 with equal length, the climbing guide rail sections 3 comprise a guide rail main body 301, guide rail connecting rods 302 and platform mounting columns 303, the guide rail connecting rods 302 are arranged between the guide rail main body 301 and the platform mounting columns 303, the outer walls of the guide rail connecting rods 302 are fixedly provided with horizontal trusses 4 through bolts, the front ends and the rear ends of the horizontal trusses 4 are simultaneously connected with two guide rail connecting rods 302, the top ends of the platform mounting columns 303 are fixedly provided with T-shaped blocks 8, the left side surface outer walls of the bottom ends of the platform mounting columns 303 are provided with T-shaped grooves 7, the T-shaped blocks 8 are clamped in the T-shaped grooves 7, the front surfaces of the platform mounting columns 303 are provided with countersunk grooves 10, the inner walls of the countersunk grooves 10 are in threaded connection with reinforcing bolts 9, the outer wall of the reinforcing bolt 9 is in threaded connection with the inner wall of the T-shaped block 8, the bottom and the top of the guide rail connecting rod 302 are fixedly provided with a fixed base 12, the fixed base 12 is fixedly connected with a reinforcing rod 11 through bolts, the top and the bottom of the reinforcing rod 11 are respectively fixedly connected with the fixed bases 12 on the two climbing guide rail sections 3, the climbing guide rail is formed by combining a plurality of shorter climbing guide rail sections 3, when the whole equipment is disassembled, the climbing guide rail is only required to be lowered to be in contact with the ground through traction equipment, then the reinforcing bolt 9 on the lowest climbing guide rail section 3 is screwed out, then the lowest climbing guide rail section 3 is pulled leftwards, all the climbing guide rail sections 3 can be taken out sequentially from bottom to top, when the material platform 1 is taken out, the ground clearance of the material platform 1 is smaller, the lifting machine can be adopted to jack up the material platform 1 and then take out the material platform 1 from the climbing guide rail sections 3, a tower crane is not required to be used for lifting the whole equipment in the whole process, the fixed bases 12 on the two climbing guide rail sections 3 are connected through the reinforcing rods 11, the connection strength between the upper climbing guide rail section 3 and the lower climbing guide rail section 3 is increased, the reinforcing rods 11 and bolts on the fixed bases 12 can be removed by using tools when the climbing guide rail sections 3 are disassembled, the traction seat 6 is fixedly arranged on the outer wall of the right side of the horizontal truss 4, the traction seat 6 is connected with the output end of the traction equipment, the horizontal truss 4 is arranged to be used for connecting the two climbing guide rails on one hand, and on the other hand, the lifting truss can be used for connecting the climbing guide rails with the traction equipment together so that the traction equipment can pull the climbing guide rails to climb;
The material platform 1 comprises a bearing bottom plate 101, the left end of the bearing bottom plate 101 is connected with a guide rail main body 301, a guardrail 102 is arranged at the top of the bearing bottom plate 101 through bolts, a lower pull rod 103 is fixedly connected to the outer wall of the guardrail 102 through bolts, an upper pull rod 104 is arranged at the right end of the lower pull rod 103, the right end of the upper pull rod 104 is fixedly connected with the outer wall of the uppermost climbing guide rail section 3 through bolts, the guardrail 102 is used for protecting materials on the bearing bottom plate 101, the guardrail 102 is connected with the bearing bottom plate 101 through bolts, the guardrail 102 is detachable, the lower pull rod 103 and the upper pull rod 104 are arranged for increasing the connection part of the material platform 1 and the climbing guide rail section 3, a platform locking piece 5 is arranged at the connection part of the bearing bottom plate 101 and the guide rail main body 301, a plurality of groups of lower pull rods 103 are arranged for ensuring the fixed connection of the material platform 1 and the climbing guide rail section 3, the material platform 1 and the climbing guide rail section 3 are prevented from sliding relatively, the lower pull rods 103 are respectively arranged on the front surface and the outer wall of the guardrail 102, the lower pull rods 103 are symmetrically arranged for providing the material platform 1 and the material platform 1 to fall off;
The anti-falling wall attaching support 2 comprises a wall attaching base 201, wherein the wall attaching base 201 is fixedly installed on a building floor, a guide rail sliding base 202 is fixedly installed on the left side outer wall of the wall attaching base 201 through bolts, the guide rail sliding base 202 is slidably sleeved on a platform installation column 303, guide rail locking blocks 203 are connected to the outer wall of the guide rail sliding base 202 in a threaded mode, the detachable guide rail sliding base 202 is arranged to enable the guide rail sliding base 202 to be directly detached when the climbing guide rail section 3 is detached, the climbing guide rail section 3 can be pulled horizontally, the guide rail locking blocks 203 are arranged to enable the climbing guide rail section 3 to be fixed with the guide rail sliding base 202 through the guide rail locking blocks 203 when climbing guide rail section 3 is not pulled by traction equipment, and accordingly falling of the climbing guide rail section 3 is avoided;
The front end edge of the reinforcing bolt 9 is provided with a notch, the outer diameter of the front end of the reinforcing bolt 9 is smaller than the inner diameter of the countersunk head groove 10, so that the front end of the reinforcing bolt 9 can extend into the countersunk head groove 10 entirely, the reinforcing bolt 9 is prevented from contacting with the inner wall of the guide rail sliding seat 202 in the climbing process of the climbing guide rail section 3, and the front end of the reinforcing bolt 9 is provided with a notch, so that a tool can extend into the countersunk head groove 10 to screw the reinforcing bolt 9 to rotate.
Working principle: during the use, splice the guide rail festival 3 of climbing into the guide rail of climbing, install anti-falling wall attaching support 2 on the building floor, use the tower crane to wholly hoist the guide rail festival 3 of climbing, then install the guide rail festival 3 of climbing on anti-falling wall attaching support 2, accomplish the material platform 1 on subaerial concatenation, then use the tower crane to hang material platform 1 to the design height, then link together material platform 1 and the guide rail festival 3 of climbing, install the pull-down festival pole 103, install horizontal truss 4 after the pull-up festival pole 104, be connected with traction device's output and traction seat 6 again, pull horizontal truss 4 through traction device and climb and drive the guide rail of climbing, and then drive material platform 1 and climb, when dismantling whole equipment, at first, descend the guide rail of climbing to contact the ground through traction device, then use the instrument to separate stiffener 11 with unable adjustment base 12, then use the instrument to take out reinforcement bolt 9, can take out the guide rail festival 3 of the bottommost, follow down and upwards take out all guide rail festival 3 of climbing in proper order, when taking out material platform 1, distance from ground, can be less than the whole lift platform 1 need not to use lift the material platform 1 from lift whole lift the whole lift platform 1 to follow, the whole lift the material platform 1 to follow.
It should be noted that the foregoing merely illustrates the technical idea of the present utility model and is not intended to limit the scope of the present utility model, and that a person skilled in the art may make several improvements and modifications without departing from the principles of the present utility model, which fall within the scope of the claims of the present utility model.

Claims (6)

1. The utility model provides an assembled self-climbing material platform, includes material platform (1), prevents weighing down attaches wall support (2), climbing guide, its characterized in that: the climbing guide rail is formed by up-down assembly of a plurality of climbing guide rail sections (3) with equal length, the climbing guide rail sections (3) comprise a guide rail main body (301), guide rail connecting rods (302) and platform mounting columns (303), the guide rail connecting rods (302) are arranged between the guide rail main body (301) and the platform mounting columns (303), the outer walls of the guide rail connecting rods (302) are fixedly provided with horizontal trusses (4) through bolts, the front end and the rear end of each horizontal truss (4) are simultaneously connected with two guide rail connecting rods (302), the top ends of the platform mounting columns (303) are fixedly provided with T-shaped blocks (8), the left side outer walls of the bottom ends of the platform mounting columns (303) are provided with T-shaped grooves (7), the T-shaped blocks (8) are clamped in the T-shaped grooves (7), the front surfaces of the platform mounting columns (303) are provided with countersunk grooves (10), the inner walls of the countersunk grooves (10) are in threaded connection with reinforcing bolts (9), the outer walls of the reinforcing bolts (9) are in threaded connection with the inner walls of the T-shaped blocks (8), the bottoms of the guide rail (302) and the top connecting rods (12) are fixedly provided with a reinforcing base (11), the top end and the bottom end of the reinforcing rod (11) are respectively and fixedly connected with the fixed bases (12) on the two climbing guide rail sections (3).
2. The fabricated self-climbing material platform according to claim 1, wherein: the material platform (1) comprises a bearing bottom plate (101), the left end of the bearing bottom plate (101) is connected with a guide rail main body (301), a guardrail (102) is arranged at the top of the bearing bottom plate (101) through bolts, a pull-down joint rod (103) is fixedly connected to the outer wall of the guardrail (102) through bolts, a pull-up joint rod (104) is arranged at the right end of the pull-down joint rod (103), and the right end of the pull-up joint rod (104) is fixedly connected with the outer wall of the uppermost climbing guide rail section (3) through bolts.
3. The fabricated self-climbing material platform according to claim 1, wherein: the anti-falling wall attaching support (2) comprises a wall attaching base (201), the wall attaching base (201) is fixedly installed on a building floor, a guide rail sliding base (202) is fixedly installed on the left side outer wall of the wall attaching base (201) through bolts, the guide rail sliding base (202) is slidably sleeved on a platform installing column (303), and guide rail locking blocks (203) are connected to the outer wall of the guide rail sliding base (202) through threads.
4. The fabricated self-climbing material platform according to claim 1, wherein: the edge of the front end part of the reinforcing bolt (9) is provided with a notch, and the outer diameter of the front end of the reinforcing bolt (9) is smaller than the inner diameter of the countersunk groove (10).
5. The fabricated self-climbing material platform according to claim 2, wherein: the connecting part of the bearing bottom plate (101) and the guide rail main body (301) is provided with a platform locking block (5), and the pull-down joint rods (103) are provided with a plurality of groups and are respectively positioned on the front and back outer walls of the guardrail (102).
6. The fabricated self-climbing material platform according to claim 1, wherein: the right outer wall of the horizontal truss (4) is fixedly provided with a traction seat (6), and the traction seat (6) is connected with the output end of traction equipment.
CN202420159400.6U 2024-01-23 2024-01-23 Assembled self-climbing material platform Active CN221609549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420159400.6U CN221609549U (en) 2024-01-23 2024-01-23 Assembled self-climbing material platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420159400.6U CN221609549U (en) 2024-01-23 2024-01-23 Assembled self-climbing material platform

Publications (1)

Publication Number Publication Date
CN221609549U true CN221609549U (en) 2024-08-27

Family

ID=92427051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420159400.6U Active CN221609549U (en) 2024-01-23 2024-01-23 Assembled self-climbing material platform

Country Status (1)

Country Link
CN (1) CN221609549U (en)

Similar Documents

Publication Publication Date Title
CN210767927U (en) Safety protection platform of attached lifting operation
CN214195484U (en) All-steel attached lifting scaffold
CN112942790A (en) Cantilever climbing device and construction method of cantilever structure
CN111236613A (en) Protection platform for building construction and use method thereof
CN111170171A (en) Core cylinder movable arm type tower crane installation climbing structure and method thereof
CN213626572U (en) Tool type external cantilever operation platform
CN221609549U (en) Assembled self-climbing material platform
CN117569607A (en) Super high-rise adduction variable-section climbing frame construction method
CN112065013A (en) Outer wall scaffold reinforcing mechanism for construction
CN215407320U (en) Aluminum alloy climbing frame guide rail
CN214006477U (en) Triangular guide rail structure for climbing frame
CN115584851A (en) Supporting-rod-free green slip form construction platform for cylindrical structures
CN211895796U (en) Core cylinder movable arm type tower crane installation climbing structure
CN111155754B (en) Automatic elevator shaft jacking platform and using method thereof
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN216865896U (en) Scaffold for building construction
CN216072817U (en) Intelligent self-elevating tower crane driver passageway
CN213927417U (en) Attached lifting scaffold
CN214615362U (en) A collapsible flexible intelligence is climbed for heterotypic outer contour line building
CN214462409U (en) Climbing frame attachment structure suitable for decorative constructional column
CN215368632U (en) Intelligent climbing frame lifting device
CN216893418U (en) Attached support of attached lifting scaffold
CN214575530U (en) Elevator shaft operating platform
CN219753883U (en) Stair room operation platform with telescopic upright rod and telescopic supporting leg
CN219753921U (en) Novel plate supporting mechanism for attached lifting scaffold

Legal Events

Date Code Title Description
GR01 Patent grant