CN2214477Y - Stereo combined scaffold - Google Patents

Stereo combined scaffold Download PDF

Info

Publication number
CN2214477Y
CN2214477Y CN 95205456 CN95205456U CN2214477Y CN 2214477 Y CN2214477 Y CN 2214477Y CN 95205456 CN95205456 CN 95205456 CN 95205456 U CN95205456 U CN 95205456U CN 2214477 Y CN2214477 Y CN 2214477Y
Authority
CN
China
Prior art keywords
vertical rod
unit
scaffold
fixed
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95205456
Other languages
Chinese (zh)
Inventor
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95205456 priority Critical patent/CN2214477Y/en
Application granted granted Critical
Publication of CN2214477Y publication Critical patent/CN2214477Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a stereo combined scaffold. Upright posts and cross bars are fixed into N-shaped frame structure units with stairway foot steps; each unit is arranged around a house at a certain interval; two adjacent units are detachably fixed on the upright posts by cross supporting rods; a foot board is arranged above the two adjacent units; ends of the upright posts are provided with demountable joint structures to conveniently stack from the up and the down sides and joint from the left and the right sides each unit to form the whole body of the scaffold. The utility model is a structure array pattern which is convenient for assembling, disassembling, packing and long distance conveying, has sufficient rigidity and stability, can conspicuously improve the efficiency of forming a scaffold, save material and reduce the construction cost.

Description

Stereo combined scaffold
The utility model relates to a kind of building operations scaffold.
Traditional scaffold is to tie up with mao bamboon or steel pipe, or connects by bolt, union, makes that to set up the scaffold man-hours requirement big, and the desired structure material is many, and required connector is many, cause to account for the stockyard phenomenon more, and loss greatly, energy waste, be not easy to dismounting again.
The purpose of this utility model is to overcome the defective of prior art, and a kind of three-dimensional combined scaffold of being convenient to dismounting, saving of labor, material-saving is provided, to reduce loss, energy conservation.
The utility model is achieved by the following scheme: it is fixed into by vertical rod, cross bar contains the shape frame construction unit that stair are stepped on shelves, each unit with a determining deviation be arranged in build a house around, between adjacent Unit two by removable being fixed in the vertical rod of strut of intersecting; Foot pedal is shelved on top, Unit two; The end of vertical rod has the releasable connection structure of each upper and lower stack in unit.
This scaffold utilization has been shaped On shape frame construction unit is undertaken by connected mode, following stack, a left side, a left side also connects the scaffold that forms around the house all around, for the high-rise operation of construction worker, it is a kind of installation, raise, dismounting is all very convenient, be convenient to the to case structural group combination pattern of long-distance carrying, has enough rigidity and stability, the defective of having avoided traditional scaffold expense of taking a lot of work to expect, can make and set up scaffold efficient and significantly improve, save structural meterials, can save for 80% dismounting man-hour, reduce half manpower, the weight ratio steel pipe scaffold is light by 30%, greatly reduce construction costs, can be applicable to the indoor and outdoor body of wall and whitewash, the facility maintenance, the installation of industrial equipment, work high above the ground such as maintenance.
Description of drawings.
Fig. 1 is the utility model structural representation.
Fig. 2 be the upper and lower stack in each unit, left and right and connect after plane figure.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the B-B sectional view of Fig. 2.
Fig. 5 is the C-C sectional view of Fig. 2.
Fig. 6 is a vertical rod raising device sectional view.
Fig. 7 is a vertical rod extension fixture schematic diagram.
Fig. 8 is the D place structure sectional view of Fig. 7.
Describe in further detail by above-mentioned accompanying drawing embodiment.
Three-dimensional combined scaffold (referring to Fig. 1-8) is fixed into by vertical rod (4), cross bar (5) welding of different size length and contains the shape frame construction unit that stair are stepped on shelves (3), vertical rod, cross bar adopt 2 millimeters thick steel plates to strike out " ∪ " shape (Fig. 5), curved fitting in the opening part to gain in strength and rigidity
Figure 952054566_IMG3
The shape structure is equivalent to door, walking when working for people, 1.8 meters of overall heights, 1.1 meters of overall widths.
Each unit with 1.8 meters spacings be arranged in wait to build a house around (Fig. 2), strut (2) by the steel pipe system of intersecting between adjacent Unit two is fixed in the vertical rod (4), detachably, this syndeton (Fig. 3) is promptly welded pin junction plate (6) in two places up and down in vertical rod, pin (7) welds one with junction plate again, fixture block (9) is equipped with in the end of pin, hinged by pin (8), but require the fixture block can not be greater than pin, be advisable with equal diameter, generally one of fluting is cut flatly on pin or fixture block, and opens oblong slots on fixture block, and flat department and groove are equipped with fixture block can be gone up, under pull 90 °.The top of adjacent struts (2) strikes out the through hole that the reprocessing of flat department shape is slightly larger than pin, and strut just can be set on the pin to be blocked by fixture block is fixed (Fig. 3 is inserted in state for strut, and imaginary line is a strut kayser state).
Foot pedal (1) is shelved on top, Unit two, and the foot pedal ligation that available plank or bamboo chip are compiled is on vertical rod or cross bar, and the increase safety is gone along with sb. to guard him in setting.
Since this scaffold can upper and lower stack to adapt to highrise building needs, therefore the upper and lower end of every vertical rod all is preset with syndeton (Fig. 4), it is required to do each unit stack, detachably.Promptly be welded to connect piece (10), be fastenedly connected, be about to upper and lower two vertical rods and be fixed as one by bolt, nut at the both ends of vertical rod.
Vertical rod contacts an end with ground can be provided with raising device (Fig. 6), and the utilization of this device is welded on the contiguous block (10) of pole tip, loads onto bolt, and inside and outside tight by the nut assembly, this device generally is useful in inner wall render, can raise 30 centimeters.
Vertical rod contacts an end with ground also can be provided with extension fixture (Fig. 7-8), this device comprises the hound (11) that is fixed in the porthole, its top connects high piece (12), be fastenedly connected by bolt, nut and the contiguous block (10) that is welded on pole tip, this device generally is useful in building below three layers.

Claims (6)

1, a kind of three-dimensional combined scaffold comprises vertical rod, cross bar and the foot pedal of various different size length, it is characterized in that:
A. be fixed into by vertical rod (4), cross bar (5) and contain the ㄇ shape frame construction unit that stair are stepped on shelves (3), each unit with a determining deviation be arranged in build a house around, between adjacent Unit two by removable being fixed in the vertical rod (4) of strut (2) of intersecting;
B. foot pedal (1) is shelved on top, Unit two;
The end of c. vertical rod (4) has the releasable connection structure of each upper and lower stack in unit.
2, three-dimensional combined scaffold as claimed in claim 1, the removable fixedly pin junction plate (6) of fixedlying connected promptly in vertical rod that it is characterized in that strut (2) and vertical rod (4), pin (7) is fixed as one with it, the end of pin is equipped with by pin (8) and is connected to form hinged fixture block (9), and the top perforate of adjacent struts (2) is set on the pin (7).
3, three-dimensional combined scaffold as claimed in claim 1, the releasable connection structure that it is characterized in that the upper and lower stack of vertical rod (4) i.e. at the both ends of vertical rod fixedly connected (10), with bolt, fastening two contiguous blocks of nut.
4, three-dimensional combined scaffold as claimed in claim 1 is characterized in that the cross section of vertical rod (4) is " ∪ " shape, curved fitting in the opening part.
5, as claim 1 or 2 or 3 or 4 described three-dimensional combined scaffolds, it is characterized in that vertical rod contacts an end and can be provided with raising device with ground, this device is equipped with bolt on vertical rod contiguous block (10), inside and outside tight by the nut assembly.
6, as claim 1 or 2 or 3 or 4 described three-dimensional combined scaffolds, it is characterized in that vertical rod contacts an end and can be provided with extension fixture with ground, this device comprises the hound (11) that is fixed in the porthole, its top fixedly connects high piece (12), is fastenedly connected by bolt, nut and the contiguous block (10) that is fixed on pole tip.
CN 95205456 1995-03-08 1995-03-08 Stereo combined scaffold Expired - Fee Related CN2214477Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95205456 CN2214477Y (en) 1995-03-08 1995-03-08 Stereo combined scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95205456 CN2214477Y (en) 1995-03-08 1995-03-08 Stereo combined scaffold

Publications (1)

Publication Number Publication Date
CN2214477Y true CN2214477Y (en) 1995-12-06

Family

ID=33857686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95205456 Expired - Fee Related CN2214477Y (en) 1995-03-08 1995-03-08 Stereo combined scaffold

Country Status (1)

Country Link
CN (1) CN2214477Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107246137A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Outdoor security type scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107246137A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Outdoor security type scaffold

Similar Documents

Publication Publication Date Title
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN210798252U (en) Assembled outer protection frame system
CN213869235U (en) Assembled is faced and is built and enclose fender with intelligent spraying system
CN213418433U (en) Stair combined type operation platform
CN2214477Y (en) Stereo combined scaffold
CN213204913U (en) Modular prefabricated staircase operation platform
CN209704028U (en) Standardized protection system of assembled building
CN211173004U (en) Hanging basket for high-altitude welding steel structure
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN221053295U (en) Convenient construction stair
CN220645154U (en) Socket type disc buckle type shaping tripod outer protection frame
CN216109852U (en) Can dismantle vestibule and prevent railing
CN214697029U (en) Steel construction assembled house floor face limit protector
CN215107161U (en) A down-bracing formula scaffold frame for assembly type structure outer wall
CN217353458U (en) Attached scaffold
CN215717084U (en) Special-shaped courtyard regularization operation platform
CN220978750U (en) Modularized tool type operating platform capable of being hung on steel beam
CN210685313U (en) Safe convenient house steel connection structure
CN219218710U (en) Integrated assembly type bracket for bridge construction
CN221838088U (en) Steel construction assembled guardrail
CN214939361U (en) Adjustable cantilever operation platform
CN219080928U (en) Full hall scaffold with adjustable modulus
CN211338599U (en) Tower crane attaches wall mounting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee