CN221298167U - Guide type high-pressure cleaning structure for transverse drain pipe of highway tunnel in recrystallization zone - Google Patents
Guide type high-pressure cleaning structure for transverse drain pipe of highway tunnel in recrystallization zone Download PDFInfo
- Publication number
- CN221298167U CN221298167U CN202322783421.3U CN202322783421U CN221298167U CN 221298167 U CN221298167 U CN 221298167U CN 202322783421 U CN202322783421 U CN 202322783421U CN 221298167 U CN221298167 U CN 221298167U
- Authority
- CN
- China
- Prior art keywords
- guide rope
- tunnel
- pipes
- transverse drain
- drain pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004140 cleaning Methods 0.000 title claims abstract description 32
- 238000001953 recrystallisation Methods 0.000 title claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 23
- 239000007921 spray Substances 0.000 claims abstract description 10
- 238000004804 winding Methods 0.000 claims abstract description 6
- 230000008439 repair process Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims 1
- 239000013078 crystal Substances 0.000 abstract description 8
- 238000005507 spraying Methods 0.000 abstract description 4
- 239000013049 sediment Substances 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000011010 flushing procedure Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 238000002425 crystallisation Methods 0.000 description 2
- 230000008025 crystallization Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000003670 easy-to-clean Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 1
- 230000002378 acidificating effect Effects 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 238000004090 dissolution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002503 metabolic effect Effects 0.000 description 1
- 244000005700 microbiome Species 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
Abstract
The utility model discloses a guide type high-pressure cleaning structure for transverse drain pipes of a highway tunnel in a recrystallization area, which comprises two guide rope storage pipes, wherein the two guide rope storage pipes are respectively connected to opposite ends of the two transverse drain pipes in the same section of the tunnel through water pipe connectors, or the two guide rope storage pipes are respectively connected to two arched waist positions of the corresponding annular drain pipes of the two transverse drain pipes in the same section of the tunnel through water pipe connectors, the two guide rope storage pipes are respectively embedded in a secondary lining structure of the tunnel, the inlets of the two guide rope storage pipes are respectively positioned above two repairing channels of the tunnel, one guide rope is positioned in the two transverse drain pipes in the same section of the tunnel and spans a central drainage ditch, two ends of the guide rope are respectively connected with a high-pressure nozzle of a high-pressure cleaning vehicle through the two water pipe connectors and are positioned at the inlets of the two guide rope storage pipes, and one end of the guide rope is connected and wound on a winding drum of a winding machine; in the structure, a winch pulls a guide rope, and the guide rope guides a high-pressure spray head spraying high-pressure water to flush crystal sediments in a tunnel transverse drain pipe through the tunnel transverse drain pipe.
Description
Technical Field
The utility model relates to a tunnel drainage system, in particular to a guide type high-pressure cleaning structure for a transverse drain pipe of a highway tunnel in a recrystallization region.
Background
Tunnel engineering plays an important role in modern traffic infrastructure, and as tunnel length and complexity increase, drainage system design and management becomes particularly critical. The reliability of the drainage system directly determines the operational safety of the tunnel engineering. Generally, the tunnel drainage system mainly comprises a circumferential drainage pipe, a longitudinal drainage pipe, a transverse drainage pipe, a road side drainage blind drain and a central drainage drain on the back of the two liners. The accumulated water behind the second lining is led to the central drainage ditch through the annular drainage pipe, the longitudinal drainage pipe and the transverse drainage pipe, so that the water pressure behind the second lining is reduced, and the durability of the lining structure is improved. The blockage of the tunnel drainage system is mainly divided into two types: one type is clogging caused by silt; one is caused by blockage by chemical crystals. Underground water behind karst area tunnel secondary liningAndThe content is higher, and the tunnel primary support shotcrete contains a large amount ofIons, after passing through the primary support, form a large amount of carbonate crystals, thereby causing the crystallization blockage of the tunnel drainage system. The blocking of the drainage system crystals is one of the most common diseases in tunnels located in karst areas. The crystallization blockage of the tunnel drainage system often causes the defects of cracking of a tunnel lining structure, water leakage, uplift of a pavement structure, cracking, flashing and the like, and seriously affects the driving safety of the tunnel. And because the tunnel drainage system is buried, especially the transverse drainage pipe behind the two liners, because the longitudinal slope of the transverse drainage pipe is smaller, the tunnel drainage system is a blocked heavy disaster area, and the daily cleaning and maintenance difficulty is extremely high. If the tunnel drain pipe in the recrystallized region is cleaned without adopting corresponding measures, the normal service life is extremely short, the tunnel is usually operated for 3-5 years, and the drainage system behind the second lining is basically invalid. In order to solve the problem of blockage of a tunnel drainage system in a recrystallization area, a great deal of research is carried out by each expert student, and the main scheme at present is that firstly, a drainage pipe made of special materials is adopted; secondly, flushing by adopting a special solution and high-pressure cleaning equipment; third, adjusting additive reduction in primary supportsIon content; fourthly, a method for generating acidic substances by utilizing the metabolic activity of microorganisms to dissolve or accelerate the dissolution of the crystal plugs is provided. The method has advantages and disadvantages, but the field practical application mainly comprises the second method of flushing the special solution and the high-pressure cleaning equipment. When high-pressure cleaning equipment washes, because the drain pipe is buried secretly, very difficult when wasing, generally need block traffic, dig lining structure, road surface structure and dredge and wash even, the cost is very huge.
Disclosure of utility model
Therefore, the utility model aims to provide a guide type high-pressure cleaning structure for a transverse drain pipe of a highway tunnel in a recrystallization zone, so as to solve the technical problems of difficult cleaning and high cost of the transverse drain pipe of the highway tunnel in the recrystallization zone.
The utility model aims at realizing the following technical scheme:
The utility model provides a heavy crystal area highway tunnel horizontal drain pipe guide formula high pressure cleaning structure, including two guide rope storage tubes, two guide rope storage tubes are respectively through water pipe connection on two horizontal drain pipes of the same section of tunnel deviate from the end mutually, or two guide rope storage tubes are respectively through water pipe connection on two arched waist positions of the corresponding hoop drain pipe of two horizontal drain pipes of the same section of tunnel, two guide rope storage tubes are pre-buried respectively in tunnel secondary lining structure and its entry is located two inspection and repair the passageway top respectively, a guide rope is located two horizontal drain pipes of the same section of tunnel and spanes central escape canal, guide rope both ends are respectively through two water pipe connection and are located two guide rope storage tube entry departments, guide rope one end is connected high-pressure cleaning car high-pressure shower nozzle, the winding is connected on the hoist reel to the other end.
Further, the guide rope storage tube inlet is provided with a cover.
Further, the guide rope is a flexible steel wire rope.
The beneficial effects of the utility model are as follows:
According to the guide type high-pressure cleaning structure for the transverse drain pipe of the highway tunnel in the recrystallized region, the winch pulls the other end of the guide rope, the other end of the guide rope guides the high-pressure spray head spraying high-pressure water to pass through the transverse drain pipe, and the high-pressure water washes crystal sediments in the transverse drain pipe of the tunnel so as to reduce blockage of the transverse drain pipe, improve maintainability and reliability of the transverse drain pipe of the tunnel in the recrystallized region, enable the transverse drain pipe of the tunnel in the recrystallized region to be easy to clean, low in cost and not affect normal traffic during cleaning.
Additional advantages, objects, and features of the utility model will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the utility model. The objects and other advantages of the utility model may be realized and obtained by means of the instrumentalities and combinations particularly pointed out in the specification.
Drawings
For the purpose of making the objects, technical solutions and advantages of the present utility model more apparent, the present utility model will be described in further detail with reference to the accompanying drawings, in which:
FIG. 1 is a schematic diagram of the structure of the present utility model.
FIG. 2 is a schematic diagram of the usage state structure of the present utility model.
In the figure: guide rope 101, high-pressure nozzle 201, high-pressure water delivery pipe 202, high-pressure cleaning vehicle 203, hoist 204, guide rope storage pipe 301, three-way joint 302, four-way joint 303, lateral drain pipe 4, longitudinal drain pipe 5, and circumferential drain pipe 6.
Detailed Description
Hereinafter, preferred embodiments of the present utility model will be described in detail with reference to the accompanying drawings. It should be understood that the preferred embodiments are presented by way of illustration only and not by way of limitation.
As shown in fig. 1-2, a high-pressure cleaning structure guided by transverse drain pipes of a highway tunnel in a recrystallization area comprises two guide rope storage pipes 301, wherein the two guide rope storage pipes 301 are respectively connected to opposite separated ends of two transverse drain pipes 4 in the same section of the tunnel through tee joints 302, or the two guide rope storage pipes 301 are respectively connected to two arched positions of a corresponding annular drain pipe 6 of the two transverse drain pipes 4 in the same section of the tunnel through tee joints 302, the two guide rope storage pipes 301 are respectively embedded in a secondary lining structure of the tunnel, the inlets of the guide rope storage pipes 301 are respectively positioned above two repair channels of the tunnel, the inlets of the two guide rope storage pipes 301 are respectively provided with covers for protection, one guide rope 101 is positioned in the two transverse drain pipes 4 in the same section of the tunnel and spans a central drain ditch, two ends of the guide rope 101 are respectively positioned at the inlets of the two guide rope storage pipes 301 through the tee joints 302, one end of the guide rope 101 is connected with a high-pressure spray head 201 of the high-pressure cleaning vehicle 203, and the other end is connected and wound on a winding drum 204, and the guide rope 101 is a flexible steel wire rope.
According to the guide type high-pressure cleaning structure for the transverse drain pipe of the highway tunnel in the recrystal region, the winch 204 pulls the guide rope 101, the guide rope 101 pulls the high-pressure spray nozzle 201 for spraying high-pressure water to pass through the transverse drain pipe 4 of the tunnel, and the high-pressure water washes crystalline sediments in the transverse drain pipe 4 of the tunnel so as to reduce blockage of the transverse drain pipe 4, improve maintainability and reliability of the transverse drain pipe 4 of the tunnel in the recrystal region, enable the transverse drain pipe 4 of the tunnel in the recrystal region to be easy to clean, have low cost, and do not influence normal traffic during cleaning. After the flushing is completed, the high-pressure spray head 201 is pulled by a water pipe reel or a winch on the high-pressure cleaning vehicle 203 to restore the high-pressure spray head 201 to the original position with the guide rope 101.
When the transverse drain pipe guide type high-pressure cleaning structure of the highway tunnel in the recrystal region is constructed, when the transverse drain pipe 4 is installed in the highway tunnel in the recrystal region, the guide rope 101 is placed in the two transverse drain pipes 4 with the same section of the tunnel, the guide rope 101 spans across the central drain ditch, enough lengths are reserved at two ends of the guide rope 101, the two ends of the guide rope 101 respectively penetrate through the two tee joints 302 and extend into the two guide rope storage pipes 301 before the waterproof board is constructed, the two guide rope storage pipes 301 are respectively connected into the two transverse drain pipes 4 with the same section of the tunnel or the two ends of the annular drain pipe 6 through the tee joints 302, the two guide rope storage pipes 301 are respectively embedded in the secondary lining, the inlets of the two guide rope storage pipes 301 are positioned above the two inspection repair channels, and the cover is covered.
The utility model has the following beneficial effects:
(1) Placing the guide rope 101 can facilitate high-pressure cleaning of the transverse drain pipe 4 in the tunnel operation stage, and can also check the construction quality of the drain pipe in the construction stage, so as to solve the problem of difficult management of the construction quality of the buried drain pipe in the construction stage. Before high-pressure cleaning, the guide rope 101 can be pulled back and forth by the winch 204 to break the crystals in the transverse drain pipe 4, so that the effect of the high-pressure spray head is improved.
(2) The lateral drain pipe 4 is the most prone to blockage in the recrystallized zone of the karst zone. The transverse drain pipe 4 is a main channel for the water flowing from the crevice behind the second lining of the tunnel to the central drain ditch, and the water flowing rate is large, but the longitudinal slope of the transverse drain pipe 4 is small, and the transverse drain pipe 4 is easy to squeeze and deform in construction, so that the transverse drain pipe 4 is most easy to block. The high-pressure cleaning guide rope 101 is separately arranged in the transverse drain pipe 4, so that the cleaning efficiency of the transverse drain pipe can be improved.
(3) The transverse drain pipe 4 is connected with the longitudinal drain pipe 5 and the circumferential drain pipe 6 through the four-way joint 303 on the arch springing, meanwhile, a three-way joint 302 is arranged on the arch waist position of the circumferential drain pipe 6, the guide rope storage pipe 301 is connected with the circumferential drain pipe 6, or a three-way joint 302 is arranged at the end part of the transverse drain pipe 4, and the guide rope storage pipe 301 is connected with the transverse drain pipe 4. The guide rope storage tube 301 passes through the waterproof board and is embedded in the two liners, the inlet of the guide rope storage tube 301 is arranged above the tunnel repair channel, and the cover is arranged for sealing so as to store the guide rope in the operation period. The guide rope storage pipe 301 is connected above the repair road, so that the tunnel can conveniently operate under the condition of not blocking traffic in the operation process. When the transverse drain pipe 4 is cleaned, the high-pressure cleaning vehicle 203 and the windlass 204 are positioned at two sides of the tunnel section, and the guiding rope 101 is pulled by the windlass 204 to guide the high-pressure spray nozzle 201 spraying high-pressure water to perform high-pressure cleaning on the transverse drain pipe 4. The high-pressure spray head 201 is guided by the guide rope 101 to regularly flush the transverse drain pipe 4 at high pressure, so that the operation is simple, convenient and quick, the normal traffic of a tunnel is not influenced, and the operation and maintenance difficulty of a tunnel drainage system is reduced.
Finally, it is noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made thereto without departing from the spirit and scope of the present utility model, which is intended to be covered by the claims of the present utility model.
Claims (3)
1. The utility model provides a transverse drain pipe guide formula high pressure cleaning structure in recrystalization district highway tunnel which characterized in that: the device comprises two guide rope storage pipes (301), wherein the two guide rope storage pipes (301) are respectively connected to opposite separation ends of two transverse drain pipes (4) of the same section of a tunnel through water pipe connectors, or the two guide rope storage pipes (301) are respectively connected to two arched positions of a corresponding annular drain pipe (6) of the two transverse drain pipes (4) of the same section of the tunnel through water pipe connectors, the two guide rope storage pipes (301) are respectively embedded in a secondary lining structure of the tunnel, the inlets of the guide rope storage pipes are respectively located above two repair channels of the tunnel, one guide rope (101) is located in the two transverse drain pipes (4) of the same section of the tunnel and spans a central drainage ditch, two ends of the guide rope (101) are respectively connected to the inlets of the two guide rope storage pipes (301) through the two water pipe connectors, one end of the guide rope (101) is connected with a high-pressure spray head (201) of a high-pressure cleaning vehicle (203), and the other end of the guide rope (101) is connected and wound on a winding drum of a winding machine (204).
2. The high-pressure cleaning structure guided by a transverse drain pipe of a highway tunnel in a recrystallization zone according to claim 1, wherein: the inlet of the guide rope storage tube (301) is provided with a cover.
3. A recrystalization zone highway tunnel lateral drain pipe guide type high pressure cleaning structure according to claim 1 or 2, characterized in that: the guide rope (101) is a flexible steel wire rope.
Publications (1)
Publication Number | Publication Date |
---|---|
CN221298167U true CN221298167U (en) | 2024-07-09 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106194255B (en) | Tunnel waterproof and water drainage system and its method of construction | |
CN111119995B (en) | Dynamic monitoring and dredging drainage system and method for water pressure and flow velocity at back of tunnel lining | |
CN212003197U (en) | Subway station tunnel door ring beam seepage-proofing drainage construction structure | |
CN208088344U (en) | With waterproof, the underground pipe gallery structure of drain function | |
CN206972303U (en) | A kind of tunnel-liner discharge structure | |
CN112049219A (en) | Construction method of repairing system for leakage water of sewage pipe network | |
CN221298167U (en) | Guide type high-pressure cleaning structure for transverse drain pipe of highway tunnel in recrystallization zone | |
CN109812042B (en) | Non-stop grouting repair method for sewage treatment structure expansion joint | |
CN115492215A (en) | Non-excavation dredging and repairing construction method for drainage pipeline | |
CN110410144B (en) | Waterproof and drainage structure of shield tunnel | |
CN112065425A (en) | Slurry balance type pipe jacking equipment and construction process thereof on sand and stone superposed layer | |
CN111188648A (en) | Tunnel water-proof and drainage system and construction method thereof | |
CN117339941A (en) | Guide type high-pressure cleaning structure of recrystalization area highway tunnel drainage system | |
CN206625869U (en) | A kind of tunnel drainage sleeve pipe for being used to remove crystallization and silting thing | |
CN212270978U (en) | Automatic control groundwater pressure device suitable for underground structure | |
KR100701630B1 (en) | Center Wall of Two Arch Tunnel | |
CN112377252B (en) | Removable tunnel lateral wall water drainage hole device convenient to mediation | |
CN208456634U (en) | A kind of tunnel water handling structure of replacement easy to repair | |
CN112112248A (en) | Method for repairing defect of channel box | |
CN113202121A (en) | Automatic control underground hydraulic device suitable for underground structure and construction method | |
CN220266778U (en) | Non-excavation short pipe of drainage pipeline | |
CN218713277U (en) | Waterproof and anti-irrigation underground pipe ditch structure | |
CN220538820U (en) | Drainage structures of power cable calandria and worker well junction | |
CN213842969U (en) | Shield constructs section of jurisdiction infiltration performance experimental apparatus | |
CN219220512U (en) | Device for extracting sediment in tunnel drain pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |