CN221236356U - Building material auxiliary installation equipment - Google Patents

Building material auxiliary installation equipment Download PDF

Info

Publication number
CN221236356U
CN221236356U CN202322098861.5U CN202322098861U CN221236356U CN 221236356 U CN221236356 U CN 221236356U CN 202322098861 U CN202322098861 U CN 202322098861U CN 221236356 U CN221236356 U CN 221236356U
Authority
CN
China
Prior art keywords
fixedly connected
rod
sides
building material
worm wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322098861.5U
Other languages
Chinese (zh)
Inventor
陶建建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Mingqiang Construction Engineering Co ltd
Original Assignee
Shaanxi Mingqiang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Mingqiang Construction Engineering Co ltd filed Critical Shaanxi Mingqiang Construction Engineering Co ltd
Priority to CN202322098861.5U priority Critical patent/CN221236356U/en
Application granted granted Critical
Publication of CN221236356U publication Critical patent/CN221236356U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building material installation, and provides building material auxiliary installation equipment which comprises an installation frame, wherein a threaded rod is rotatably connected to the inside of the installation frame, a driven worm wheel is fixedly sleeved in the middle of the outer surface of the threaded rod, two limit rods are fixedly connected to the two sides, close to the threaded rod, of the inside of the installation frame, two inner thread sleeves are fixedly connected to the two sides, movably sleeved on the two sides, of the outer surface of the limit rod, two connecting rods are fixedly connected to the two sides, far away from the inner thread sleeve, of the connecting rod, one end, far away from the inner thread sleeve, of the connecting rod is fixedly connected to the outer surface of the rod sleeve, and a telescopic rod is fixedly connected to one side of the inner thread sleeve. According to the utility model, the device is provided with the fixing and clamping structure of the water wallboard, so that the cement wallboard placed on the device can be well clamped and fixed, the placement of the cement board is stable enough, and the cement board cannot cause danger to constructors during installation and placement.

Description

Building material auxiliary installation equipment
Technical Field
The utility model relates to the technical field of building material installation, in particular to auxiliary building material installation equipment.
Background
The cement exterior wall cladding is a novel interior and exterior wall decoration material, and is mainly used for decoration and reconstruction of exterior elevation of villas, workshops and houses; decoration of building roofs; indoor wall decoration, suspended ceilings, partition walls and retaining walls; indoor and outdoor ground decoration; the grille fence and various garden building shapes and accessories are mainly used for replacing the original wood boards, PVC hanging boards and other materials so as to avoid the defects of easy aging, mildew, corrosion, flammability and the like, and the grille fence is wide in application, green and environment-friendly, and the plant fiber cement hanging boards are made of natural fiber cement.
But in the prior art, for example, chinese publication No.: CN112773280a, "a building material auxiliary installation device", belonging to the building material installation technical field, specifically speaking, a building material auxiliary installation device, comprising a box body; the bottom end of the box body is fixedly connected with a group of universal wheels, and the side wall of the box body is fixedly connected with a pushing handle; an adjusting component is arranged in the box body; the top end of the box body is provided with symmetrically distributed movable seats; the box body is connected with the movable seat through the adjusting component; an electric telescopic rod is fixedly connected to the top end of the movable seat; a fixed block is fixedly connected between the top ends of the pair of electric telescopic rods through a supporting rod; the side wall of the fixed block far away from the electric telescopic rod is rotationally connected with a first pipeline; the invention provides auxiliary installation equipment for building materials, which aims to solve the problem that when an indoor heat insulation material is installed, a wall surface is cleaned manually, but the high place of the wall is inconvenient to clean manually.
But this device does not set up the fixed clamp structure of water wallboard, and cement wallboard that will place on the device that can not be fine carries out the centre gripping fixedly, leads to placing of cement board not stable enough, causes danger to constructor easily during the installation and places, and the device does not set up hydraulic pressure and turns over the board structure, leads to the device can not be convenient lift up cement slabstone, has increased labor cost, is unfavorable for long-term use.
Disclosure of utility model
The utility model aims to solve the problems that in the prior art, a fixed clamping structure of a water wallboard is not arranged in the device, the cement wallboard placed on the device cannot be well clamped and fixed, so that the placement of the cement board is unstable, the danger to constructors is easy to cause during installation and placement, and the device is not provided with a hydraulic turning plate structure, so that the device cannot conveniently lift the cement board, the labor cost is increased, and long-term use is not facilitated.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a building material auxiliary assembly equipment, includes the mounting bracket, the inside of mounting bracket rotates and is connected with the threaded rod, the surface middle part fixed sleeve of threaded rod has driven worm wheel, the inside of mounting bracket is close to two gag lever posts of equal fixedly connected with in both sides of threaded rod, two female screw sleeves are all movably sleeved on the surface both sides of gag lever post, two connecting rods of equal fixedly connected with in surface both sides of female screw sleeve, the one end fixedly connected with of female screw sleeve is kept away from to the connecting rod is at the surface of rod sleeve, one side fixedly connected with telescopic link of female screw sleeve, the one end fixedly connected with splint of female screw sleeve is kept away from to the telescopic link, two sliding grooves have all been seted up to one side that the mounting bracket is close to the telescopic link, the surface sliding connection of telescopic link is in the inside of sliding groove.
As a preferred implementation mode, two pressure-bearing rods are fixedly connected to the bottom of one side, close to the sliding groove, of the mounting frame, and a fixing rod is fixedly connected to one side, far away from the sliding groove, of the mounting frame.
As a preferred implementation mode, one side of the fixed rod, which is close to the mounting frame, is fixedly connected with a motor, the output end of the motor is fixedly connected with a driving worm wheel, and the outer surface of the driving worm wheel is in meshed connection with the outer surface of the driven worm wheel.
As a preferred implementation mode, one side of the mounting frame far away from the pressure-bearing rod is fixedly connected with two connecting blocks, two sides of each connecting block are rotationally connected with a first rotating shaft, and the bottom of each first rotating shaft is fixedly connected with a movable frame.
As a preferred implementation mode, the inside of removing the frame is all fixedly connected with two third pivots, the inside rotation of third pivot is connected with the hydraulic rod, the one end that the third pivot was kept away from to the hydraulic rod rotates and is connected with the second pivot, the one end fixed connection that the hydraulic rod was kept away from to the second pivot is in one side of mounting bracket.
As a preferable implementation mode, the bottom of the movable frame is fixedly connected with four universal wheels, and the rotation directions of the threaded rods on two sides of the driven worm wheel are different.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. According to the utility model, the device is provided with the fixing and clamping structure of the water wallboard, so that the cement wallboard placed on the device can be well clamped and fixed, the placement of the cement board is stable enough, and the cement board cannot cause danger to constructors during installation and placement.
2. According to the utility model, the device is provided with the hydraulic turning plate structure, so that the device can conveniently turn the cement stone plate, the labor cost is reduced, and the long-term use is facilitated.
Drawings
Fig. 1 is a schematic perspective view of a building material auxiliary installation device according to the present utility model;
fig. 2 is a schematic diagram of a disassembled structure of an auxiliary installation device for building materials;
fig. 3 is a schematic perspective view of a building material auxiliary installation apparatus according to the present utility model;
Fig. 4 is a schematic diagram of a disassembled structure of an auxiliary installation device for building materials according to the present utility model;
Fig. 5 is an enlarged schematic view of a construction material auxiliary installation apparatus according to the present utility model.
Legend description:
1. A mounting frame; 2. a threaded rod; 3. a driven worm wheel; 4. a limit rod; 5. an internal thread sleeve; 6. a rod sleeve; 7. a connecting rod; 8. a telescopic rod; 9. a clamping plate; 10. a sliding groove; 11. a fixed rod; 12. a motor; 13. a driving worm wheel; 14. a pressure-bearing rod; 15. a connecting block; 16. a first rotating shaft; 17. a moving rack; 18. a second rotating shaft; 19. a hydraulic rod; 20. a third rotating shaft; 21. and a universal wheel.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the utility model provides a building material auxiliary assembly equipment, including mounting bracket 1, the inside rotation of mounting bracket 1 is connected with threaded rod 2, threaded rod 2's surface middle part fixed sleeve has driven worm wheel 3, mounting bracket 1's inside is close to threaded rod 2's two equal fixedly connected with gag lever post 4 in both sides, threaded rod 2's the equal threaded connection in surface both sides has two internal thread cover 5, two connecting rods 7 of equal movable sleeve joint in surface both sides of internal thread cover 5, the one end fixed connection of internal thread cover 5 is kept away from to connecting rod 7 is at the surface of rod cover 6, one side fixedly connected with telescopic link 8 of internal thread cover 5, telescopic link 8 is kept away from the one end fixedly connected with splint 9 of internal thread cover 5, two sliding tray 10 have all been seted up to one side that mounting bracket 1 is close to telescopic link 8, telescopic link 8's surface sliding connection is in the inside of sliding tray 10, under the limiting effect of gag lever post 4, both sides's internal thread cover 5, threaded rod 6 and connecting rod 7 move transversely together.
As shown in fig. 1-5, two pressure-bearing rods 14 are fixedly connected to the bottom of one side, close to the sliding groove 10, of the mounting frame 1, a fixing rod 11 is fixedly connected to one side, far away from the sliding groove 10, of the mounting frame 1, and the pressure-bearing rods 14 on the mounting frame 1 play a role in bearing the weight of the cement board.
As shown in fig. 1-5, a motor 12 is fixedly connected to one side of the fixing rod 11, which is close to the mounting frame 1, an output end of the motor 12 is fixedly connected with a driving worm wheel 13, an outer surface of the driving worm wheel 13 is in meshed connection with an outer surface of the driven worm wheel 3, and the driving worm wheel 13 rotates to drive the driven worm wheel 3 to rotate.
As shown in fig. 1-5, two connecting blocks 15 are fixedly connected to one side, away from the pressure-bearing rod 14, of the mounting frame 1, first rotating shafts 16 are rotatably connected to two sides of each connecting block 15, a movable frame 17 is fixedly connected to the bottom of each first rotating shaft 16, and the mounting frame 1 can turn over by taking the first rotating shaft 16 as the circle center.
As shown in fig. 1-5, two third rotating shafts 20 are fixedly connected to the inside of the movable frame 17, a hydraulic rod 19 is rotatably connected to the inside of the third rotating shafts 20, one end, away from the third rotating shafts 20, of the hydraulic rod 19 is rotatably connected to a second rotating shaft 18, one end, away from the hydraulic rod 19, of the second rotating shaft 18 is fixedly connected to one side of the movable frame 1, and the hydraulic rod 19 is connected to the inside of the movable frame 17 through the second rotating shaft 18 and the third rotating shaft 20.
As shown in fig. 1-5, four universal wheels 21 are fixedly connected to the bottom of the moving frame 17, and the rotation directions of the threaded rods 2 on two sides of the driven worm wheel 3 are different, so that the transverse movement directions of the clamping pieces on two sides are opposite because the rotation directions of the threaded rods 2 on two sides of the driven worm wheel 3 are different.
Working principle: before the work starts, the cement stone slab is required to be placed above the mounting frame 1, and then the model of the motor 12 which is installed on the mounting frame 1 by the fixing rod 11 is started: YE3-80M2, rated power: 0.75KW; the output shaft of the motor 12 drives the driving worm wheel 13 to rotate, then the driven worm wheel 3 and the threaded rod 2 rotate together under the meshing action, then the internal thread sleeves 5 at two sides start to move under the action of threads on the threaded rod 2, because the internal thread sleeves 5 are connected with the rod sleeve 6 by the connecting rod 7, the rod sleeve 6 is movably sleeved on the outer surface of the limiting rod 4, under the limiting action of the limiting rod 4, the internal thread sleeves 5 at two sides, the rod sleeve 6 and the connecting rod 7 move transversely together, because the rotation directions of the threaded rods 2 at two sides of the driven worm wheel 3 are different, the movement directions of the two sides are opposite, the telescopic rods 8 fixedly connected with the internal thread sleeves 5 start to shrink inwards simultaneously, and the clamping plate 9 is driven to clamp a cement board placed on the mounting frame 1, the telescopic rod 8 always moves in the sliding groove 10, the placing of the cement stone slab is not affected, the hydraulic rod 19 stretches after the clamping and fixing are completed, the hydraulic rod 19 is connected in the mounting frame 1 and the moving frame 17 through the second rotating shaft 18 and the third rotating shaft 20, the first rotating shaft 16 is in rotating connection with the connecting block 15, the mounting frame 1 can turn up by taking the first rotating shaft 16 as the center of a circle after the hydraulic rod 19 stretches, the cement board is driven to be vertically placed, the pressure-bearing rod 14 on the mounting frame 1 plays a role of bearing the weight of the cement board, after the universal wheel 21 on the moving frame 17 moves to a preset position, the motor 12 reversely rotates, the clamping plate 9 can loose to take out the cement board at the moment, and the cement board is installed.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (6)

1. The utility model provides a building material auxiliary installation equipment, its characterized in that, including mounting bracket (1), the inside rotation of mounting bracket (1) is connected with threaded rod (2), the surface middle part fixed sleeve of threaded rod (2) has driven worm wheel (3), the inside of mounting bracket (1) is close to two gag lever posts (4) of equal fixedly connected with in both sides of threaded rod (2), two internal thread cover (5) are all in threaded connection in surface both sides of threaded rod (2), two pole cover (6) are all cup jointed in the equal activity in surface both sides of gag lever post (4), two connecting rods (7) are all fixedly connected with in surface both sides of internal thread cover (5), the one end fixed connection of internal thread cover (5) is kept away from in connecting rod cover (6) surface, one side fixedly connected with telescopic link (8) of internal thread cover (5), one end fixedly connected with splint (9) of telescopic link (8) are kept away from in telescopic link (8), two sliding groove (10) are all seted up in one side of mounting bracket (1) near telescopic link (8), sliding groove (10) inside sliding connection in telescopic link (10).
2. A building material auxiliary installation apparatus according to claim 1, wherein: two pressure-bearing rods (14) are fixedly connected to the bottom of one side, close to the sliding groove (10), of the mounting frame (1), and a fixing rod (11) is fixedly connected to one side, far away from the sliding groove (10), of the mounting frame (1).
3. A building material auxiliary installation apparatus according to claim 2, wherein: one side of dead lever (11) near mounting bracket (1) fixedly connected with motor (12), the output fixedly connected with initiative worm wheel (13) of motor (12), the surface meshing of initiative worm wheel (13) is connected at the surface of driven worm wheel (3).
4. A building material auxiliary installation apparatus according to claim 3, wherein: one side of the mounting frame (1) far away from the pressure-bearing rod (14) is fixedly connected with two connecting blocks (15), two sides of each connecting block (15) are rotationally connected with a first rotating shaft (16), and the bottom of each first rotating shaft (16) is fixedly connected with a movable frame (17).
5. A building material auxiliary installation apparatus according to claim 4, wherein: the inside of moving frame (17) is all fixedly connected with two third pivots (20), the inside rotation of third pivot (20) is connected with hydraulic rod (19), the one end rotation that third pivot (20) was kept away from to hydraulic rod (19) is connected with second pivot (18), the one end fixed connection that hydraulic rod (19) was kept away from to second pivot (18) is in one side of mounting bracket (1).
6. A building material auxiliary installation apparatus according to claim 5, wherein: the bottom of the movable frame (17) is fixedly connected with four universal wheels (21), and the rotation directions of the threaded rods (2) on two sides of the driven worm wheel (3) are different.
CN202322098861.5U 2023-08-07 2023-08-07 Building material auxiliary installation equipment Active CN221236356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322098861.5U CN221236356U (en) 2023-08-07 2023-08-07 Building material auxiliary installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322098861.5U CN221236356U (en) 2023-08-07 2023-08-07 Building material auxiliary installation equipment

Publications (1)

Publication Number Publication Date
CN221236356U true CN221236356U (en) 2024-06-28

Family

ID=91597739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322098861.5U Active CN221236356U (en) 2023-08-07 2023-08-07 Building material auxiliary installation equipment

Country Status (1)

Country Link
CN (1) CN221236356U (en)

Similar Documents

Publication Publication Date Title
CN109184233B (en) Be used for assembled building element to place connection structure
CN213703183U (en) Assembled is external wallboard clamping device for building
CN113580361A (en) Autoclaved aerated concrete slab manufacturing equipment with closed cavity and process thereof
CN221236356U (en) Building material auxiliary installation equipment
CN109394098A (en) Construction metope automatic cleaning apparatus
CN116927519A (en) Wall body positioner for assembled building
CN211143667U (en) Special automatic installation equipment of building decoration material fiber cement exterior wall cladding
CN212072273U (en) Cutting device is used in building materials processing
CN210281703U (en) Building fire prevention wallboard edging processingequipment
CN209830136U (en) Reinforcing bar processingequipment for construction
CN220928776U (en) Wall body positioner for assembled building
CN214498166U (en) Indoor wall construction structure
CN219777379U (en) Construction engineering reinforcing bar quality detection equipment
CN214220510U (en) Interior wall thermal-insulated coating whitewashes device for house decoration
CN214235495U (en) House building construction dust collector
CN211566510U (en) Cutting equipment of tube wrapping plate
CN216470470U (en) Conveying device for plate production
CN220592142U (en) Pipe welding support frame for pipe truss production
CN220627290U (en) Building site emulation sand table
CN216059591U (en) Work platform for indoor building decoration design
CN219705564U (en) Phosphogypsum partition plate processing equipment
CN219328683U (en) Constructional engineering reinforcing steel bar strength detection device
CN220759649U (en) Building heating and ventilation processing equipment adjusting device
CN220789714U (en) Soft soil foundation waterproof and drainage structure
CN212122903U (en) Adjustable stop device is used in production of gypsum board

Legal Events

Date Code Title Description
GR01 Patent grant