CN221189681U - Tool device for building survey and drawing - Google Patents

Tool device for building survey and drawing Download PDF

Info

Publication number
CN221189681U
CN221189681U CN202322916915.4U CN202322916915U CN221189681U CN 221189681 U CN221189681 U CN 221189681U CN 202322916915 U CN202322916915 U CN 202322916915U CN 221189681 U CN221189681 U CN 221189681U
Authority
CN
China
Prior art keywords
rod
groove
tool device
tool
drawer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322916915.4U
Other languages
Chinese (zh)
Inventor
曲文龙
赵同俊
金绩弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huarui Surveying And Mapping Co ltd
Original Assignee
Suzhou Huarui Surveying And Mapping Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huarui Surveying And Mapping Co ltd filed Critical Suzhou Huarui Surveying And Mapping Co ltd
Priority to CN202322916915.4U priority Critical patent/CN221189681U/en
Application granted granted Critical
Publication of CN221189681U publication Critical patent/CN221189681U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purses, Travelling Bags, Baskets, Or Suitcases (AREA)

Abstract

The utility model discloses a tool device for building surveying and mapping, which relates to the technical field of tool devices, and comprises a tool box, wherein a placing frame is arranged in the tool box in a sliding way, a motor is arranged on the bottom surface of the placing frame, a rotating rod is fixedly sleeved on the outer surface of an output end of the motor, the rotating rod rotates in the placing frame along with the output end of the motor as a center, rotating shafts are fixedly inserted into two ends of the rotating rod, a surveying instrument is placed on the placing frame, then the motor is started, so that the rotating rod can be driven to rotate, then the rotating rod rotates in the placing frame, one end of a connecting rod is driven to rotate on the outer surface of the rotating shaft, and the other end of the connecting rod rotates on the outer surface of a positioning rod, so that an included angle between the rotating rod and the connecting rod is slowly reduced, and then a guide plate can be pulled to move mutually, so that a clamping plate can clamp the surveying instrument, and the damage to the surveying instrument caused by collision during transferring of the surveying instrument is avoided.

Description

Tool device for building survey and drawing
Technical Field
The utility model relates to the technical field of tool devices, in particular to a tool device for building surveying and mapping.
Background
The mapping literal is understood as measurement and drawing, which is based on computer technology, photoelectric technology, network communication technology, space science and information science, and uses Global Navigation Satellite System (GNSS), remote Sensing (RS) and Geographic Information System (GIS) as technical cores, and selects the existing characteristic points and boundary lines of the ground and obtains the graph and position reflecting the current situation of the ground and the related information thereof by measuring means for engineering construction, planning design and administrative management.
When detecting constructional engineering, can use surveying instrument and a lot of instrument, need use the toolbox to accomodate surveying instrument and instrument, current toolbox is direct to mix surveying instrument and put together, leads to when using, is inconvenient for taking it, and put together, in the handling, bumps easily, leads to the surveying instrument impaired, aims at above-mentioned problem, and the inventor proposes a instrument device for architectural survey and drawing is used for solving above-mentioned problem.
Disclosure of utility model
In order to solve the problems that the surveying instrument and the tool are directly mixed together, so that the surveying instrument is inconvenient to take when in use and is placed together, and the surveying instrument is easy to collide in the carrying process, so that the surveying instrument is damaged; the utility model aims to provide a tool device for building surveying and mapping.
In order to solve the technical problems, the utility model adopts the following technical scheme: the utility model provides a tool device for building survey and drawing, includes the toolbox, the toolbox is slided and is equipped with the rack, the motor is installed to the bottom surface of rack, the output surface fixed cover of motor is equipped with the dwang, and the dwang rotates in the rack along with the output of motor as the center, the both ends internal fixation of dwang inserts and is equipped with the pivot, the surface pivoted cover of pivot is equipped with the connecting rod, the top of rack slides in opposite directions and is equipped with the grip block, two the opposite sides of grip block are all fixed and are equipped with first foam-rubber cushion, two the bottom of grip block is all fixed and is equipped with the slider, fixedly connected with deflector between the slider, the fixed locating lever that is equipped with in top surface of deflector, the one end pivoted cover that the pivot was kept away from to the connecting rod is established in the surface of locating lever, the sliding chute is formed in the placing frame, the sliding block is arranged in the sliding chute in a sliding manner, the surveying instrument is placed on the placing frame, then the motor is started, so that the rotating rod can be driven to rotate, then the rotating rod rotates in the placing frame, one end of the connecting rod is driven to rotate on the outer surface of the rotating shaft, the other end of the connecting rod rotates on the outer surface of the positioning rod, the included angle between the rotating rod and the connecting rod is gradually reduced, and then the guide plates can be pulled to move mutually, so that the clamping plate can clamp the surveying instrument, the surveying instrument can be stored, the phenomenon that the surveying instrument is damaged due to collision during transferring is avoided, the electric push rod is started, the placing frame is lowered, and the surveying instrument can be stored in the first storage groove;
The plotting tool is placed in the drawer, through the baffle that sets up, thereby can classify different instruments, so that take when using, then advance the drawer in the second storage tank, the pulling limiting plate, thereby make movable rod drive solid fixed ring and remove in the recess, and squeeze the spring, and make the inserted bar draw out in the slotted hole of seting up in the toolbox, then rotate the limiting plate, loosen the limiting plate, make the inserted bar insert in the slot, and then can fix the drawer, thereby can separate instrument and plotting instrument and deposit, avoid in handling, bump easily, lead to the plotting instrument impaired.
Preferably, a first storage groove is formed in the tool box, an electric push rod is installed in the first storage groove, the output end of the electric push rod is fixedly arranged on the bottom surface of the placing frame, a movable groove is formed in the first storage groove, movable blocks are fixedly arranged on two sides of the placing frame, and the movable blocks are slidably arranged in the movable groove.
Preferably, the second storage groove is formed in the tool box, the drawer is arranged in the second storage groove in a sliding mode, the partition plates distributed at equal intervals are fixedly arranged in the drawer, the second sponge pads are fixedly arranged on two sides of the partition plates, the movable rod is movably inserted in the tool box, the limiting plate is rotatably connected to the outer surface of the movable rod, the inserting rod is symmetrically arranged on one side of the limiting plate, the inserting rod is movably inserted in the drawer, the tool box is internally provided with a groove, one end of the movable rod is fixedly provided with a fixed ring in the groove, a spring is fixedly connected between the groove and the fixed ring, the slot is formed in the drawer, and the inserting rod is movably inserted in the slot.
Compared with the prior art, the utility model has the beneficial effects that:
1. According to the utility model, the surveying instrument is placed on the placing frame, then the motor is started, so that the rotating rod can be driven to rotate, then the rotating rod is driven to rotate in the placing frame, one end of the connecting rod is driven to rotate on the outer surface of the rotating shaft, and the other end of the connecting rod is driven to rotate on the outer surface of the positioning rod, so that the included angle between the rotating rod and the connecting rod is slowly reduced, the guide plate can be pulled to move mutually, the surveying instrument can be clamped by the clamping plate, and the surveying instrument can be stored, so that the situation that the surveying instrument is damaged due to collision during transferring is avoided;
2. According to the utility model, the drawer is pushed into the second storage groove, the limiting plate is pulled, so that the movable rod drives the fixed ring to move in the groove, the spring is extruded, the inserting rod is pulled out of the groove hole formed in the tool box, then the limiting plate is rotated, the limiting plate is loosened, the inserting rod is inserted into the groove, and the drawer can be further fixed, and therefore, a tool and a surveying instrument can be stored separately, and damage to the surveying instrument caused by collision in the carrying process is avoided.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Figure 1 is a schematic diagram of the overall structure of the utility model,
FIG. 2 is a schematic view of a first receiving slot in a partially cross-sectional structure of the utility model,
Figure 3 is a schematic view of a partial cross-sectional structure of the inventive placement frame,
FIG. 4 is a schematic view of a partial cross-sectional structure of a second receiving groove of the present utility model,
Figure 5 is a schematic view of the drawer structure of the present utility model,
Fig. 6 is an enlarged schematic view of the structure of fig. 4a according to the present utility model.
In the figure: 1. a tool box; 101. a first storage groove; 102. a second storage groove; 103. a movable groove; 104. a groove; 11. an electric push rod; 2. a placing rack; 201. a chute; 202. a movable block; 21. a motor; 22. a rotating lever; 23. a rotating shaft; 24. a connecting rod; 25. a positioning rod; 26. a guide plate; 27. a slide block; 28. a clamping plate; 29. a first foam pad; 3. a drawer; 31. a slot; 32. a partition plate; 33. a second sponge pad; 34. a movable rod; 35. a fixing ring; 36. a spring; 37. a limiting plate; 38. and a plunger.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples: as shown in fig. 1-6, the utility model provides a tool device for building mapping, which comprises a tool box 1, the tool box 1 is internally and slidably provided with a placing frame 2, a motor 21 is installed on the bottom surface of the placing frame 2, a rotating rod 22 is fixedly sleeved on the outer surface of the output end of the motor 21, the rotating rod 22 rotates in the placing frame 2 along with the output end of the motor 21 as the center, rotating shafts 23 are fixedly inserted into the two ends of the rotating rod 22, connecting rods 24 are sleeved on the outer surface rotating sleeves of the rotating shafts 23, clamping plates 28 are oppositely and slidably arranged above the placing frame 2, first spongy pads 29 are fixedly arranged on the opposite sides of the two clamping plates 28, sliding blocks 27 are fixedly arranged at the bottom ends of the two clamping plates 28, guide plates 26 are fixedly connected between the sliding blocks 27, a positioning rod 25 is fixedly arranged on the top surface of the guide plates 26, one end of each connecting rod 24 far away from the rotating sleeve on the outer surface of the positioning rod 25, a sliding groove 201 is formed in the placing frame 2, then the motor 21 is fixedly inserted into the two ends of the rotating rod 22, then the rotating rod 22 is driven to rotate, then the rotating rod 22 rotates in the placing frame 2, the upper end of the rotating rod 22 is slidably arranged in the sliding groove 201, and the rotating rod 24 is simultaneously, and the other end of the rotating rod 24 is prevented from being damaged when the rotating rod is gradually and the rotating rod is gradually moved in the opposite directions, and the two clamping plates are further arranged on the outer surface of the rotating rod 24, so that the rotating rod 24 and the rotating rod can be gradually, and the rotating rod can be gradually and the rotating rod 24 and the rotating rod and the measuring rod can be gradually and the rotating rod and the rotating rod to the measuring rod.
A first storage groove 101 is formed in the tool box 1, an electric push rod 11 is installed in the first storage groove 101, the output end of the electric push rod 11 is fixedly arranged on the bottom surface of the placement frame 2, a movable groove 103 is formed in the first storage groove 101, movable blocks 202 are fixedly arranged on two sides of the placement frame 2, and the movable blocks 202 are slidably arranged in the movable groove 103;
Through adopting above-mentioned technical scheme, through opening electric putter 11 to make rack 2 decline, and then can accomodate the surveying instrument in first storage tank 101.
The tool box 1 is internally provided with a second storage groove 102, a drawer 3 is slidably arranged in the second storage groove 102, partition plates 32 distributed at equal intervals are fixedly arranged in the drawer 3, second sponge pads 33 are fixedly arranged on two sides of each partition plate 32, a movable rod 34 is movably inserted in the tool box 1, the outer surface of each movable rod 34 is rotatably connected with a limiting plate 37, one side of each limiting plate 37 is symmetrically provided with an inserting rod 38, each inserting rod 38 is movably inserted in the drawer 3, a groove 104 is formed in the tool box 1, one end of each movable rod 34 is positioned in the corresponding groove 104 and fixedly provided with a fixed ring 35, a spring 36 is fixedly connected between each groove 104 and each fixed ring 35, a slot 31 is formed in each drawer 3, and each inserting rod 38 is movably inserted in each slot 31;
Through adopting above-mentioned technical scheme, put the instrument in drawer 3, baffle 32 through setting up, thereby can classify different instruments, so that take during the use, then advance drawer 3 in the second storage tank 102, pulling limiting plate 37, thereby make movable rod 34 drive solid fixed ring 35 and remove in recess 104, and extrude spring 36, and make the inserted bar 38 take out in the slotted hole of seting up in toolbox 1, then rotate limiting plate 37, loosen limiting plate 37, make inserted bar 38 insert in slot 31, and then can fix drawer 3, thereby can separate instrument and surveying instrument and deposit, avoid bumping easily in the handling, lead to the surveying instrument impaired.
Working principle: placing the surveying instrument on the placement frame 2, then starting the motor 21 so as to drive the rotating rod 22 to rotate, then enabling one end of the connecting rod 24 to rotate on the outer surface of the rotating shaft 23 while the rotating rod 22 rotates in the placement frame 2, enabling the other end of the connecting rod 24 to rotate on the outer surface of the positioning rod 25, enabling the included angle between the rotating rod 22 and the connecting rod 24 to be slowly reduced, and further enabling the guide plate 26 to be pulled to move mutually, and enabling the clamping plate 28 to clamp the surveying instrument, so that the surveying instrument can be stored, avoiding the situation that the surveying instrument collides when being transferred, causing damage to the surveying instrument, and enabling the placement frame 2 to descend by starting the electric push rod 11, and further enabling the surveying instrument to be stored in the first storage groove 101;
the plotting tool is placed in the drawer 3, through the baffle 32 that sets up, thereby can classify different instruments, so that take when using, then with the drawer 3 advance second accomodate inslot 102, pulling limiting plate 37, thereby make movable rod 34 drive solid fixed ring 35 and remove in recess 104, and squeeze spring 36, and make inserted bar 38 draw out in the slotted hole of seting up in toolbox 1, then rotate limiting plate 37, loosen limiting plate 37, make inserted bar 38 insert in slot 31, and then can fix drawer 3, thereby can separate instrument and plotting instrument deposit, avoid bumping easily in the handling, lead to the plotting instrument impaired.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present utility model without departing from the spirit or scope of the utility model. Thus, it is intended that the present utility model also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (8)

1. Tool device for building survey and drawing, including toolbox (1), its characterized in that: the utility model discloses a tool box, including instrument box (1), including rack (2), motor (21) are installed to the bottom surface of rack (2), the output surface fixed cover of motor (21) is equipped with dwang (22), and dwang (22) rotate in rack (2) along with the output of motor (21) as the center, the both ends internal fixation of dwang (22) inserts and is equipped with pivot (23), the surface rotation cover of pivot (23) is equipped with connecting rod (24), the top of rack (2) slides in opposite directions and is equipped with grip block (28), two the opposite side of grip block (28) is all fixed and is equipped with first foam-rubber cushion (29), two the bottom of grip block (28) is all fixed and is equipped with slider (27), fixedly connected with deflector (26) between slider (27), the top surface of deflector (26) is fixed and is equipped with locating lever (25), the one end rotation cover that pivot (23) was kept away from to connecting rod (24) is established in the surface of locating lever (25).
2. A tool device for building surveying and mapping according to claim 1, wherein a chute (201) is formed in the placement frame (2), and the slider (27) is slidably disposed in the chute (201).
3. The tool device for building surveying and mapping according to claim 1, wherein a first storage groove (101) is formed in the tool box (1), an electric push rod (11) is installed in the first storage groove (101), and an output end of the electric push rod (11) is fixedly arranged on the bottom surface of the placement frame (2).
4. A tool device for building surveying and mapping according to claim 3, wherein the first accommodating groove (101) is internally provided with a movable groove (103), two sides of the placing frame (2) are fixedly provided with movable blocks (202), and the movable blocks (202) are slidably arranged in the movable groove (103).
5. The tool device for building surveying and mapping according to claim 1, wherein a second storage groove (102) is formed in the tool box (1), a drawer (3) is slidably arranged in the second storage groove (102), partition plates (32) distributed at equal distances are fixedly arranged in the drawer (3), and second sponge pads (33) are fixedly arranged on two sides of each partition plate (32).
6. The tool device for building surveying and mapping according to claim 5, wherein a movable rod (34) is movably inserted in the tool box (1), a limiting plate (37) is rotatably connected to the outer surface of the movable rod (34), inserting rods (38) are symmetrically arranged on one side of the limiting plate (37), and the inserting rods (38) are movably inserted in the drawer (3).
7. The tool device for building surveying and mapping according to claim 6, wherein a groove (104) is formed in the tool box (1), one end of the movable rod (34) is fixedly provided with a fixed ring (35) in the groove (104), and a spring (36) is fixedly connected between the groove (104) and the fixed ring (35).
8. A tool device for building surveying and mapping according to claim 7, wherein the drawer (3) is provided with a slot (31), and the insert rod (38) is movably inserted into the slot (31).
CN202322916915.4U 2023-10-30 2023-10-30 Tool device for building survey and drawing Active CN221189681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322916915.4U CN221189681U (en) 2023-10-30 2023-10-30 Tool device for building survey and drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322916915.4U CN221189681U (en) 2023-10-30 2023-10-30 Tool device for building survey and drawing

Publications (1)

Publication Number Publication Date
CN221189681U true CN221189681U (en) 2024-06-21

Family

ID=91489563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322916915.4U Active CN221189681U (en) 2023-10-30 2023-10-30 Tool device for building survey and drawing

Country Status (1)

Country Link
CN (1) CN221189681U (en)

Similar Documents

Publication Publication Date Title
CN111707247B (en) Portable geographic information surveying instrument of geographic information acquisition device
CN111503471A (en) Fixing device for on-site surveying and mapping with surveying and mapping instrument main body storage structure
CN221189681U (en) Tool device for building survey and drawing
CN213840219U (en) High-stability surveying and mapping device
CN211060883U (en) Area measuring instrument for land planning design
CN218268214U (en) Sopwith staff of land survey and drawing usefulness
CN206638227U (en) A kind of new RTK measuring instruments for power circuit exploration
CN110617806A (en) Portable positioner for engineering survey and drawing
CN213292993U (en) Can carry out containing box that supports to multiple surveying instrument
CN213954845U (en) Building mapping device based on BIM
CN210774800U (en) Sampling device for soil detection
CN213274265U (en) Portable topographic surveying and mapping device
CN209769349U (en) Novel engineering cost budget toolbox
CN220975152U (en) Surveying and mapping equipment box
CN221222135U (en) Engineering measurement's fixed point mapping device
CN112595296A (en) Big dipper high accuracy survey and drawing of field collection system is equipped
CN220542054U (en) Portable engineering is with slope angle measuring tool
CN211317291U (en) Surveying equipment for planning
CN216243036U (en) Survey and drawing support of using in ditch
CN219214558U (en) Multifunctional drawing tool
CN215037340U (en) Get and put easy measurement and detection toolbox
CN214747973U (en) On-spot mapping device that engineering cost used
CN216348583U (en) High-precision strip type level gauge for geographic information surveying and mapping
CN212871214U (en) Portable engineering measuring device
CN214215295U (en) Surveying and mapping data acquisition and recording device

Legal Events

Date Code Title Description
GR01 Patent grant