CN221141026U - Green building intelligent installation equipment - Google Patents

Green building intelligent installation equipment Download PDF

Info

Publication number
CN221141026U
CN221141026U CN202323213181.XU CN202323213181U CN221141026U CN 221141026 U CN221141026 U CN 221141026U CN 202323213181 U CN202323213181 U CN 202323213181U CN 221141026 U CN221141026 U CN 221141026U
Authority
CN
China
Prior art keywords
sliding plate
storage box
clamping
fixedly arranged
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323213181.XU
Other languages
Chinese (zh)
Inventor
李东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Dinghe Taihua Technology Development Co ltd
Original Assignee
Beijing Dinghe Taihua Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dinghe Taihua Technology Development Co ltd filed Critical Beijing Dinghe Taihua Technology Development Co ltd
Priority to CN202323213181.XU priority Critical patent/CN221141026U/en
Application granted granted Critical
Publication of CN221141026U publication Critical patent/CN221141026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model belongs to the field of constructional engineering, in particular to intelligent green building installation equipment, aiming at the problems that when goods are transported to a designated place, the equipment can be released after the goods are manually carried out and emptied, the equipment returns to the original position to carry out the next operation, and the working time is wasted.

Description

Green building intelligent installation equipment
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to intelligent installation equipment for a green building.
Background
After a large amount of building materials are transported to a building site through carrying tools such as trucks and the like in building construction, the building materials are required to be transported to a designated position, so that the building materials are convenient for workers to take and use, and the traditional building materials are required to be transported manually, so that the efficiency is low and the labor capacity is high;
Through retrieving, the utility model with the bulletin number of CN217921156U discloses novel intelligent installation equipment for building decoration engineering construction, which comprises a base, be equipped with protecting sheathing on the base, be equipped with lift transport mechanism in the protecting sheathing, be equipped with the extension board on the lift transport mechanism, be equipped with the roof on the extension board, be equipped with under the roof and get and put manipulator clamping mechanism, be equipped with material temporary storage assembly under the extension board. The utility model belongs to the technical field of building decoration engineering, and particularly relates to novel intelligent mounting equipment for building decoration engineering construction, which is capable of automatically clamping and conveying materials, effectively improving construction efficiency and reducing personnel labor force.
The following drawbacks remain when the device is in use:
when the goods are placed in the containing basket and conveyed to the appointed place, the equipment can be released only after the goods in the containing basket are manually carried out and emptied, so that the equipment returns to the original position again to carry out the next carrying, the operation is inconvenient, the time in the operation is wasted, and the efficiency is reduced.
Disclosure of utility model
The utility model aims to solve the defects that in the prior art, when a goods placed in a containing basket is transported to a designated place, the goods in the containing basket are manually carried out and emptied to release equipment, so that the equipment returns to the original position again to carry out the next carrying, the operation is inconvenient, the time in the working is wasted and the efficiency is reduced, and provides the intelligent installation equipment for the green building.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The intelligent green building installation device comprises a base and a clamping assembly, wherein the clamping assembly is positioned on one side of the base, a supporting column is fixedly arranged at the top of the base, a connecting block is arranged on one side of the supporting column, an L-shaped plate is fixedly arranged on one side, far away from the supporting column, of the connecting block, and the clamping assembly and the inner wall of the bottom of the L-shaped plate are fixedly arranged;
an auxiliary assembly for facilitating unloading is arranged on one side of the accommodating basket, close to the supporting column;
The auxiliary assembly comprises an opening formed in one side, close to the support column, of the containing basket, a storage box is slidably arranged in the containing basket, openings are formed in two sides of the storage box, and a locking assembly used for locking the storage box is arranged in one side, close to the support column, of the storage box.
In one possible design, the bottom inner wall of support column is fixed to be provided with the second servo motor, the output shaft of second servo motor is fixed to be provided with the threaded rod, and the top of threaded rod and the top inner wall of support column rotate the setting, slide between the both sides inner wall of support column and be provided with same movable block, the support column screw thread runs through the movable block, the one end of connecting block is slided and is run through the support column, and the fixed setting in one side that connecting block and movable block are close to each other.
In one possible design, the locking assembly comprises a sliding plate which is arranged inside one side of the storage box close to the support column in a sliding manner, the sliding plate is located above the opening, the bottom of the sliding plate slides to penetrate through the storage box and is located inside the opening, two springs are arranged between the top of the sliding plate and the inner wall of the top of the storage box, clamping grooves are formed in the inner walls of two sides of the containing basket and are close to one end of the sliding plate, and clamping assemblies which are clamped with the clamping grooves are arranged on two sides of the bottom of the sliding plate.
In a possible design, the block subassembly is including all sliding the second rack that sets up in slide plate bottom both sides, and two second racks are located the open-ended both sides respectively, the storage case is located the inside rotation of slide plate one side and is provided with two gears, and two gears all are located one side that two second racks kept away from each other and mesh with two second racks respectively, the storage case is located the inside slip of slide plate one side and is provided with two first racks, and two first racks all are located the bottom of two gears and mesh with two gears respectively, two gears respectively with two draw-in grooves looks block.
In one possible design, the storage box is provided with the stopper in the inside slip of slide plate one side, and the stopper is located one side of slide plate, T type groove has all been seted up to the top both sides of slide plate, the inner wall slip in T type groove is provided with the T shaped plate, and the bottom mounting setting of the top and the spring of T shaped plate.
In one possible design, four balancing weights are arranged at the top of the base, clamping rods are fixedly arranged on four sides of the outer wall of the supporting column, and the clamping rods and the balancing weights are in plug-in connection.
In the application, when the material is specifically used, the material is clamped and fixed through the clamping assembly, the first servo motor is started at the moment, the output shaft of the first servo motor drives the containing basket to rotate, the containing basket drives the material storage box to rotate to the bottom of the clamping assembly, the fixing effect of the clamping assembly is released at the moment, the goods is temporarily stored in the material storage box, the second servo motor is started at the moment, the output shaft of the second servo motor drives the threaded rod to rotate, the threaded rod drives the moving block to move downwards, the moving block drives the connecting block to move, the connecting block drives the containing basket to move, the containing basket moves the material up and down through the material storage box, so that the material is placed in the material storage box through the clamping assembly and transported to a designated place, and the weight of the transported material can be used in the process, the balancing weight is installed to the bottom of the equipment through the clamping rod on the outer wall of the supporting column, the equipment is prevented from losing balance due to heavy materials, the equipment is prevented from being turned on one's side, then a worker firstly moves the sliding plate located inside the opening, the sliding plate is separated from the lower portion of the limiting block, at the moment, the sliding plate is upwards moved through holding the handle formed above the opening, the second rack is driven to upwards move through the sliding plate, the second rack drives the gear to rotate, the gear drives the first rack to inwards move, the first rack is enabled to be separated from the inside of the clamping groove, the storage box can be pulled out of the basket to achieve the effect of unloading, the empty storage box is placed into the basket to achieve rapid unloading, the equipment returns to the original position for next loading, the time is shortened, and the working efficiency is improved.
According to the intelligent installation equipment for the green building, the fixing effect of the storage box on the equipment can be controlled by controlling the vertical movement of the sliding plate in the auxiliary assembly, and the effects of rapidly unloading and increasing efficiency are achieved after the equipment conveys materials to a designated place in sequence;
according to the intelligent installation equipment for the green building, the horizontal movement of the sliding plate in the auxiliary assembly is controlled, so that a certain protection effect on the fixation of the storage box can be achieved, the situation that the sliding plate is touched by mistake is prevented, and the fixation state is relieved during transportation;
In the utility model, when in use, the goods are clamped and fixed through the clamping component, are placed into the accommodating basket, are transported to the appointed position and are lifted to the appointed height;
And then, the auxiliary assembly can be used for rapidly unloading the materials, so that the equipment can return immediately to charge for the next time, the working time is saved, and the efficiency is improved.
Drawings
Fig. 1 is a schematic main structure diagram of an intelligent installation device for a green building;
fig. 2 is a schematic diagram of a front cross-sectional structure of a main body of the intelligent installation device for green building according to the present utility model;
FIG. 3 is a schematic three-dimensional structure of a green building intelligent installation device accommodating basket according to the utility model;
FIG. 4 is a schematic side view cross-sectional structure of a storage box for intelligent installation equipment of a green building according to the present utility model;
fig. 5 is a schematic three-dimensional structure of an auxiliary assembly of the intelligent installation device for the green building;
Fig. 6 is a schematic three-dimensional structure diagram of the green building intelligent installation equipment balancing weight provided by the utility model.
In the figure: 1. a base; 2. a support column; 3. a connecting block; 4. a clamping assembly; 5. a holding basket; 6. a first servo motor; 7. a threaded rod; 8. a moving block; 9. a second servo motor; 10. a storage bin; 11. an opening; 12. a sliding plate; 13. a first rack; 14. a spring; 15. a limiting block; 16. a second rack; 17. a gear; 18. a clamping groove; 19. a T-shaped plate; 20. a T-shaped groove; 21. balancing weight; 22. an L-shaped plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Example 1
Referring to fig. 1-2, a green building intelligent installation apparatus for use in the field of construction engineering, comprising: the clamping assembly 4 is positioned on one side of the base 1, a support column 2 is fixedly arranged at the top of the base 1, a connecting block 3 is arranged on one side of the support column 2, an L-shaped plate 22 is fixedly arranged on one side of the connecting block 3 away from the support column 2, the clamping assembly 4 and the inner wall of the bottom of the L-shaped plate 22 are fixedly arranged, a first servo motor 6 is fixedly arranged at the bottom of the L-shaped plate 22, and a containing basket 5 is fixedly arranged on an output shaft of the first servo motor 6;
The technical scheme can achieve the effects that materials are clamped and fixed through the clamping assembly 4, the first servo motor 6 is started at the moment, and the output shaft of the first servo motor 6 drives the containing basket 5 to rotate to the bottom of the clamping assembly 4.
Referring to fig. 2, a second servo motor 9 is fixedly arranged on the inner wall of the bottom of the support column 2, a threaded rod 7 is fixedly arranged on an output shaft of the second servo motor 9, the top end of the threaded rod 7 and the inner wall of the top of the support column 2 are rotatably arranged, the same moving block 8 is slidably arranged between the inner walls of the two sides of the support column 2, the support column 2 is threaded through the moving block 8, one end of the connecting block 3 is slidably penetrated through the support column 2, and one side, close to each other, of the connecting block 3 and the moving block 8 is fixedly arranged;
universal wheels are arranged at four corners of the bottom of the base 1.
Above-mentioned technical scheme can reach after temporarily storing the inside of workbin 10 with the goods, restarts second servo motor 9, and the output shaft of second servo motor 9 can drive threaded rod 7 and rotate, and threaded rod 7 drives movable block 8 and carries out the downwardly moving, and movable block 8 drives connecting block 3 and remove, and connecting block 3 drives and holds basket 5 and remove, holds basket 5 and carries out the reciprocates with the material through storing the workbin 10 to reach and transport the material to assigned position and high effect.
Referring to fig. 3, the side of the basket 5 adjacent to the support column 2 is provided with an auxiliary assembly for facilitating unloading;
the auxiliary assembly comprises an opening 11 formed in one side, close to the support column 2, of the containing basket 5, a storage box 10 is slidably arranged in the containing basket 5, the openings 11 are formed in two sides of the storage box 10, and a locking assembly for locking the storage box 10 is arranged in one side, close to the support column 2, of the storage box 10;
The above-mentioned technical scheme can reach and will be through quick unlocking the locking subassembly for storage case 10 breaks away from equipment, reaches and carries out quick discharge with the material, makes equipment return immediately, carries out the loading of next time, saves its operating time, improves the effect of efficiency.
Example 2
Referring to fig. 6, the improvement is based on example 1: four balancing weights 21 are arranged at the top of the base 1, clamping rods are fixedly arranged on four sides of the outer wall of the supporting column 2, and the clamping rods and the balancing weights 21 are in plug-in connection;
The technical scheme can achieve the effect of preventing equipment from losing balance due to heavy materials by installing the balancing weights 21 to the bottom of the equipment through the clamping rods on the outer walls of the supporting columns 2 according to the weight of the transported materials in the process of loading and transporting, thereby preventing the equipment from side turning.
Referring to fig. 5, a limit block 15 is slidably disposed in the storage box 10 on one side of the sliding plate 12, and the limit block 15 is disposed on one side of the sliding plate 12, T-shaped grooves 20 are formed in two sides of the top of the sliding plate 12, T-shaped plates 19 are slidably disposed on inner walls of the T-shaped grooves 20, and the top of the T-shaped plates 19 and the bottom end of the springs 14 are fixedly disposed.
The above technical scheme can achieve the effect of conveying the materials to the appointed place, and then the worker firstly moves the sliding plate 12 positioned in the opening 11, so that the sliding plate is separated from the lower part of the limiting block 15, and the protection state of the sliding plate is relieved.
Referring to fig. 3-5, the improvement over example 1: the locking assembly comprises a sliding plate 12 which is arranged in one side of the storage box 10 close to the support column 2 in a sliding manner, the sliding plate 12 is positioned above the opening 11, the bottom of the sliding plate 12 penetrates through the storage box 10 in a sliding manner and is positioned in the opening 11, two springs 14 are arranged between the top of the sliding plate 12 and the inner wall of the top of the storage box 10, clamping grooves 18 are formed in the inner walls of the two sides of the containing basket 5 and are close to one end of the sliding plate 12, and clamping assemblies which are clamped with the clamping grooves 18 are arranged on the two sides of the bottom of the sliding plate 12;
The clamping assembly comprises second racks 16 which are arranged on two sides of the bottom of the sliding plate 12 in a sliding manner, the two second racks 16 are respectively positioned on two sides of the opening 11, the storage box 10 is positioned in one side of the sliding plate 12, two gears 17 are rotatably arranged in the storage box, the two gears 17 are respectively positioned on one side of the two second racks 16 far away from each other and are respectively meshed with the two second racks 16, two first racks 13 are slidably arranged in the storage box 10 positioned on one side of the sliding plate 12, the two first racks 13 are respectively positioned at the bottoms of the two gears 17 and are respectively meshed with the two gears 17, and the two gears 17 are respectively clamped with two clamping grooves 18;
According to the technical scheme, after the protection effect can be relieved, the handle formed above the opening 11 is held, the purpose of upwards moving the sliding plate 12 is achieved, the sliding plate 12 drives the second rack 16 to upwards move, the second rack 16 drives the gear 17 to rotate, the gear 17 drives the first rack 13 to inwards move, the first rack 13 is separated from the inside of the clamping groove 18, the storage box 10 can be pulled out of the storage basket 5 at the moment, the unloading effect is achieved, the empty storage box 10 is placed in the storage basket 5, rapid unloading is achieved, the equipment returns to the original position to carry out next loading, the time is shortened, and the work efficiency is improved.
However, as well known to those skilled in the art, the working principles and wiring methods of the first servomotor 6 and the second servomotor 9 are common, which are all conventional means or common knowledge, and are not described herein in detail, and any choice can be made by those skilled in the art according to their needs or convenience.
The clamping component 4 is the same as the clamping component of the novel intelligent installation equipment for building decoration engineering construction in the utility model with the bulletin number of CN217921156U, and has the specific structure that:
The clamping mechanism comprises lifting cylinders, telescopic cylinders and clamping plates, wherein the lifting cylinders are arranged in a plurality of groups and are uniformly arranged below the top plate, a support is arranged below the lifting cylinders, the telescopic cylinders are arranged in the support, the output ends of the telescopic cylinders penetrate through the bottom wall of the support and are provided with connecting plates, limiting rails are arranged below the two ends of the bottom wall of the support, the clamping plates are connected onto the limiting rails in a sliding clamping mode, the clamping plates are hinged to the top ends of the clamping plates, one ends, far away from the clamping plates, of the connecting shafts are hinged to the connecting plates, and the connecting shafts are arranged on two groups of one sides of the connecting plates and are parallel to each other.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. The intelligent green building installation equipment comprises a base (1) and a clamping assembly (4), wherein the clamping assembly (4) is located on one side of the base (1), a support column (2) is fixedly arranged at the top of the base (1), a connecting block (3) is arranged on one side of the support column (2), an L-shaped plate (22) is fixedly arranged on one side, far away from the support column (2), of the connecting block (3), the clamping assembly (4) and the bottom inner wall of the L-shaped plate (22) are fixedly arranged, and the intelligent green building installation equipment is characterized in that a first servo motor (6) is fixedly arranged at the bottom of the L-shaped plate (22), and a basket (5) is fixedly arranged on an output shaft of the first servo motor (6);
an auxiliary assembly for facilitating unloading is arranged on one side of the accommodating basket (5) close to the supporting column (2);
The auxiliary assembly comprises an opening (11) formed in one side, close to the support column (2), of the containing basket (5), a storage box (10) is slidably arranged in the containing basket (5), the openings (11) are formed in two sides of the storage box (10), and a locking assembly used for locking the storage box (10) is arranged in one side, close to the support column (2), of the storage box (10).
2. The intelligent green building installation device according to claim 1, wherein a second servo motor (9) is fixedly arranged on the inner wall of the bottom of the supporting column (2), a threaded rod (7) is fixedly arranged on an output shaft of the second servo motor (9), the top end of the threaded rod (7) and the inner wall of the top of the supporting column (2) are rotatably arranged, the same moving block (8) is slidably arranged between the inner walls of the two sides of the supporting column (2), threads of the supporting column (2) penetrate through the moving block (8), one end of the connecting block (3) slidably penetrates through the supporting column (2), and one side, close to each other, of the connecting block (3) and the moving block (8) is fixedly arranged.
3. The intelligent green building installation device according to claim 1, wherein the locking assembly comprises a sliding plate (12) which is arranged inside one side of the storage box (10) close to the support column (2), the sliding plate (12) is located above the opening (11), the bottom of the sliding plate (12) penetrates through the storage box (10) in a sliding manner and is located inside the opening (11), two springs (14) are arranged between the top of the sliding plate (12) and the top inner wall of the storage box (10), clamping grooves (18) are formed in the inner walls of two sides of the containing basket (5) and are close to one ends of the sliding plate (12), and clamping assemblies which are clamped with the clamping grooves (18) are arranged on two sides of the bottom of the sliding plate (12).
4. The intelligent green building installation device according to claim 3, wherein the clamping assembly comprises second racks (16) which are slidably arranged on two sides of the bottom of the sliding plate (12), the two second racks (16) are respectively located on two sides of the opening (11), the storage box (10) is located on one side of the sliding plate (12), two gears (17) are rotatably arranged in the interior of the side, and the two gears (17) are respectively located on one side, away from each other, of the two second racks (16) and are respectively meshed with the two second racks (16), the storage box (10) is located on one side of the sliding plate (12), two first racks (13) are slidably arranged in the interior of the side, the two first racks (13) are respectively located on the bottoms of the two gears (17) and are respectively meshed with the two gears (17), and the two gears (17) are respectively clamped with the two clamping grooves (18).
5. The intelligent green building installation device according to claim 4, wherein a limiting block (15) is arranged in the storage box (10) on one side of the sliding plate (12) in a sliding manner, the limiting block (15) is arranged on one side of the sliding plate (12), T-shaped grooves (20) are formed in two sides of the top of the sliding plate (12), T-shaped plates (19) are arranged on the inner walls of the T-shaped grooves (20) in a sliding manner, and the top of the T-shaped plates (19) and the bottom end of the springs (14) are fixedly arranged.
6. The intelligent green building installation device according to claim 1, wherein four balancing weights (21) are arranged at the top of the base (1), clamping rods are fixedly arranged on four sides of the outer wall of the supporting column (2), and the clamping rods and the balancing weights (21) are in plug-in connection.
CN202323213181.XU 2023-11-28 2023-11-28 Green building intelligent installation equipment Active CN221141026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323213181.XU CN221141026U (en) 2023-11-28 2023-11-28 Green building intelligent installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323213181.XU CN221141026U (en) 2023-11-28 2023-11-28 Green building intelligent installation equipment

Publications (1)

Publication Number Publication Date
CN221141026U true CN221141026U (en) 2024-06-14

Family

ID=91386857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323213181.XU Active CN221141026U (en) 2023-11-28 2023-11-28 Green building intelligent installation equipment

Country Status (1)

Country Link
CN (1) CN221141026U (en)

Similar Documents

Publication Publication Date Title
CN210392780U (en) Equipment for automatically transferring stator casing tray
CN221141026U (en) Green building intelligent installation equipment
CN207258768U (en) Stacking formula feed bin
CN210312032U (en) Tray recovery device
CN116177086A (en) Telescopic mechanism capable of freely increasing and decreasing number of stages and intelligent goods shelf with telescopic mechanism
CN214114150U (en) Feeding and discharging mechanism
CN214878565U (en) Production overturning platform for building external wall panel
CN209956710U (en) Automatic feeding and discharging storage bin
CN217674385U (en) Bagged cement goods shelf convenient to assemble and disassemble
CN112777162A (en) Container for transporting coiled steel
CN220115654U (en) Material box is with frame that gathers materials
CN113998564B (en) Modular section steel floor unloading platform for construction site
CN215665954U (en) Robot stacking device
CN111573180B (en) Automatic stores pylon equipment of cell-phone battery case of unloading on both sides
CN220642441U (en) Material lifting machine
CN113526173B (en) Make things convenient for discharge apparatus that fragment of brick was lifted off
CN221459797U (en) Fixed scissor type lifting platform
CN217972403U (en) A finished product lifting machine in bags for buckwheat powder process processing
CN220375478U (en) Material taking and placing device for stereoscopic warehouse shelf
CN220975418U (en) Stereoscopic warehouse stacker
CN213503066U (en) Quick packaging machine for plate glass
CN208307636U (en) A kind of mobile three-dimensional warehouse
CN221249284U (en) Concrete curing room
CN218544966U (en) Semi-finished bread rapid freezing refrigeration house
CN221025115U (en) Logistics cargo carrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant