CN221140893U - Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine - Google Patents
Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine Download PDFInfo
- Publication number
- CN221140893U CN221140893U CN202323165227.5U CN202323165227U CN221140893U CN 221140893 U CN221140893 U CN 221140893U CN 202323165227 U CN202323165227 U CN 202323165227U CN 221140893 U CN221140893 U CN 221140893U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- steel
- anchor clamps
- steel sheet
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 111
- 239000010959 steel Substances 0.000 title claims abstract description 111
- 238000009434 installation Methods 0.000 title claims description 8
- 238000010276 construction Methods 0.000 claims abstract description 4
- 230000000149 penetrating effect Effects 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 241000357293 Leptobrama muelleri Species 0.000 claims description 4
- 238000004873 anchoring Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a steel structure hanging bracket device for mounting a small prefabricated lattice stalk lifting machine, which comprises the following components: the two ends and the middle of the upper steel plate are respectively provided with three groups of lug plates, round steel main shafts are arranged in the middle of the three groups of lug plates in a penetrating manner, the round steel main shafts sequentially penetrate through three groups of lower supporting frames, and the lower supporting frames are respectively clamped in the middle of the lug plates; the lower support frame includes: the steel plate of the support frame, the one end and the left anchor clamps steel plate of support frame steel plate rotate to be connected, the other end and the right anchor clamps steel plate of support frame steel plate rotate to be connected, left anchor clamps steel plate is the fork rotation with the right anchor clamps steel plate and is connected, wears to be equipped with the round steel pivot as the connecting axle in the middle, left anchor clamps steel plate and right anchor clamps steel plate lower extreme fixedly connected with clamp mouth steel plate respectively, fixed mounting rubber backing plate on the clamp mouth steel plate. The device can be used for hoisting in a prefabricated field, so that the time for binding the hook when using the hoisting rigging is reduced, and the construction efficiency is improved conveniently and rapidly.
Description
Technical Field
The utility model relates to the technical field of steel structure hanging frame devices, in particular to a steel structure hanging frame device for mounting a small prefabricated lattice stem lifting machine.
Background
The prefabricated lattice stems which need to be lifted are 60cm in height, 40cm in width and 150cm in length, the components are small in size, a reinforced concrete structure is formed, stable lifting points cannot be arranged, and the prefabricated lattice stems are difficult to lift and ship from a prefabricated field. The steel wire rope is not easy to be firmly bound during the installation of the crane ship, and the steel wire rope is used for binding, so that the corners are easy to be damaged, and a device capable of simply and conveniently hoisting is needed to hoist small-sized prefabricated lattice stems.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a steel structure hanging bracket device for mounting a small-sized prefabricated lattice stem lifting machine.
The utility model adopts the following technical scheme to realize the aim:
The utility model provides a small-size prefabricated check stalk handling machine installation is with steel construction gallows device, include: the two ends and the middle of the upper steel plate are respectively provided with three groups of lug plates, round steel main shafts are arranged in the middle of the three groups of lug plates in a penetrating manner, the round steel main shafts sequentially penetrate through three groups of lower supporting frames, and the lower supporting frames are respectively clamped in the middle of the lug plates; the lower support frame includes: the support frame steel sheet, the one end of support frame steel sheet is rotated as the pivot with left anchor clamps steel sheet and is connected, the other end of support frame steel sheet is rotated as the pivot with right anchor clamps steel sheet through right round steel back shaft and is connected, left anchor clamps steel sheet is cross-shaped rotation with right anchor clamps steel sheet and is connected, wears to be equipped with round steel pivot as the connecting axle in the middle, left anchor clamps steel sheet and right anchor clamps steel sheet lower extreme fixedly connected with clamp mouth steel sheet respectively, use rubber backing plate anchor bolt fixed mounting rubber backing plate on the clamp mouth steel sheet.
Preferably, a hanging hole is formed in the middle of the upper steel plate.
Preferably, three groups of reinforcing lug plates are arranged on the clamping opening steel plate, and the lower ends of the left clamp steel plate and the right clamp steel plate are respectively clamped in the middle of the reinforcing lug plates and are connected and reinforced by anchor bolts.
Preferably, tension springs are connected between the lower ends of the left clamp steel plate and the right clamp steel plate and the clamping mouth steel plate at the two ends of the device.
The beneficial effects of the utility model are as follows: the utility model can directly clamp and load the small prefabricated lattice stems after the large-tonnage forklift or the small truck crane is used for fixing in a prefabricated field, and can directly hoist and load the small prefabricated lattice stems by using the floating crane hook, so that the device can be used for hoisting on site, the time for binding the hooks when using the hoisting rigging is reduced, and the construction efficiency is improved conveniently and rapidly.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a side view of the structure of the present utility model;
In the figure: 1-upper steel plate; 2-ear plates; 3-a round steel main shaft; 4-supporting a steel plate; 5-left clamp steel plate; 6-left round steel support shaft; 7-right clamp steel plate; 8-right round steel support shaft; 9-clamping steel plates; 10-hanging holes; 11-reinforcing the ear plate; 12-anchoring bolts; 13-anchoring bolts of the rubber backing plate; 14-a rubber backing plate; 15-a round steel rotating shaft;
the embodiments of the present utility model will be described in detail below with reference to the accompanying drawings.
Detailed Description
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
As shown in fig. 1-2, a steel structure hanger device for mounting a small prefabricated stem crane comprises: the steel plate comprises an upper steel plate 1, wherein three groups of lug plates 2 are respectively arranged at two ends and in the middle of the upper steel plate 1, round steel main shafts 3 are arranged in the middle of the three groups of lug plates 2 in a penetrating manner, the round steel main shafts 3 sequentially penetrate through three groups of lower supporting frames, and the lower supporting frames are respectively clamped in the middle of the lug plates 2; the lower support frame includes: the support frame steel sheet 4, the one end of support frame steel sheet 4 is rotated as the pivot with left anchor clamps steel sheet 5 and is connected, the other end of support frame steel sheet 4 is rotated as the pivot with right anchor clamps steel sheet 7 through right round steel back shaft 8 and is connected, left anchor clamps steel sheet 5 is the cross rotation with right anchor clamps steel sheet 7 and is connected, wears to be equipped with round steel pivot 15 as the connecting axle in the centre, left anchor clamps steel sheet 5 and right anchor clamps steel sheet 7 lower extreme fixedly connected with clamp mouth steel sheet 9 respectively. And the rubber backing plate 14 is fixedly arranged on the clamping opening steel plate 9 by using a rubber backing plate anchoring bolt 13.
When the prefabricated lattice stems are lifted, friction force is generated between the prefabricated lattice stems and the rubber backing plates 14, the left clamp steel plates 5 and the right clamp steel plates 7 which are in cross connection are driven to be folded towards the central line naturally, so that the clamping opening steel plates 9 on the two sides are pressed inwards to clamp the prefabricated lattice stems, and the purpose of self locking is achieved, so that the prefabricated lattice stems are lifted along with the lifting frame device.
As shown in fig. 2, a hanging hole 10 is formed in the middle of the upper steel plate 1. The device and the prefabricated lattice stems are lifted by means of lifting slings or hooks which are connected to the lifting device through lifting holes 10.
As shown in fig. 1-2, three groups of reinforcing lug plates 11 are arranged on the clamping opening steel plate 9, and the lower ends of the left clamp steel plate 5 and the right clamp steel plate 7 are respectively clamped in the middle of the reinforcing lug plates 11 and are connected and reinforced by anchor bolts 12. Tension springs are connected between the lower ends of the left clamp steel plate 5 and the right clamp steel plate 7 and the clamping mouth steel plate 9 at the two ends of the device.
In summary, when the prefabricated lattice stems are lifted, the lifting device lifts the hanger device, the hanger device runs to the prefabricated lattice stems, the manual auxiliary alignment of the prefabricated lattice stems is carried out, the lower opening of the hanger device is put down from the top of the prefabricated lattice stems, the lifting device slowly lifts the hanger device, the hanger device clamps the prefabricated lattice stems, the manual auxiliary loading is carried to a loading place after the hanger device stays for a moment, the floating crane also lifts the prefabricated lattice stems to load the ship at the loading place, after the floating crane is carried to an installation place, the lifting member is rotated to the installation place, the manual auxiliary slow lower part is moved to the design position, the hanger device releases the clamp, and the installation is completed.
While the utility model has been described above with reference to the accompanying drawings, it will be apparent that the utility model is not limited to the above embodiments, but is intended to cover various modifications, either made by the method concepts and technical solutions of the utility model, or applied directly to other applications without modification, within the scope of the utility model.
Claims (4)
1. Steel construction gallows device is used in installation of small-size prefabricated check stalk handling machine, a serial communication port, include: the steel plate comprises an upper steel plate (1), wherein three groups of lug plates (2) are respectively arranged at two ends and in the middle of the upper steel plate (1), round steel main shafts (3) are arranged in the middle of the three groups of lug plates (2) in a penetrating manner, the round steel main shafts (3) sequentially penetrate through three groups of lower supporting frames, and the lower supporting frames are respectively clamped in the middle of the lug plates (2); the lower support frame includes: the support frame steel sheet (4), the one end and the left anchor clamps steel sheet (5) of support frame steel sheet (4) are rotated as the pivot through left round steel back shaft (6) and are connected, the other end and the right anchor clamps steel sheet (7) of support frame steel sheet (4) are rotated as the pivot through right round steel back shaft (8), left side anchor clamps steel sheet (5) are rotated with right anchor clamps steel sheet (7) and are connected in the middle of crossing, wear to be equipped with round steel pivot (15) as the connecting axle in the middle, left side anchor clamps steel sheet (5) and right anchor clamps steel sheet (7) lower extreme fixedly connected with clamp mouth steel sheet (9) respectively, with rubber backing plate anchor bolt (13) fixed mounting rubber backing plate (14) on clamp mouth steel sheet (9).
2. The steel structure hanging bracket device for mounting a small prefabricated lattice stem lifting machine according to claim 1, wherein a hanging hole (10) is formed in the middle of the upper steel plate (1).
3. The steel structure hanging bracket device for mounting the small prefabricated stem lifting machine according to claim 1, wherein three groups of reinforcing lug plates (11) are arranged on the clamping opening steel plate (9), and the lower ends of the left clamp steel plate (5) and the right clamp steel plate (7) are respectively clamped between the reinforcing lug plates (11) and are connected and reinforced by anchor bolts (12).
4. The steel structure hanging bracket device for mounting the small prefabricated stem lifting machine, which is characterized in that tension springs are connected between the lower ends of the left clamp steel plate (5) and the right clamp steel plate (7) at two ends of the device and the clamping opening steel plate (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323165227.5U CN221140893U (en) | 2023-11-23 | 2023-11-23 | Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323165227.5U CN221140893U (en) | 2023-11-23 | 2023-11-23 | Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221140893U true CN221140893U (en) | 2024-06-14 |
Family
ID=91384687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323165227.5U Active CN221140893U (en) | 2023-11-23 | 2023-11-23 | Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221140893U (en) |
-
2023
- 2023-11-23 CN CN202323165227.5U patent/CN221140893U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN221140893U (en) | Steel structure hanging bracket device for installation of small prefabricated lattice stalk lifting machine | |
CN216764087U (en) | Anti-rolling device of crane | |
JPS6241192A (en) | Counterbalance crane | |
CN214456373U (en) | High-efficient rotatory portable construction equipment hoist device | |
CN214114710U (en) | Building engineering hoist device | |
CN210012558U (en) | Curb hoist and mount handling tool car | |
JPH061585A (en) | Automatic slinging work hoisting accessory for roll with bearing housing | |
CN208308244U (en) | A kind of steel structure column Hoisting Security detacher | |
CN218909587U (en) | T-shaped beam lifting device | |
CN2474507Y (en) | Crane gib arm flexible dynamic balancing waist rope device | |
CN221216824U (en) | Anti-swing outdoor portal crane | |
CN214879544U (en) | Steel plate lifting hook | |
CN219449059U (en) | Lifting appliance for crane maintenance | |
CN212222182U (en) | Hydraulic guardrail precast block hoisting device | |
CN215626312U (en) | Wind power equipment lifting device with anti-toppling mechanism | |
CN218320372U (en) | Auxiliary hanger frame for road and bridge construction | |
CN212334355U (en) | Hoisting clamp for cylindrical steel ingot | |
CN217808406U (en) | Install in hoist cable wind system | |
CN221116652U (en) | Precast box girder hoist device | |
CN214828576U (en) | Self-discharging device for tower crane counterweight | |
CN221253601U (en) | Remote control square steel gripping apparatus | |
CN215626202U (en) | Auxiliary tool for hoisting assembled steel beam | |
JP2562475Y2 (en) | Counterweight attachment / detachment device for construction machinery | |
CN212668953U (en) | Clamping device for hoisting steel plate | |
CN220098302U (en) | Municipal road pipeline hoisting clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |