CN221090950U - Building construction conveyer - Google Patents

Building construction conveyer Download PDF

Info

Publication number
CN221090950U
CN221090950U CN202323313282.4U CN202323313282U CN221090950U CN 221090950 U CN221090950 U CN 221090950U CN 202323313282 U CN202323313282 U CN 202323313282U CN 221090950 U CN221090950 U CN 221090950U
Authority
CN
China
Prior art keywords
shell
wall
spring
gear
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323313282.4U
Other languages
Chinese (zh)
Inventor
刘应邦
刘宏伟
张旭
王晓瑜
钟夏伟
周强
任继东
徐润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Engineering No8 Construction Engineering Co ltd
Original Assignee
Chengdu Construction Engineering No8 Construction Engineering Co ltd
Filing date
Publication date
Application filed by Chengdu Construction Engineering No8 Construction Engineering Co ltd filed Critical Chengdu Construction Engineering No8 Construction Engineering Co ltd
Application granted granted Critical
Publication of CN221090950U publication Critical patent/CN221090950U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a building construction transportation device which comprises a shell and stirring blades, wherein a first handle is fixedly arranged on one side of the shell, a first spring is arranged on the inner wall of the first handle, the other end of the first spring is arranged at the lower end of a button, the button is embedded in the lower surface of the shell, one side of the button is fixedly provided with one end of a steel wire rope, and the other end of the steel wire rope is arranged at the upper end of a balance plate through the outer surface of a fixed pulley. This construction conveyer, when needs conveyer connect the material, constructor promotes conveyer to the below of feed opening, after loosening the button on the handle one again, the first button of spring pushes away the normal position, and the second spring promotes the buckle to one side for the inner wall of buckle is connected with the surface block of transmission shaft one, has guaranteed conveyer stability when connecing the material, has also alleviateed constructor and has applyed the power when promoting conveyer simultaneously, and the convenience that the operation was got up very simultaneously.

Description

Building construction conveyer
Technical Field
The utility model relates to the technical field of building construction, in particular to a building construction transportation device.
Background
Along with the continuous development of science and technology and the improvement of living standard, the building industry is also developing at a rapid speed, one of the most important plates in the building industry is building construction, the building construction is an indispensable process in the building industry, the quality of the building construction determines the completion progress of the whole building engineering project, and a plurality of devices are needed in the building construction plate, wherein one of the indispensable devices is a transportation device during the building construction.
Most of the existing concrete cement transportation construction transportation devices are used for directly and simply transporting, mixed cement can be precipitated again in the transportation process, and the mixing degree of the cement is not up to standard and cannot be used when the cement is discharged, so that the working efficiency is seriously influenced.
Disclosure of utility model
The utility model aims to provide a building construction transportation device, which solves the problem that the transportation device in the background art does not have the function of preventing cement from solidifying in the transportation process.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction conveyer, includes shell and stirring leaf, one side of shell fixed mounting has handle one, and the inner wall of handle one installs spring one, and the other end of spring one installs the lower extreme at the button, the button is embedded to be installed at the lower surface of shell, and one side fixed mounting of button has wire rope's one end, wire rope's the other end passes through the surface mounting of fixed pulley at the upper end of balance plate, and fixed pulley fixed mounting is on the inner wall of shell, the balance plate is installed on the inner wall of shell, and the lower surface of balance plate is provided with wire rope's one end, and wire rope's the other end is installed in the one side of buckle in the chucking mechanism,
The two sides of the shell are embedded with a transmission mechanism, the transmission mechanism is connected with a rotating shaft of a stirring blade, and the stirring blade is arranged on the inner wall of the material loading bin
One side of the shell is fixedly provided with a handle II, the inner walls of the handle II and the shell are provided with a blanking mechanism, and the other side of the shell is provided with a baffle in an embedded mode.
Preferably, the clamping mechanism is composed of a fixed block, a second spring and a buckle, the fixed block is embedded on the inner wall of the shell, one end of the second spring is arranged on the inner wall of the fixed block, the other end of the second spring is arranged on one side of the buckle, the other side of the buckle is provided with a circular arc-shaped groove, the inner wall of the buckle is connected with the outer surface of the first transmission shaft in a clamping mode, and the outer surface of the buckle is connected with the inner wall of the fixed block in a sliding mode.
By adopting the technical scheme, the stability of the conveying device in receiving is ensured, and the workload of constructors in using the conveying device for conveying is reduced.
Preferably, the transmission mechanism comprises a wheel, a first transmission shaft, a transmission chain and a second transmission shaft, the wheel is arranged on the outer surface of the shell, the rotating shaft of the wheel is connected with the first transmission shaft, one end of the transmission chain is arranged on the outer surface of the first transmission shaft, the other end of the transmission chain is arranged on the outer surface of the second transmission shaft, and the second transmission shaft is connected with the rotating shaft of the stirring blade.
By adopting the technical scheme, the cement in the material loading bin can be stirred in the transportation process of the transportation device, and solidification is prevented.
Preferably, the blanking mechanism is composed of a first gear, a first slide bar, a third spring, a connecting rod, a second slide bar, a second gear and a baffle, the first gear is embedded on the upper surface of the second handle, the outer surface of the first gear is connected with the upper surface of the first slide bar, one end of the first slide bar is provided with the third spring, the other end of the third spring is arranged on the inner wall of the second handle, one end of the connecting rod is fixedly connected with the other end of the first slide bar, the other end of the connecting rod is fixedly arranged at one end of the second slide bar, the second slide bar is arranged on the inner wall of the outer shell, the lower surface of the second slide bar is connected with the second gear, the second gear is arranged on the inner wall of the outer shell, and a rotating shaft of the second gear is connected with a rotating shaft of one end of the baffle.
By adopting the technical scheme, the constructor can rotate the gear for a while, and then blanking can be performed.
Preferably, the two sides of the balance plate are provided with sliding blocks, the sliding blocks are connected with sliding rails on the inner wall of the shell, and the two sides of the balance plate are in sliding connection with the inner wall of the shell.
By adopting the technical scheme, whether the wheel can rotate or not can be controlled by pressing and lifting the button.
Preferably, the outer surface of the first gear is in meshed connection with the upper surface of the first slide rod, and the outer surface of the second gear is in meshed connection with the lower surface of the second slide rod.
By adopting the technical scheme, the rotation of the first gear is ensured to drive the rotation of the second gear.
Compared with the prior art, the utility model has the beneficial effects that: this construction conveyer:
1. When the conveying device is required to receive materials, a constructor pushes the conveying device to the lower part of the blanking opening, after the button on the first handle is released, the first spring pushes the button back to the original position, and the second spring pushes the buckle to one side, so that the inner wall of the buckle is in clamping connection with the outer surface of the first transmission shaft, the stability of the conveying device in receiving materials is ensured, meanwhile, the force applied by the constructor in pushing the conveying device is also reduced, and meanwhile, the operation is very convenient;
2. When a constructor uses the conveying device, the rotation of the wheels can drive the transmission chain to start to transmit on the outer surfaces of the first transmission shaft and the second transmission shaft, and then the stirring blades are driven to start to rotate, so that the cement in the conveying device can not be solidified due to the rotation of the stirring blades in the conveying process, and the cement in the conveying device can be always stirred as long as the conveying device moves on the ground, and meanwhile, the device is simple in structure;
3. After the conveyer reaches the destination, constructors drive the gear I on the upper surface of the handle II to rotate, and then drive the slide bar to move to one side, so that the slide bar is driven to move to one side, the gear II rotates, and then the baffle rotates to start discharging, the convenience of discharging is reflected, the time of transportation and the difficulty of discharging are greatly reduced, and the manual labor is reduced.
Drawings
FIG. 1 is a schematic elevational view of the present utility model;
FIG. 2 is a schematic view of the front cross-section structure of the present utility model;
FIG. 3 is a schematic view of the back cross-section structure of the present utility model;
FIG. 4 is a schematic top view of the present utility model;
FIG. 5 is a schematic illustration of the structure of the transmission mechanism and stirring She Ceshi of the present utility model;
fig. 6 is a schematic side sectional view of the balance plate and the steel wire rope of the present utility model.
In the figure: 1. a housing; 2. a first handle; 3. a first spring; 4. a button; 5. a wire rope; 6. a balance plate; 7. a fixed pulley; 8. a clamping mechanism; 81. a fixed block; 82. a second spring; 83. a buckle; 9. a transmission mechanism; 91. a wheel; 92. a transmission shaft I; 93. a drive chain; 94. a transmission shaft II; 10. stirring the leaves; 11. a second handle; 12. a blanking mechanism; 121. a first gear; 122. a first slide bar; 123. a third spring; 124. a connecting rod; 125. a second slide bar; 126. a second gear; 13. a baffle; 14. and (5) loading a bin.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the present utility model provides a technical solution: the building construction transportation device comprises a shell 1, a handle I2, a spring I3, a button 4, a steel wire rope 5, a balance plate 6, a fixed pulley 7, a clamping mechanism 8, a fixed block 81, a spring II 82, a buckle 83, a transmission mechanism 9, wheels 91, a transmission shaft I92, a transmission chain 93, a transmission shaft II 94, a stirring blade 10, a handle II 11, a blanking mechanism 12, a gear I121, a slide bar I122, a spring III 123, a connecting rod 124, a slide bar II 125, a gear II 126, a baffle 13 and a material loading bin 14.
The transportation device has the function of convenient transportation, and is specifically as follows:
One side fixed mounting of shell 1 has handle one 2, and the inner wall of handle one 2 installs spring one 3, and the lower extreme at button 4 is installed to the other end of spring one 3, button 4 embedded mounting is at the lower surface of shell 1, and one side fixed mounting of button 4 has the one end of wire rope 5, the other end of wire rope 5 passes through fixed pulley 7's surface mounting at the upper end of balance plate 6, and fixed pulley 7 fixed mounting is on the inner wall of shell 1, balance plate 6 installs on the inner wall of shell 1, and the lower surface of balance plate 6 is provided with the one end of wire rope 5, and the other end of wire rope 5 is installed in one side of buckle 83 in chucking mechanism 8.
The clamping mechanism 8 is composed of a fixed block 81, a second spring 82 and a buckle 83, the fixed block 81 is embedded in the inner wall of the shell 1, one end of the second spring 82 is installed on the inner wall of the fixed block 81, the other end of the second spring 82 is installed on one side of the buckle 83, the other side of the buckle 83 is provided with a circular arc groove, the inner wall of the buckle 83 is connected with the outer surface of the first transmission shaft 92 in a clamping mode, and the outer surface of the buckle 83 is connected with the inner wall of the fixed block 81 in a sliding mode.
The both sides of balance board 6 all are provided with the slider, and the slider is connected with the slide rail on the inner wall of shell 1, and the both sides of balance board 6 and the inner wall sliding connection of shell 1.
When the conveyer is required to be used for conveying cement, after the constructor pushes the conveyer to the lower side of the blanking opening, the button 4 on the lower surface of the first handle 2 is loosened by hand, so that the first spring 3 stops receiving force, the button 4 is pushed back to the original position, when the button 4 moves to the original position, the balance plate 6 is pulled downwards along the outer surface of the fixed pulley 7 by the steel wire rope 5, meanwhile, the second spring 82 arranged on the inner wall of the fixed block 81 stops being stressed, the buckle 83 in the clamping mechanism 8 is pushed leftwards, the inner wall of the buckle 83 is connected with the outer surface of the first transmission shaft 92 in a clamping manner, the conveyer cannot move back and forth, after the material receiving is finished, the constructor presses the button 4 on the lower end of the first handle 2 by hand, meanwhile, the first spring 3 and the second spring 82 are stressed to deform, the buckle 83 and the first transmission shaft 92 are directly stopped being clamped, at the moment, the constructor can push the conveyer to the place of the blanking, the stability of the conveyer in the material receiving process is ensured, and meanwhile, the difficulty of the constructor is relieved.
The transporting device has the functions of moving and stirring, and is specifically as follows:
The two sides of the shell 1 are embedded with a transmission mechanism 9, the transmission mechanism 9 is connected with a rotating shaft of a stirring blade 10, the stirring blade 10 is arranged on the inner wall of a material loading bin 14,
The drive mechanism 9 comprises a wheel 91, a first drive shaft 92, a drive chain 93 and a second drive shaft 94, wherein the wheel 91 is arranged on the outer surface of the shell 1, the rotating shaft of the wheel 91 is connected with the first drive shaft 92, one end of the drive chain 93 is arranged on the outer surface of the first drive shaft 92, the other end of the drive chain 93 is arranged on the outer surface of the second drive shaft 94, and the second drive shaft 94 is connected with the rotating shaft of the stirring blade 10.
When the conveyer is in the in-process that removes, the rotation of wheel 91 can drive transmission shaft one 92 in drive mechanism 9 and rotate, can drive transmission chain 93 and begin the transmission when transmission shaft one 92 rotates, can drive transmission shaft two 94 and rotate when transmission shaft two 94 rotate and can drive stirring leaf 10 and rotate, can stir the cement of conveyer inside when stirring leaf 10 begins to rotate, avoid solidifying again in the transportation, guaranteed that the stirring quality of cement accords with the standard of follow-up use when the unloading, guaranteed that work efficiency does not receive the influence.
The conveying device has the effect of facilitating blanking, and is specifically as follows:
One side of the shell 1 is fixedly provided with a handle II 11, the handle II 11 and the inner wall of the shell 1 are provided with a blanking mechanism 12, and the other side of the shell 1 is provided with a baffle 13 in an embedded mode.
The blanking mechanism 12 is composed of a first gear 121, a first slide rod 122, a third spring 123, a connecting rod 124, a second slide rod 125, a second gear 126 and a baffle 13, the first gear 121 is embedded on the upper surface of the second handle 11, the outer surface of the first gear 121 is connected with the upper surface of the first slide rod 122, one end of the first slide rod 122 is provided with the third spring 123, the other end of the third spring 123 is arranged on the inner wall of the second handle 11, the other end of the first slide rod 122 is fixedly connected with one end of the connecting rod 124, the other end of the connecting rod 124 is fixedly arranged at one end of the second slide rod 125, the second slide rod 125 is arranged on the inner wall of the shell 1, the lower surface of the second slide rod 125 is connected with the second gear 126, the second gear 126 is arranged on the inner wall of the shell 1, and a rotating shaft of the second gear 126 is connected with a rotating shaft of one end of the baffle 13.
The outer surface of the first gear 121 is in meshed connection with the upper surface of the first slide bar 122, and the outer surface of the second gear 126 is in meshed connection with the lower surface of the second slide bar 125.
When the conveyer arrives at the discharging place, the constructor starts to rotate the gear one 121 in the discharging mechanism 12 on the upper surface of the handle two 11 clockwise, the gear one 121 rotates to drive the slide bar one 122 to move to one side, when the slide bar one 122 moves to one side, the spring three 123 is stressed to deform, when the slide bar one 122 moves to drive the connecting rod 124 to move to one side, when the connecting rod 124 moves to one side, the slide bar two 125 moves to one side and drives the gear two 126 to rotate anticlockwise, when the gear two 126 rotates to drive the baffle 13 to rotate anticlockwise by taking the gear two 126 as the circle center, after the constructor observes that the cement in the charging bin 14 arranged on the inner wall of the shell 1 is completely discharged, the constructor stops contacting with the outer surface of the gear one 121, so that the slide bar one 122 is restored to restore the original position, and then the slide bar two 125 is driven to restore the original position, the baffle 13 is restored to stop discharging, the discharging process is embodied, the working efficiency in the transportation process is accelerated very conveniently,
Working principle: when the building construction conveyer is used, when the conveyer is required to discharge, the button 4 is released firstly to push the conveyer to start receiving materials, after receiving materials is finished, the button 4 is pressed down to push the conveyer to discharge materials at a designated place, the stirring blade 10 stirs cement in the moving process, and after the cement reaches the discharging place, the first rotary gear 121 starts to discharge materials, so that the overall practicability is improved.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Building construction conveyer, including shell (1) and stirring leaf (10), its characterized in that: one side of the shell (1) is fixedly provided with a handle I (2), the inner wall of the handle I (2) is provided with a spring I (3), the other end of the spring I (3) is arranged at the lower end of the button (4), the button (4) is embedded on the lower surface of the shell (1), one side of the button (4) is fixedly provided with one end of a steel wire rope (5), the other end of the steel wire rope (5) is arranged at the upper end of a balance plate (6) through the outer surface of a fixed pulley (7), the fixed pulley (7) is fixedly arranged on the inner wall of the shell (1), the balance plate (6) is arranged on the inner wall of the shell (1), the lower surface of the balance plate (6) is provided with one end of the steel wire rope (5), the other end of the steel wire rope (5) is arranged on one side of a buckle (83) in a clamping mechanism (8),
The two sides of the shell (1) are embedded with a transmission mechanism (9), the transmission mechanism (9) is connected with a rotating shaft of a stirring blade (10), the stirring blade (10) is arranged on the inner wall of a material loading bin (14),
One side of the shell (1) is fixedly provided with a handle II (11), the inner walls of the handle II (11) and the shell (1) are provided with a blanking mechanism (12), and the other side of the shell (1) is provided with a baffle plate (13) in an embedded mode.
2. A construction transportation device according to claim 1, wherein: the clamping mechanism (8) is composed of a fixed block (81), a second spring (82) and a buckle (83), the fixed block (81) is embedded in the inner wall of the shell (1), one end of the second spring (82) is arranged on the inner wall of the fixed block (81), the other end of the second spring (82) is arranged on one side of the buckle (83), the other side of the buckle (83) is provided with a circular arc-shaped groove, the inner wall of the buckle (83) is connected with the outer surface of the first transmission shaft (92) in a clamping mode, and the outer surface of the buckle (83) is connected with the inner wall of the fixed block (81) in a sliding mode.
3. A construction transportation device according to claim 1, wherein: the transmission mechanism (9) is composed of a wheel (91), a first transmission shaft (92), a transmission chain (93) and a second transmission shaft (94), the wheel (91) is arranged on the outer surface of the shell (1), a first transmission shaft (92) is connected to a rotating shaft of the wheel (91), one end of the transmission chain (93) is arranged on the outer surface of the first transmission shaft (92), the other end of the transmission chain (93) is arranged on the outer surface of the second transmission shaft (94), and the second transmission shaft (94) is connected with a rotating shaft of the stirring blade (10).
4. A construction transportation device according to claim 1, wherein: the blanking mechanism (12) is composed of a first gear (121), a first slide rod (122), a third spring (123), a connecting rod (124), a second slide rod (125), a second gear (126) and a baffle (13), the first gear (121) is embedded on the upper surface of the second handle (11), the outer surface of the first gear (121) is connected with the upper surface of the first slide rod (122), one end of the first slide rod (122) is provided with the third spring (123), the other end of the third spring (123) is arranged on the inner wall of the second handle (11), the other end of the first slide rod (122) is fixedly connected with one end of the connecting rod (124), the other end of the connecting rod (124) is fixedly arranged at one end of the second slide rod (125), the second slide rod (125) is arranged on the inner wall of the shell (1), the lower surface of the second gear (125) is connected with the second gear (126), and the rotating shaft of the second gear (126) is connected with the rotating shaft of one end of the baffle (13).
5. A construction transportation device according to claim 1, wherein: the balance plate (6) is characterized in that sliding blocks are arranged on two sides of the balance plate (6), the sliding blocks are connected with sliding rails on the inner wall of the shell (1), and two sides of the balance plate (6) are in sliding connection with the inner wall of the shell (1).
6. A construction transportation device according to claim 4, wherein: the outer surface of the first gear (121) is in meshed connection with the upper surface of the first slide rod (122), and the outer surface of the second gear (126) is in meshed connection with the lower surface of the second slide rod (125).
CN202323313282.4U 2023-12-05 Building construction conveyer Active CN221090950U (en)

Publications (1)

Publication Number Publication Date
CN221090950U true CN221090950U (en) 2024-06-07

Family

ID=

Similar Documents

Publication Publication Date Title
CN221090950U (en) Building construction conveyer
CN210058132U (en) Material mixing device for processing refractory bricks
CN220521342U (en) Geotechnical engineering slip casting device
CN214871639U (en) Cement leveling device for building construction
CN214166707U (en) Blanking plate for concrete truck
CN213198223U (en) Building cement mortar mixing equipment with stirring wall sticking prevention function
CN114482579B (en) Red brick mortar smearing device for building construction
CN215654908U (en) Environment-friendly antibacterial putty powder mixer
CN113235374B (en) Road surface high-efficient patching device is used in highway maintenance
CN209832197U (en) Concrete discharge apparatus convenient to unload fast
CN208343160U (en) A kind of intense agitation device convenient for commerical ready-mixed concrete
CN220389856U (en) High-efficient mixing stirring device
CN215549777U (en) High-efficiency concrete mixer matched with pump truck for use
CN217226101U (en) Concrete mixer
CN219076100U (en) Mortar coating processing loading attachment
CN219294313U (en) Light high-strength concrete stirring device
CN216736599U (en) Mortar conveying mechanism of mortar mixer
CN219213617U (en) High-efficient agitating unit is used in concrete production
CN214353340U (en) Unloading device for mixing building cement
CN216442792U (en) Small amount of concrete transportation device for house building engineering
CN218148362U (en) High-strength grouting material pouring and circulating device for fan foundation
CN212525895U (en) Efficient roller mill of roller mill for casting
CN213648062U (en) Concrete mortar mixing device
CN218342477U (en) Wet-mixed mortar mixer
CN218988200U (en) Dry-mixed mortar anti-segregation discharging device

Legal Events

Date Code Title Description
GR01 Patent grant