CN221074339U - Full section atomizer with adjustable in tunnel - Google Patents

Full section atomizer with adjustable in tunnel Download PDF

Info

Publication number
CN221074339U
CN221074339U CN202322200098.2U CN202322200098U CN221074339U CN 221074339 U CN221074339 U CN 221074339U CN 202322200098 U CN202322200098 U CN 202322200098U CN 221074339 U CN221074339 U CN 221074339U
Authority
CN
China
Prior art keywords
spraying
hose
roadway
inlet
way joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322200098.2U
Other languages
Chinese (zh)
Inventor
陈冰
宁文越
张盼博
杨竣捷
罗杰
田龙彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Coal Mining Hancheng Mining Co Ltd
Original Assignee
Shaanxi Coal Mining Hancheng Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Coal Mining Hancheng Mining Co Ltd filed Critical Shaanxi Coal Mining Hancheng Mining Co Ltd
Priority to CN202322200098.2U priority Critical patent/CN221074339U/en
Application granted granted Critical
Publication of CN221074339U publication Critical patent/CN221074339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses an adjustable full-section spraying device in a roadway, which comprises a plurality of spraying hoses arranged along the inner walls of different cross sections of the roadway, wherein the spraying hoses are provided with a plurality of nozzles at intervals; the inlet end of the spray hose is provided with a three-way joint; the first inlet of the three-way joint is connected with the water source main pipe through a branch pipe, and the second inlet of the three-way joint is connected with the air source main pipe through another branch pipe; wherein, the water source and the air source enter the spraying hose at the same time to increase the water source pressure during spraying; according to the utility model, the air source and the water source which are commonly used in the tunnel underground are mixed through the three-way connector and then enter the spraying hose together, so that the pressure of spraying water mist can be effectively increased, and the dust removing effect is improved.

Description

Full section atomizer with adjustable in tunnel
Technical Field
The utility model belongs to the technical field of dust removal in a roadway, and particularly relates to an adjustable full-section spraying device in the roadway.
Background
The dust generated in the normal tunneling process of the roadway working face comprehensive tunneling machine is larger, so that comprehensive dust prevention and dust elimination are required in a rear roadway.
At present, the common practice is to connect a full-section spraying device on a three-way connecting pipe of a water source main pipe. However, due to the deep roadway and long water source transmission distance, the water pressure of the water source main pipe is small, the water quality in the water source main pipe is poor, the spraying device is easy to block, and the dust removing effect is poor.
Disclosure of utility model
The utility model aims to provide an adjustable full-section spraying device in a roadway, which is characterized in that an air source and a water source are connected into a spraying pipe so as to improve spraying pressure and strengthen dust removing effect.
The utility model adopts the following technical scheme: an adjustable full-section spraying device in a roadway comprises a plurality of spraying hoses which are arranged along the inner walls of different cross sections of the roadway, wherein a plurality of nozzles are arranged on the spraying hoses at intervals;
The inlet end of the spray hose is provided with a three-way joint;
The first inlet of the three-way joint is connected with the water source main pipe through a branch pipe, and the second inlet of the three-way joint is connected with the air source main pipe through another branch pipe;
wherein, the water source and the air source enter the spraying hose at the same time to increase the water source pressure during spraying.
Preferably, the first inlet/the second inlet of the three-way joint is connected with the branch pipe through a connecting hose.
Preferably, a plurality of fixing frames are arranged on the inner wall of the roadway at intervals, and the spraying hose is fixed on the plurality of fixing frames.
Preferably, an outlet valve is arranged on the outlet of the three-way joint.
Preferably, each branch pipe is provided with an adjusting valve for adjusting the air quantity and the water quantity entering the spraying hose.
The beneficial effects of the utility model are as follows: according to the utility model, the air source and the water source which are commonly used in the tunnel underground are mixed through the three-way connector and then enter the spraying hose together, so that the pressure of spraying water mist can be effectively increased, and the dust removing effect is improved.
Drawings
FIG. 1 is a schematic diagram of a full section adjustable spraying device in a roadway according to an embodiment of the present utility model;
FIG. 2 is a schematic diagram of a connection structure of a shower pipe according to an embodiment of the present utility model;
Fig. 3 is a partial enlarged view of a portion a in fig. 2.
Wherein: 10. roadway; 20. a spray hose; 30. a water source main pipe; 40. an air source main pipe; 50. a three-way joint; 60. a branch pipe; 70. a connecting hose; 80. and a fixing frame.
Detailed Description
The utility model will be described in detail below with reference to the drawings and the detailed description.
When the current fully-mechanized coal mining machine is driven, dust is suspended in the air for a long time due to poor water source spraying effect, visibility is reduced, ventilation air methane is used for rushing to the whole roadway, and the phenomenon of dust emission and the like is easy to occur due to wellhead rushing. In the coal mine infrastructure project, dust prevention and control are the types of occupational disease hazard prevention and control, and are particularly important in the tunneling process of a tunneling machine, so that according to the actual condition of the site, the fixed full-face spray which is singly dependent on water pressure is modified into wind-water linkage spray, and the pressure is adjustable, so that the problems can be effectively solved.
The utility model discloses an adjustable full-section spraying device in a roadway, which is shown in fig. 1, and comprises a plurality of spraying hoses 20 arranged along the inner walls of different cross sections of the roadway, wherein a plurality of nozzles are arranged on the spraying hoses 20 at intervals. In the embodiment of the utility model, the original spray hard pipe is replaced by the spray hose 20, so that the spray hard pipe is convenient to install, and when the spray position needs to be adjusted, the spray hard pipe can be adjusted more conveniently and more conveniently according to the needs.
Regarding the problem of installing the nozzle on the spray hose 20, the spray hose 20 may be divided into a plurality of sections, a tee is installed between the two ends connected to each other, and a nozzle is installed at the third outlet of the tee.
The inlet end of the spray hose 20 is provided with a three-way joint 50; the first inlet of the three-way joint 50 is connected with the water source main pipe 30 (i.e. the three-way connecting pipe on the water source main pipe 30) through a branch pipe 60, and the second inlet of the three-way joint 50 is connected with the air source main pipe 40 (i.e. the three-way connecting pipe on the air source main pipe 30) through another branch pipe 60; wherein both the water source and the air source enter the spray hose 20 to increase the water source pressure during spraying.
According to the utility model, the pressure of spraying water mist can be effectively increased by mixing the gas source and the water source which are commonly used in the tunnel underground through the three-way connector 50 and then jointly entering the spraying hose 20, so that the dust removing effect is improved. The three-way connector 50 may be a quick connector for ease of installation.
In one embodiment, as shown in fig. 3, the first inlet/second inlet of the three-way joint is connected to the branch pipe 60 through a connection hose 70. The connection hose 70 can be conveniently connected with the air source main pipe 40/the water source main pipe 30 through the design of the branch pipe 60, because the branch pipe 60 adopts a hard pipe design, one end of the branch pipe is welded with the main pipe, and the connection hose 70 at the other end can be directly inserted on the outer wall of the branch pipe 60, so that the operation is convenient.
In addition, as shown in fig. 2, a plurality of fixing frames 80 are installed on the inner wall of the roadway 10 at intervals, and the spray hose 20 is fixed on the plurality of fixing frames 80. Since the spray hose 20 is a hose and cannot be directly welded and fixed like a common steel pipe, the fixing frame 80 is installed on the inner wall of the roadway, and the spray hose 20 can be bound on the fixing frame 80. The shape of the fixing frame 80 can be designed according to the actual requirements of the site.
In one embodiment, each of the manifold 60 has an adjustment valve mounted thereon for adjusting the amount of air and water entering the spray hose 20. An outlet valve is mounted on the outlet of the three-way fitting 50. The valves installed on the branch pipes 60 are used for controlling the inlet amount of the water source and the air source, namely the proportion of the water source and the air source is regulated, and the outlet valve is used for regulating the size of the sprayed water mist and can be regulated according to the requirement.
According to the adjustable full-section spraying device, the adjustable valve is additionally arranged according to the principle of compressed air pressurization, so that water flow sprayed out of the nozzle is fully atomized, the spraying effect can be adjusted at any time according to the dust condition of a roadway, and the high-efficiency and saving effects are achieved. In addition, the traditional spray is poor in spray forming, cannot be adjusted, has more water yield, is easy to form accumulated water after long-time use of the pavement, causes excessive accumulated water in roadway sludge, not only affects civilized production, but also causes inconvenience to normal pedestrian driving.
The full-section spraying device adopts hoses to be paved along the section of a roadway, 10 nozzles are adopted, 1 electric welder is used for processing, and 4 working stations can be used for processing. The explosion-proof loader is matched with the human body for 4 persons during installation.
The adjustable full-section spraying device provided by the embodiment of the utility model has the advantages that the flexible pipe is utilized for processing, the fixation is reliable, the installation is convenient, the use is convenient, the installation is completed only by 10 minutes, the service life is long, and the installation position can be adjusted according to the requirement in the later stage.
In addition, the water quantity can be saved after the air source and the water source are combined. The water consumption of the original spraying per hour is 1.45m 3, the maximum water consumption of the adjustable spraying is 1.1m 3, the minimum mist forming water consumption is 0.35m 3, the water consumption of normal tunneling dust is 0.8m 3, the spraying device 12 channels are needed in the main inclined shaft tunnel, water consumption (1.45-0.8) multiplied by 12=7.8m 3 can be saved per hour, the tunneling of a normal comprehensive tunneling machine can be carried out for 16 hours every day, the water consumption of 7.8x16=124.8m 3 can be saved every day, the water consumption cost of 3744m 3 can be saved every month, and the economic effect is obvious.
In summary, the full-section spraying device has the advantages of low processing cost, convenient use, convenient installation and obvious effect; the spraying quantity can be adjusted according to the dust quantity in the tunnel air, so that targeted dust removal and dust removal can be performed; the device has the advantages of large water pressure, wide coverage, good fog dispersion effect, capability of atomizing and adsorbing dust, and good condition for underground comprehensive dust prevention; compared with the traditional spray, the spray has the advantages of saving water consumption, high internal pressure, difficult blockage of the spray nozzle, and long-term economic value from economic and practical analysis.

Claims (2)

1. The adjustable full-section spraying device in the roadway is characterized by comprising a plurality of spraying hoses (20) which are arranged along the inner walls of different cross sections of the roadway, wherein a plurality of nozzles are arranged on the spraying hoses (20) at intervals;
the inlet end of the spray hose (20) is provided with a three-way joint (50);
The first inlet of the three-way joint (50) is connected with the water source main pipe (30) through a branch pipe (60), and the second inlet of the three-way joint (50) is connected with the air source main pipe (40) through another branch pipe (60);
Wherein a water source and a gas source enter the spraying hose (20) simultaneously to increase the water source pressure during spraying;
the first inlet/the second inlet of the three-way joint is connected with the branch pipe (60) through a connecting hose (70);
An outlet valve is arranged on the outlet of the three-way joint (50);
Each branch pipe (60) is provided with an adjusting valve for adjusting the air quantity and the water quantity entering the spraying hose (20).
2. An adjustable full-face spraying device in a roadway as claimed in claim 1, characterized in that a plurality of fixing frames (80) are arranged on the inner wall of the roadway (10) at intervals, and the spraying hose (20) is fixed on the plurality of fixing frames (80).
CN202322200098.2U 2023-08-16 2023-08-16 Full section atomizer with adjustable in tunnel Active CN221074339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322200098.2U CN221074339U (en) 2023-08-16 2023-08-16 Full section atomizer with adjustable in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322200098.2U CN221074339U (en) 2023-08-16 2023-08-16 Full section atomizer with adjustable in tunnel

Publications (1)

Publication Number Publication Date
CN221074339U true CN221074339U (en) 2024-06-04

Family

ID=91262398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322200098.2U Active CN221074339U (en) 2023-08-16 2023-08-16 Full section atomizer with adjustable in tunnel

Country Status (1)

Country Link
CN (1) CN221074339U (en)

Similar Documents

Publication Publication Date Title
CN205955768U (en) Novel air water mixes spraying dust fall device
CN221074339U (en) Full section atomizer with adjustable in tunnel
CN102644475A (en) Air-water linkage spraying device
CN111957455A (en) Mining reinforcing drainage atomizer
CN202544901U (en) Air-water linkage spraying device
CN210115161U (en) Horizontal wet-type electrostatic precipitator sprays online maintenance device
CN204782855U (en) Mining rig of being furnished with dust collector
CN210919136U (en) Air-water mixing linkage type spray head for mine dust removal
CN220470007U (en) Adjustable dust suppression device
CN204267077U (en) The wind power ganged double purification water curtain in tunnel
CN210977568U (en) Wind-water linkage adjusting spraying device for dust fall in tunneling work
CN203175599U (en) Wind-water linkage spraying dust settling device
CN220194363U (en) Intelligent dust fall atomizer
CN215085808U (en) Environmental protection engineering construction is with pressing down dirt equipment
CN213953662U (en) Flexible dust fall spraying system for narrow coal pillar extraction roadway of coal mine
CN211777412U (en) Dry fog dust collector of development machine
CN206190312U (en) Air -water linkage spraying device
CN210975472U (en) Watering device for highway maintenance
CN205936697U (en) Fill sand silo and make thick liquid nozzle
CN210068147U (en) Dust removal device of development machine
CN217241890U (en) Water-saving sprinkling irrigation device
CN109098747A (en) Aeration structure is isolated in narrow tunnel
CN220979561U (en) Gas-liquid mixed spraying dust settling system of heading machine
CN215860282U (en) Dust flushing device for coal mine air return roadway
CN202376876U (en) Dedusting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant