CN221050342U - Pipeline transportation device for building construction - Google Patents

Pipeline transportation device for building construction Download PDF

Info

Publication number
CN221050342U
CN221050342U CN202322873134.1U CN202322873134U CN221050342U CN 221050342 U CN221050342 U CN 221050342U CN 202322873134 U CN202322873134 U CN 202322873134U CN 221050342 U CN221050342 U CN 221050342U
Authority
CN
China
Prior art keywords
plate
intervals
transportation device
building construction
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322873134.1U
Other languages
Chinese (zh)
Inventor
徐翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Tianzhou Construction Co ltd
Original Assignee
Chongqing Tianzhou Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Tianzhou Construction Co ltd filed Critical Chongqing Tianzhou Construction Co ltd
Priority to CN202322873134.1U priority Critical patent/CN221050342U/en
Application granted granted Critical
Publication of CN221050342U publication Critical patent/CN221050342U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a pipeline transportation device for building construction, which comprises a fixed plate, wherein one side of the fixed plate is provided with an end cover, a plurality of groups of connecting rods are arranged between the fixed plate and the end cover at intervals, a plurality of groups of object placing frames are arranged between the connecting rods in a sliding manner along the length direction, vertical plates are arranged at the bottoms of the object placing frames at intervals, vertical sliding grooves I are arranged on two sides of the object placing frames and the vertical plates at intervals, partition plates are arranged at the plurality of groups of the vertical sliding grooves I at intervals and are arranged in the sliding grooves I at intervals, a group of sliding blocks I matched with the sliding grooves I are respectively fixedly arranged at two ends of the partition plates, screw holes I are formed in the sliding blocks I, the partition plates and the object placing frames can be integrally hoisted and taken out through external hoisting equipment after the partition plates are taken out, the operation is convenient, and the loading and unloading efficiency is improved.

Description

Pipeline transportation device for building construction
Technical Field
The application relates to the technical field of building construction, in particular to a pipeline transportation device for building construction.
Background
The construction engineering refers to engineering entities formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of matched lines, pipelines and equipment, and a large number of pipelines are often used in the construction of the construction engineering, so that a transportation device is usually required to transport the pipelines.
The utility model discloses a centralized pipeline carrying device for water conservancy construction in China with the publication number of CN219487814U, which comprises fixed angle irons and pipelines, wherein one end of each fixed angle iron is fixedly provided with a limiting backboard, the surface of each limiting backboard is provided with an adaptive groove, the inside of each fixed angle iron is sequentially provided with a first fixed square frame and a second fixed square frame, the surfaces of each first fixed square frame and each second fixed square frame are sequentially provided with polygonal through holes, and the top end of each fixed angle iron is in a straight shape and is sequentially provided with a fixed circular groove.
The device is provided with spacing backplate and spacing curb plate, and it is fixed square frame to slide between spacing backplate and the spacing curb plate to be provided with first fixed square frame and second, and when carrying out the pipeline transportation, the staff inserts the pipeline and establishes in the adaptation groove of first fixed square frame and the fixed square frame of second, then carries out the butt fixedly to pipeline both ends through spacing backplate and spacing curb plate, but when dismantling the operation, need demolish spacing curb plate back and extract the pipeline, complex operation, loading and unloading efficiency is lower.
Disclosure of utility model
Aiming at the problem of lower pipeline loading and unloading efficiency in the prior art, the utility model particularly provides a pipeline transportation device for building construction.
For this purpose, the utility model adopts the following specific technical scheme:
The utility model provides a pipeline transportation device for building construction, which comprises
The fixing plate is provided with an end cover at one side, a plurality of groups of connecting rods are arranged between the fixing plate and the end cover at intervals, two ends of each connecting rod are respectively fixedly connected with the fixing plate and the end cover, and a plurality of groups of object placing frames are arranged on the connecting rods in a sliding manner at intervals along the length direction;
The clamping mechanism comprises a plurality of groups of vertical plates, a partition plate, a first sliding block, clamping blocks and an adjusting rod, wherein the vertical plates are fixedly arranged at the bottom of the storage frame at intervals;
The control mechanism is arranged on the fixed plate.
Preferably, the control mechanism comprises an abutting plate and a screw rod, the abutting plate is located between the fixing plate and the end cover, the abutting plate is arranged on one side of the fixing plate in a rotating mode, the screw rod is arranged on the fixing plate, a second threaded hole matched with the screw rod is formed in the fixing plate, a worker can drive the abutting plate to axially move along the screw rod through rotating the screw rod, abutting of the end portion of the pipeline is achieved, and the operation is convenient.
Preferably, the connecting rod is provided with a second sliding groove along the length direction, the abutting plate is provided with a second sliding block matched with the second sliding groove, the abutting plate is limited through the second sliding groove, and the moving stability of the abutting plate is guaranteed.
Preferably, a sliding block III matched with the sliding groove II is fixedly arranged on the storage frame, and the sliding block III slides along the sliding groove II to limit the storage frame, so that the moving stability of the storage frame is ensured.
Preferably, the side wall of the clamping block is arc-shaped, so that the pipeline can be clamped conveniently.
Preferably, the top of putting the thing frame is provided with the apron, and apron both ends interval fixed be provided with multiunit gag lever post, and the top of putting the thing frame is equipped with the counter bore of joining in marriage with the gag lever post, carries out spacingly through setting up apron opposition thing frame top, guarantees the stability of putting the thing frame.
Preferably, the side wall of the clamping block is fixedly provided with a rubber pad, and the pipeline is protected by the rubber pad, so that the damage to the pipeline is avoided.
By adopting the technical scheme, the method has the advantages that:
The utility model is provided with a fixed plate, one side of the fixed plate is provided with an end cover, a plurality of groups of connecting rods are arranged between the fixed plate and the end cover at intervals, a plurality of groups of object placing frames are arranged between the connecting rods at intervals along the length direction, vertical plates are arranged at the bottoms of the object placing frames at intervals, two sides of the object placing frames and the vertical plates are respectively provided with a vertical sliding groove I, a plurality of groups of baffle plates are arranged in the sliding grooves I at intervals, two ends of the baffle plates are respectively fixedly provided with a group of sliding blocks I assembled with the sliding grooves I, the sliding blocks I are provided with threaded holes I, the tightness of the baffle plates and the object placing frames can be adjusted through adjusting rods in the device, the baffle plates can be directly lifted and taken out integrally through pipelines of the object placing frames of external lifting equipment after the baffle plates are taken out, the operation is convenient, and the loading and unloading efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are needed in the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 shows a schematic structural view of the present utility model;
FIG. 2 shows a partial schematic of the present utility model;
fig. 3 shows a partial cross-sectional view of the present utility model.
Wherein: the fixing plate 1, the end cover 2, the connecting rod 3, the second chute 301, the object placing frame 4, the vertical plate 401, the first chute 402, the third slide block 403, the partition plate 5, the first slide block 501, the first threaded hole 502, the clamping block 503, the adjusting rod 504, the cover plate 6, the limiting rod 601, the abutting plate 7, the screw 701 and the second slide block 702.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
As shown in fig. 1 to 3, the embodiment of the utility model discloses a pipeline transportation device for building construction,
The fixing plate 1, one side of the fixing plate 1 is provided with an end cover 2, a plurality of groups of connecting rods 3 are arranged between the fixing plate 1 and the end cover 2 at intervals, two ends of each connecting rod 3 are respectively fixedly connected with the fixing plate 1 and the end cover 2, and a plurality of groups of object placing frames 4 are arranged on the connecting rods 3 at intervals along the length direction in a sliding manner;
The clamping mechanism comprises a vertical plate 401, a partition plate 5, a first sliding block 501, clamping blocks 503 and an adjusting rod 504, wherein the vertical plate 401 is arranged into a plurality of groups and fixedly arranged at the bottom of the storage frame 4 at intervals, two sides of the storage frame 4 and the vertical plate 401 are respectively provided with a first vertical sliding chute 402, the partition plate 5 is arranged into a plurality of groups and slidingly arranged in the first vertical chute 402 at intervals, two ends of the partition plate 5 are respectively fixedly provided with a first sliding block 501 assembled with the first vertical chute 402, the first sliding block 501 is provided with a first threaded hole 502, the adjusting rod 504 is provided with a threaded section assembled with the first threaded hole 502, the clamping blocks 503 are arranged into a plurality of groups, and two ends of the inner side bottom of the storage frame 4, two ends of the top of the partition plate 5 and two ends of the bottom of the partition plate 5 are fixedly provided with clamping blocks 503;
The control mechanism is arranged on the fixed plate 1.
In at least one embodiment, the control mechanism comprises an abutting plate 7 and a screw 701, the abutting plate 7 is located between the fixed plate 1 and the end cover 2, the screw 701 is rotatably arranged on one side, close to the fixed plate 1, of the abutting plate 7, a threaded hole II matched with the screw 701 is formed in the fixed plate 1, and a worker can drive the abutting plate to axially move along the screw 701 by rotating the screw 701, so that abutting of the end part of a pipeline is realized, and the operation is convenient.
In at least one embodiment, the connecting rod 3 is provided with a second chute 301 along the length direction, the abutting plate 7 is provided with a second slider 702 assembled with the second chute 301, and the abutting plate 7 is limited through the second chute 301, so that the moving stability of the abutting plate 7 is ensured.
In at least one embodiment, the third slider 403 assembled with the second chute 301 is fixedly arranged on the storage frame 4, and the third slider 403 slides along the second chute 301 to limit the storage frame 4, so as to ensure the moving stability of the storage frame 4.
In at least one embodiment, the side walls of the clamping block 503 are arc-shaped, so as to facilitate clamping the pipeline.
In at least one embodiment, the top of the storage frame 4 is provided with a cover plate 6, multiple groups of limiting rods 601 are fixedly arranged at two ends of the cover plate 6 at intervals, counter bores assembled with the limiting rods 601 are formed in the top of the storage frame 4, and the top of the storage frame 4 is limited by arranging the cover plate 6, so that the stability of the storage frame 4 is ensured.
In at least one embodiment, the side wall of the clamping block 503 is fixedly provided with a rubber pad, and the rubber pad is arranged to protect the pipeline from damage.
When carrying out pipeline transportation operation, the staff slides the multiunit between fixed plate 1 and the end cover 2 according to pipeline length and puts thing frame 4 for put thing frame 4 and can carry out the multiple spot bearing to the pipeline, then put into the multiunit pipeline in proper order and put the bottom of thing frame 4, multiunit baffle 5 separates the pipeline, reduce the mutual collision between the pipeline when transporting, guarantee the security, place the baffle 5 along spout one 402 in putting thing frame 4 after placing right amount of pipeline, make the bottom and the top pipeline butt of baffle 5, then continue to push down baffle 5, press down the fixture block 503 on in-process baffle 5 and the thing frame 4 clamp down the pipeline, guarantee the stability of transportation, will adjust pole 504 screw thread after pressing to suitable height and insert on slider one 501 at baffle 5 both ends, lock baffle 5 and put thing frame 4, then can continue to pass through baffle 5 with the follow-up pipeline and stack in proper order and establish, be convenient for simultaneously transport multiunit pipeline, but the pipeline both ends are carried out the butt through control mechanism staff and are pressed from each other, be convenient for be suitable for pipeline transportation of different length, when having improved application scope, put into place the pipeline and take out the work and take out the baffle 5 and put the pipeline, take out the overall operation efficiency, can be improved, the pipeline 401 can be taken out, and put the pipeline operation efficiency is taken out, and the pipeline is taken out to be convenient to be moved and easy to the place.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present application, and are not limiting; although the application has been described in detail with reference to the foregoing embodiments, it will be appreciated by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not drive the essence of the corresponding technical solutions to depart from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims (7)

1. The utility model provides a pipeline transportation device for construction which characterized in that: comprising
The fixing plate is provided with an end cover at one side, a plurality of groups of connecting rods are arranged between the fixing plate and the end cover at intervals, two ends of each connecting rod are respectively fixedly connected with the fixing plate and the end cover, and a plurality of groups of object placing frames are arranged on the connecting rods in a sliding manner at intervals along the length direction;
The clamping mechanism comprises a plurality of groups of vertical plates, a partition plate, a first sliding block, clamping blocks and an adjusting rod, wherein the vertical plates are fixedly arranged at the bottom of the storage frame at intervals;
The control mechanism is arranged on the fixed plate.
2. A pipeline transportation device for building construction according to claim 1, wherein: the control mechanism comprises an abutting plate and a screw rod, the abutting plate is located between the fixing plate and the end cover, the screw rod is rotatably arranged on one side, close to the fixing plate, of the abutting plate, and a second threaded hole matched with the screw rod is formed in the fixing plate.
3. A pipeline transportation device for building construction according to claim 2, wherein: the connecting rod is provided with a second sliding groove along the length direction, and a second sliding block matched with the second sliding groove is arranged on the abutting plate.
4. A pipe transportation apparatus for construction according to claim 3, wherein: and a sliding block III matched with the sliding groove II is fixedly arranged on the storage frame.
5. A pipeline transportation device for building construction according to claim 1, wherein: the side wall of the clamping block is arc-shaped.
6. A pipeline transportation device for building construction according to claim 1, wherein: the top of the object placing frame is provided with a cover plate, two ends of the cover plate are fixedly provided with a plurality of groups of limiting rods at intervals, and the top of the object placing frame is provided with counter bores matched with the limiting rods.
7. A pipeline transportation device for building construction according to claim 1, wherein: the side wall of the clamping block is fixedly provided with a rubber pad.
CN202322873134.1U 2023-10-25 2023-10-25 Pipeline transportation device for building construction Active CN221050342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322873134.1U CN221050342U (en) 2023-10-25 2023-10-25 Pipeline transportation device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322873134.1U CN221050342U (en) 2023-10-25 2023-10-25 Pipeline transportation device for building construction

Publications (1)

Publication Number Publication Date
CN221050342U true CN221050342U (en) 2024-05-31

Family

ID=91200257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322873134.1U Active CN221050342U (en) 2023-10-25 2023-10-25 Pipeline transportation device for building construction

Country Status (1)

Country Link
CN (1) CN221050342U (en)

Similar Documents

Publication Publication Date Title
CN204366591U (en) A kind of pipe fitting device for discharging and chamfering machine thereof
CN211366692U (en) Municipal works construction lifts by crane transport anchor clamps
CN221050342U (en) Pipeline transportation device for building construction
CN212926955U (en) Movable operation frame for constructional engineering
CN205172022U (en) Novel shop's thick liquid bucket that can be used to hollow building block
CN210063949U (en) Flat plate transportation frame
CN218560849U (en) Material handling machine for building
CN217000456U (en) High strength concatenation formula prestressing force superimposed sheet
CN115256626A (en) Production device and method of photovoltaic tubular pile
CN215168139U (en) Concrete overhead hoist
CN106638493B (en) Double lifting point pull rod gate
CN208363617U (en) Water pipe well reserved casing pipe die
CN208618788U (en) A kind of quickly splicing building template
CN206359154U (en) A kind of steel construction secondary member hoisting device
CN206685827U (en) A kind of stand apparatus of the electric spool of prefabricated adjustment height roofing and crane span structure
CN216690348U (en) A regularization built-up plate for having outer frame parapet construction
CN221460476U (en) Clamp for angle steel galvanization
CN215518870U (en) Prefabricated assembled E-shaped reinforced concrete water and electricity pipe well
CN215154781U (en) Adjustable pipe fitting storage device
CN215714667U (en) Reinforcing cage butt joint guider
CN215803586U (en) Water storage bucket is used in building engineering construction
CN214034093U (en) Double-layer spoke type space string tensioning device with inner ring lower string ring beam fastening structure
CN204262563U (en) A kind of welding wire gathering-device
CN216551958U (en) Light prefabricated building component convenient to transport and used for deep foundation pit construction
CN219792133U (en) Factory building construction of can splice dismantlement is with hoist and mount track

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant