CN221049118U - A cover formula rubber coating device for corrugated box equipment - Google Patents

A cover formula rubber coating device for corrugated box equipment Download PDF

Info

Publication number
CN221049118U
CN221049118U CN202322438361.1U CN202322438361U CN221049118U CN 221049118 U CN221049118 U CN 221049118U CN 202322438361 U CN202322438361 U CN 202322438361U CN 221049118 U CN221049118 U CN 221049118U
Authority
CN
China
Prior art keywords
installation
frame
wall
glue
belt body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322438361.1U
Other languages
Chinese (zh)
Inventor
顾晓旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Bolaite Paper Container Co ltd
Original Assignee
Zhejiang Bolaite Paper Container Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bolaite Paper Container Co ltd filed Critical Zhejiang Bolaite Paper Container Co ltd
Priority to CN202322438361.1U priority Critical patent/CN221049118U/en
Application granted granted Critical
Publication of CN221049118U publication Critical patent/CN221049118U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Making Paper Articles (AREA)

Abstract

The application discloses a covering type gluing device for assembling corrugated cartons, which relates to the technical field of corrugated carton processing equipment and comprises a conveyor belt body, wherein mounting risers are arranged at two side positions of the bottom wall of the conveyor belt body, brackets are arranged at the top positions of the outer walls of the two groups of mounting risers, collecting frames are arranged at the top wall positions of the two groups of brackets, glue guiding frames are arranged at the upper end positions of the inner walls of the two groups of collecting frames, vertical mounting assemblies are arranged on the outer walls of the two sides of the conveyor belt body, glue injecting assemblies are fixed on the vertical mounting assemblies, a plurality of groups of hanging frames are uniformly arranged on the vertical mounting assemblies, and brushes are detachably arranged at the bottom wall positions of the plurality of groups of hanging frames. According to the application, the superfluous sizing material on the upper surface of the corrugated board can be automatically scraped to the two sides of the conveyor belt body under the action of the hairbrush, and can be automatically collected into the inner cavity of the collecting frame under the conduction of the sizing guide frame, so that the superfluous sizing material can be prevented from polluting the ground and wasting the sizing material.

Description

A cover formula rubber coating device for corrugated box equipment
Technical Field
The application relates to the technical field of corrugated case processing equipment, in particular to a covering type gluing device for corrugated case assembly.
Background
The corrugated case is a common paper case packing article, has the advantages of high bearing capacity, energy conservation, environmental protection and the like, and paper sheets are required to be glued and adhered into paper boards in the processing process of the corrugated case, and then the paper sheets are assembled into the case.
The current Chinese patent document with the publication number of CN218108205U discloses a covering type gluing device for assembling corrugated boxes, which comprises a frame, wherein a conveyor belt is arranged on the frame, a gluing mechanism is arranged on the frame, the gluing mechanism comprises symmetrically-arranged support laths, the bottom ends of the two support laths are fixedly connected with the frame, a support frame is arranged between the top ends of the two support laths, a support plate is arranged at the top end of the support frame, and support blocks are symmetrically arranged at the top of the support plate.
The utility model can ensure that the gluing device for assembling the corrugated paper box is convenient to achieve more uniform gluing effect in the using process, ensures the firmness of the corrugated paper box during assembling, and improves the assembling quality of the corrugated paper box, but can not recover and collect redundant glue when in use, so that the redundant glue can only freely drip through two sides of a conveyor belt, is easy to pollute the ground and can cause waste.
Disclosure of utility model
In order to solve the problems that the excessive glue cannot be recovered and collected when the corrugated paper box is used, so that the excessive glue can only drop freely through two sides of the conveyor belt, the ground is easy to pollute and waste is caused, the application provides a covering type gluing device for assembling corrugated paper boxes.
The application provides a covering type gluing device for assembling corrugated boxes, which adopts the following technical scheme:
A cover and close formula rubber coating device for corrugated box equipment, including the conveyer belt body, the installation riser is all installed to the both sides position of conveyer belt body diapire, two sets of the bracket is all installed to the top position of installation riser outer wall, two sets of the roof position of bracket all is provided with collects the frame, two sets of the upper end position of collecting the frame inner wall all installs and leads gluey frame, vertical installation component is all installed to the outer wall of conveyer belt body both sides, be fixed with the injecting glue subassembly on the vertical installation component, evenly install the multiunit hoist and mount frame on the vertical installation component, multiunit hoist and mount frame's diapire position detachable installs the brush.
Through adopting above-mentioned technical scheme, place corrugated container board on the conveyer belt body and drive corrugated container board and move to the front side, utilize the injecting glue subassembly to make the sizing material spout to corrugated container board's upper surface, and at corrugated container board's removal in-process, the sizing material of corrugated container board upper surface is scraped to the brush is automatic for sizing material distributes evenly, place collection frame top-down on the bracket roof, can make the redundant sizing material of corrugated container board upper surface automatic scrape the both sides position of conveyer belt body under the effect of brush, can the automatic collection in collection frame's the inner chamber under the conduction effect of guide frame, can avoid unnecessary sizing material to pollute the ground, cause the sizing material extravagant.
Optionally, the vertical installation component includes the installing frame, the installing frame is fixed on the outer wall of conveyer belt body, the inner chamber diapire position of installing frame is fixed with the cylinder, the tip position of the vertical output shaft of cylinder runs through the installing frame roof and is fixed with the installation roof.
Through adopting above-mentioned technical scheme, thereby synchronous start multiunit cylinder is flexible can drive installation roof and reciprocate to suitable position department, can drive second rubber coating pipe and brush synchronous movement to corresponding position department under the effect of installation roof this moment to can adjust the vertical interval between brush and the conveyer belt body, the corrugated container board of different thickness is convenient to be applicable to.
Optionally, the injecting glue subassembly includes first rubberizing pipe, first rubberizing pipe is fixed on the roof of installation roof, first rubberizing pipe bottom wall position evenly is fixed with the second rubberizing pipe that the multiunit runs through the installation roof, first rubberizing pipe end position is connected with soft connecting pipe, soft connecting pipe's the other end and glue supply equipment interconnect.
By adopting the technical scheme, the control valve on the second glue coating pipe at a proper position is opened according to the cross section size of the corrugated board, so that the glue stock can be sprayed to the upper surface of the corrugated board through the soft connecting pipe, the first glue coating pipe and the second glue coating pipe under the action of glue supply equipment.
Optionally, a plurality of groups of second screw holes are formed in the top position of the hairbrush, and second bolts in threaded connection with the second screw holes are respectively arranged on two sides of the bottom wall of the lifting frame in a penetrating mode.
Through adopting above-mentioned technical scheme, revolve and twist the second bolt and make its and second screw between the separation, then take off the brush and make it and hoist and mount between the frame separate, conveniently dismantle the change brush.
Optionally, the roof position of bracket has all seted up the locating hole, collect frame diapire position and install the fixture block that runs through the locating hole.
Through adopting above-mentioned technical scheme, place the collection frame top-down on the bracket roof to make the fixture block can with the mutual block of locating hole, conveniently dismantle the change and collect the frame.
Optionally, the bottom position movable sleeve of installation riser outer wall is equipped with the installation mullion, the outer wall bottom position of installation mullion is fixed with mounting plate, mounting plate's inside has been seted up the installation through-hole, the outer wall lower extreme position of installation riser has evenly seted up multiunit first screw, the first bolt with first screw threaded connection is worn to be equipped with in installation mullion outer wall upper end position.
Through adopting above-mentioned technical scheme, revolve and twist and make the separation between its and the first screw, follow the vertical movement conveyer belt body and drive the installation riser and move to suitable position department in the inner chamber of installation mullion, then reverse screw and make its and the corresponding position first screw between threaded connection to can adjust the vertical interval between conveyer belt body and the ground, conveniently satisfy different user demands.
In summary, the present application includes at least one of the following beneficial effects:
Firstly, placing the collecting frame on the top wall of the bracket from top to bottom, enabling the clamping blocks to be clamped with the positioning holes, automatically scraping redundant sizing materials on the upper surface of the corrugated board to the two sides of the conveyor belt body under the action of the hairbrush, automatically collecting the sizing materials into the inner cavity of the collecting frame under the conduction action of the sizing guide frame, and avoiding the pollution of the redundant sizing materials to the ground, the waste of sizing materials and the like;
The second, thereby synchronous start multiunit cylinder is flexible can drive the installation roof and reciprocate to suitable position department, can drive second rubber coating pipe and brush synchronous movement to corresponding position department this moment under the effect of installation roof to can adjust the vertical interval between brush and the conveyer belt body, the corrugated container board of different thickness is convenient to be applicable to.
Drawings
FIG. 1 is a schematic diagram of a front cross-sectional structure of the present application;
FIG. 2 is a schematic diagram of a front cross-sectional structure of the present application;
FIG. 3 is a schematic view of the right-hand cross-sectional structure of the present application;
Fig. 4 is an enlarged view of the portion a of fig. 1 according to the present application.
In the figure: 1. a glue guiding frame; 2. a collection frame; 3. a clamping block; 4. a first screw hole; 5. installing a vertical frame; 6. mounting through holes; 7. a conveyor belt body; 8. a first bolt; 9. a mounting base plate; 10. installing a vertical plate; 11. a bracket; 12. a mounting frame; 13. a cylinder; 14. installing a top plate; 15. a first glue-coating tube; 16. a second rubber coating tube; 17. a flexible connecting tube; 18. a second bolt; 19. a second screw hole; 20. hoisting the frame; 21. a brush.
Detailed Description
The application is described in further detail below with reference to fig. 1-4.
Referring to fig. 1, 2 and 3 of the drawings, one embodiment of the present application is provided: a cover formula rubber coating device for corrugated box equipment, including conveyer belt body 7, installation riser 10 is all installed to the both sides position of conveyer belt body 7 diapire, bracket 11 is all installed to the top position of two sets of installation riser 10 outer walls, the roof position of two sets of brackets 11 all is provided with collects frame 2, the top position of collecting frame 2 sets up to the opening form, guide frame 1 is all installed to the upper end position of two sets of collection frame 2 inner walls, guide frame 1's roof position sets up to the slope form, the locating hole has all been seted up to bracket 11's roof position, collect frame 2 diapire position and install the fixture block 3 of running through the locating hole.
Referring to fig. 1, 2 and 3 in the drawings, vertical mounting assemblies are mounted on the outer walls of two sides of the conveyor belt body 7, each vertical mounting assembly comprises a mounting frame 12, the mounting frame 12 is fixed on the outer wall of the conveyor belt body 7, an air cylinder 13 is fixed at the bottom wall of an inner cavity of the mounting frame 12, and the end position of a vertical output shaft of the air cylinder 13 penetrates through the top wall of the mounting frame 12 and is fixed with a mounting top plate 14.
Referring to fig. 1, 2 and 3 of the drawings, a mounting top plate 14 is fixed with an adhesive injection assembly, the adhesive injection assembly comprises a first adhesive coating pipe 15, the first adhesive coating pipe 15 is fixed on the top wall of the mounting top plate 14, a plurality of groups of second adhesive coating pipes 16 penetrating through the mounting top plate 14 are uniformly fixed at the bottom wall of the first adhesive coating pipe 15, control valves are arranged on the outer walls of the plurality of groups of second adhesive coating pipes 16, a soft connecting pipe 17 is connected at the end position of the first adhesive coating pipe 15, the other end of the soft connecting pipe 17 is connected with adhesive supply equipment, a plurality of groups of lifting frames 20 are uniformly arranged on the vertical mounting assembly, the longitudinal section of the lifting frames 20 is in an inverted T shape, and brushes 21 are detachably arranged at the bottom wall positions of the plurality of groups of lifting frames 20.
The corrugated board is placed on the conveyor belt body 7, then the conveyor belt body 7 is started to drive the corrugated board to move towards the front side, at the moment, a control valve on the second glue coating pipe 16 at a proper position is opened according to the cross section size of the corrugated board, so that glue can be sprayed to the upper surface of the corrugated board through the soft connecting pipe 17, the first glue coating pipe 15 and the second glue coating pipe 16 under the action of glue supply equipment, and in the moving process of the corrugated board, the hairbrush 21 automatically scrapes the glue on the upper surface of the corrugated board, so that the glue is uniformly distributed.
The collecting frame 2 is placed on the top wall of the bracket 11 from top to bottom, the clamping blocks 3 can be clamped with the positioning holes, redundant sizing materials on the upper surface of the corrugated board can be automatically scraped to the two sides of the conveyor belt body 7 under the action of the hairbrush 21, the sizing materials can be automatically collected into the inner cavity of the collecting frame 2 under the conduction action of the glue guiding frame 1, and the situation that the redundant sizing materials pollute the ground and cause sizing material waste and the like can be avoided.
The synchronous start multiunit cylinder 13 stretches out and draws back thereby can drive installation roof 14 and reciprocate to suitable position department, can drive second rubber coating pipe 16 and brush 21 synchronous movement to corresponding position department this moment under the effect of installation roof 14 to can adjust the vertical interval between brush 21 and the conveyer belt body 7, the corrugated container board of different thickness is convenient to be applicable to.
Referring to fig. 1, 2 and 3 in the drawings of the specification, a movable sleeve is arranged at the bottom of the outer wall of a mounting vertical plate 10, a mounting bottom plate 9 is fixed at the bottom of the outer wall of the mounting vertical plate 5, mounting through holes 6 are formed in the mounting bottom plate 9, a plurality of groups of first screw holes 4 are uniformly formed at the lower end of the outer wall of the mounting vertical plate 10, and first bolts 8 in threaded connection with the first screw holes 4 are arranged at the upper end of the outer wall of the mounting vertical plate 5.
This cover formula rubber coating device for corrugated box equipment is stably placed in suitable position department and makes mounting plate 9 can with ground stable contact through multiunit installation mullion 5, utilize expansion bolts to run through installation through-hole 6 and then can be with this cover formula rubber coating device for corrugated box equipment stable fixed in corresponding position department, then screw first bolt 8 makes separation between its and the first screw 4, then reciprocate conveyer belt body 7 and drive installation mullion 10 and move to suitable position department in the inner chamber of installation mullion 5, then reverse screw first bolt 8 makes threaded connection between its and the first screw 4 of relevant position, thereby can adjust the vertical interval between conveyer belt body 7 and the ground, conveniently satisfy different user demands.
Referring to fig. 1 and 4 in the drawings, a plurality of groups of second screw holes 19 are formed at the top of the brush 21, and second bolts 18 in threaded connection with the second screw holes 19 are respectively arranged at two sides of the bottom wall of the lifting frame 20. The second bolt 18 is screwed to separate the second bolt from the second screw hole 19, and then the brush 21 is taken down to separate the second bolt from the lifting frame 20, so that the brush 21 can be conveniently detached and replaced.
Working principle: when the covering type gluing device for corrugated case assembly is used, the covering type gluing device for corrugated case assembly is stably placed at a proper position through the plurality of groups of mounting mullions 5, the mounting bottom plate 9 can be stably contacted with the ground, the covering type gluing device for corrugated case assembly can be stably fixed at a corresponding position through the mounting through holes 6 by using the expansion bolts, then the first bolts 8 are screwed to separate the covering type gluing device from the first screw holes 4, then the conveyor belt body 7 is moved up and down to drive the mounting mullions 10 to synchronously move to a proper position in the inner cavity of the mounting mullions 5, and then the first bolts 8 are reversely screwed to enable the first bolts 8 to be in threaded connection with the first screw holes 4 at corresponding positions, so that the vertical distance between the conveyor belt body 7 and the ground can be adjusted, and different use requirements can be conveniently met.
When the corrugated paper box is processed, corrugated paper boards are placed on the conveyor belt body 7, then the conveyor belt body 7 is started to drive the corrugated paper boards to move towards the front side, and at the moment, a control valve on the second glue coating pipe 16 at a proper position is opened according to the cross section size of the corrugated paper boards, so that glue materials can be sprayed to the upper surface of the corrugated paper boards through the soft connecting pipe 17, the first glue coating pipe 15 and the second glue coating pipe 16 under the action of glue supply equipment, and in the moving process of the corrugated paper boards, the hairbrush 21 automatically scrapes glue materials on the upper surface of the corrugated paper boards, so that the glue materials are uniformly distributed.
The collecting frame 2 is placed on the top wall of the bracket 11 from top to bottom, the clamping blocks 3 can be clamped with the positioning holes, redundant sizing materials on the upper surface of the corrugated board can be automatically scraped to the two sides of the conveyor belt body 7 under the action of the hairbrush 21, the sizing materials can be automatically collected into the inner cavity of the collecting frame 2 under the conduction action of the glue guiding frame 1, and the situation that the redundant sizing materials pollute the ground and cause sizing material waste and the like can be avoided.
The synchronous start multiunit cylinder 13 stretches out and draws back thereby can drive installation roof 14 and reciprocate to suitable position department, can drive second rubber coating pipe 16 and brush 21 synchronous motion to corresponding position department this moment under the effect of installation roof 14 to can adjust the vertical interval between brush 21 and the conveyer belt body 7, the corrugated container board of different thickness is conveniently applicable to, revolves and twists between second bolt 18 makes its and the second screw 19 separate, then takes off brush 21 and makes it and hoist and mount frame 20 between the separation, conveniently dismantle change brush 21.
The glue supply device is a device known to the person skilled in the art and may be a cylinder with an autonomous feeding function, by means of a pump body equipped with itself to inject glue into the second bolt 18.
Standard parts used in the document of the application can be purchased from market, all parts in the document of the application can be customized according to the description of the specification and the drawings, the specific connection modes of all parts adopt conventional means such as mature bolts, rivets, welding and the like in the prior art, the machinery, the parts and the equipment adopt conventional models in the prior art, and the circuit connection adopts conventional connection modes in the prior art, so that the specific description is not made.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (6)

1. A cover formula rubber coating device for corrugated box equipment, includes conveyer belt body (7), its characterized in that: the utility model discloses a conveyer belt, including conveyer belt body (7), installation riser (10) are all installed to both sides position of conveyer belt body (7) diapire, and two sets of bracket (11) are all installed at the top position of installation riser (10) outer wall, and two sets of roof position of bracket (11) all is provided with collects frame (2), two sets of guide frame (1) are all installed to the upper end position of collecting frame (2) inner wall, vertical installation component is all installed to the outer wall of conveyer belt body (7) both sides, be fixed with the injecting glue subassembly on the vertical installation component, evenly install multiunit hoist and mount frame (20) on the vertical installation component, multiunit hoist and mount frame (20) diapire position detachable installs brush (21).
2. A laminating adhesive apparatus for corrugated carton assembly as claimed in claim 1, wherein: the vertical installation assembly comprises an installation frame (12), the installation frame (12) is fixed on the outer wall of the conveyor belt body (7), an air cylinder (13) is fixed at the bottom wall position of an inner cavity of the installation frame (12), and the end position of a vertical output shaft of the air cylinder (13) penetrates through the top wall of the installation frame (12) and is fixed with an installation top plate (14).
3. A laminating adhesive apparatus for corrugated carton assembly as claimed in claim 2, wherein: the glue injection assembly comprises a first glue-coating pipe (15), the first glue-coating pipe (15) is fixed on the top wall of the mounting top plate (14), a plurality of groups of second glue-coating pipes (16) penetrating through the mounting top plate (14) are uniformly fixed on the bottom wall of the first glue-coating pipe (15), a soft connecting pipe (17) is connected to the end position of the first glue-coating pipe (15), and the other end of the soft connecting pipe (17) is connected with glue supply equipment.
4. A laminating adhesive apparatus for corrugated carton assembly as claimed in claim 1, wherein: a plurality of groups of second screw holes (19) are formed in the top position of the hairbrush (21), and second bolts (18) in threaded connection with the second screw holes (19) are respectively arranged on two sides of the bottom wall of the lifting frame (20).
5. A laminating adhesive apparatus for corrugated carton assembly as claimed in claim 1, wherein: the top wall of the bracket (11) is provided with positioning holes, and the bottom wall of the collecting frame (2) is provided with a clamping block (3) penetrating through the positioning holes.
6. A laminating adhesive apparatus for corrugated carton assembly as claimed in claim 1, wherein: the movable sleeve in the bottom position of the outer wall of the installation vertical plate (10) is provided with an installation vertical frame (5), an installation bottom plate (9) is fixed at the bottom position of the outer wall of the installation vertical frame (5), an installation through hole (6) is formed in the installation bottom plate (9), a plurality of groups of first screw holes (4) are uniformly formed in the lower end position of the outer wall of the installation vertical plate (10), and a first bolt (8) in threaded connection with the first screw holes (4) is arranged at the upper end position of the outer wall of the installation vertical frame (5).
CN202322438361.1U 2023-09-08 2023-09-08 A cover formula rubber coating device for corrugated box equipment Active CN221049118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322438361.1U CN221049118U (en) 2023-09-08 2023-09-08 A cover formula rubber coating device for corrugated box equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322438361.1U CN221049118U (en) 2023-09-08 2023-09-08 A cover formula rubber coating device for corrugated box equipment

Publications (1)

Publication Number Publication Date
CN221049118U true CN221049118U (en) 2024-05-31

Family

ID=91200717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322438361.1U Active CN221049118U (en) 2023-09-08 2023-09-08 A cover formula rubber coating device for corrugated box equipment

Country Status (1)

Country Link
CN (1) CN221049118U (en)

Similar Documents

Publication Publication Date Title
CN111112014B (en) Energy-saving and environment-friendly paper label production device
CN205320296U (en) Loudspeaker equipment is with integrative preparation equipment of basin frame material loading rubber coating preforming
CN221049118U (en) A cover formula rubber coating device for corrugated box equipment
CN110918367A (en) Corrugated paper gluing equipment
CN215612851U (en) A spout gluey mechanism for producing rock wool board that thermal insulation performance is good
CN219923466U (en) Glue spreading device for processing uniformly smeared composite board
CN211247130U (en) Automatic glue spreader
CN210753396U (en) Spraying device for outer surface of control arm of automobile chassis
CN110523592B (en) Device for producing lamp strip
CN113787212B (en) Environment-friendly building interior decoration structure
CN205391855U (en) A can promote wiper mechanism for plate and frame filter press
CN2358146Y (en) Automatic plastering machine
CN113499945A (en) OCR coating equipment
CN201543559U (en) Convenient rubber coating apparatus
CN205320297U (en) Loudspeaker equipment is with basin frame rubber coating film clamp
CN219523309U (en) High-viscosity glass stained paper glue spreader
CN218982142U (en) Glue coating device for plywood
CN220160391U (en) Single-sided gluing machine for plates
CN220678431U (en) Multifunctional gluing device capable of uniformly coating
CN220361448U (en) Plank rubber coating equipment
CN215435294U (en) Mount machine of gluing
CN215656093U (en) Compound various steel sheet glue dripping device
CN220995601U (en) Sticky structure on kraft paper bag
CN220635002U (en) Sizing device of paper machine
CN220429445U (en) A even rubber coating device for paper bag production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant