CN221031563U - Main rib alignment installation positioning structure of floor constructional column - Google Patents

Main rib alignment installation positioning structure of floor constructional column Download PDF

Info

Publication number
CN221031563U
CN221031563U CN202323064424.8U CN202323064424U CN221031563U CN 221031563 U CN221031563 U CN 221031563U CN 202323064424 U CN202323064424 U CN 202323064424U CN 221031563 U CN221031563 U CN 221031563U
Authority
CN
China
Prior art keywords
floor
positioning
constructional column
fixedly connected
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323064424.8U
Other languages
Chinese (zh)
Inventor
王芳银
杨宁涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Tianhui Road And Bridge Construction Engineering Co ltd
Original Assignee
Shaanxi Tianhui Road And Bridge Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Tianhui Road And Bridge Construction Engineering Co ltd filed Critical Shaanxi Tianhui Road And Bridge Construction Engineering Co ltd
Priority to CN202323064424.8U priority Critical patent/CN221031563U/en
Application granted granted Critical
Publication of CN221031563U publication Critical patent/CN221031563U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application relates to the technical field of building construction auxiliary tools, in particular to a floor constructional column main rib alignment installation positioning structure, which comprises a first floor plate and a second floor plate. The floor constructional column main rib is aligned, the positioning structure is installed, the positioning plates connected with the vertical ribs are placed on the outer surfaces of the two positioning rods, the rotating vertical ribs are screwed in the preset nuts in a rotating mode, the annular plates are connected in a sliding mode in the positioning plates, the positioning plates move upwards to be tightly attached to the inner bottom wall of the first floor plate, and the effect of connecting and positioning the vertical ribs is achieved; and the constructional column is connected to the top of the second floor board in a threaded manner and positioned on the outer surface of the dowel bar, the connecting sleeve is connected to the outer surface of the bottom of the vertical bar in a threaded manner, the connecting sleeve is rotated to enable the bottom of the connecting sleeve to be positioned in a preliminary clamping manner with the connecting column, the connecting column is rotated to adjust the clamping position, the two plugging rods are clamped into the connecting column under the action of the spring, and finally the final positioning, mounting and connection are carried out, so that the purpose that the constructional column and the vertical bar are vertically distributed is achieved.

Description

Main rib alignment installation positioning structure of floor constructional column
Technical Field
The application relates to the technical field of building construction auxiliary tools, in particular to a floor constructional column main rib alignment installation positioning structure.
Background
In a typical frame construction, floor construction is performed layer by layer from the bottom up. First, after the foundation and basement construction are completed, pouring of basement floor slabs is performed. Then, as the main structure rises layer by layer, the concrete floor of each floor is poured at the corresponding height.
Once the concrete floor of the storey is completed and meets the strength requirements, the constructor can set up scaffolding and support systems above the floor to effect installation of the construction column. Construction columns are typically composed of reinforced concrete members for supporting floors and transferring loads to foundations. Therefore, in terms of the construction sequence, it is common to complete the construction of the floor panel first and then to install the construction column, so that the stability of the floor and the continuity of the construction can be ensured.
In the process of realizing the application, the inventor finds that at least the following problems exist in the technology, when the floor is poured, constructional column joint bars penetrating through the upper part of the floor are preset in advance, constructional columns between adjacent floors are located at the same position, so the joint bars are also arranged at the same vertical position, holes are commonly formed in the bottom of the upper floor when the constructional column joint bars are arranged, the vertical bars of the upper and lower layers of constructional columns are connected with the joint bars into a whole along the vertical direction in a steel bar planting mode, but errors exist in actual construction, the joint bars of the upper and lower layers possibly deviate, steel bars of the floor can be beaten when the joint bars are right opposite to the holes, at the moment, certain deviation is needed to avoid the steel bars of the floor, and then the joint bars are punched and planted after the deviation leads the constructional column joint bars to be arranged in the vertical direction, so the supporting effect is influenced, and the floor constructional column main bar alignment installation positioning structure is provided to solve the problems.
Disclosure of utility model
Aiming at the defects of the prior art, the application provides a floor constructional column main bar aligning, installing and positioning structure, which has the advantages that constructional columns are arranged in the same straight line when being connected with the bottom of a floor, the constructional columns can be installed without punching and welding, the convenience of installing the constructional columns is improved, and the like, and solves the problems that when the traditional constructional columns are installed on the bottom of the floor, a certain deviation is needed to be carried out to avoid the reinforcing bars of the floor, then the reinforcing bars are punched and planted, and the deviation causes that the vertical bars of the constructional columns cannot be vertically arranged, so that the supporting effect is influenced.
In order to realize the purpose that the constructional column vertical ribs are connected to the bottom of the floor plate without punching and are arranged in a straight line after connection, the application provides the following technical scheme: the floor constructional column main rib aligning, installing and positioning structure comprises a first floor plate and a second floor plate, wherein a positioning and connecting assembly is arranged between the first floor plate and the second floor plate and used for connecting and positioning the constructional column;
The positioning connection assembly comprises two dowel bars, the two dowel bars are fixedly connected to the tops of a first floor plate and a second floor plate, a preset nut is fixedly connected to the bottom of the first floor plate, a vertical bar is fixedly connected to the inner threads of the preset nut, two positioning rods are fixedly connected to the bottom of the first floor plate, annular plates are fixedly connected to the outer surfaces of the vertical bars, positioning plates are fixedly connected to the outer surfaces of the annular plates, connecting sleeves are fixedly connected to the outer surfaces of the vertical bars, positioning blocks are fixedly connected to the inner portions of the connecting sleeves, constructional columns are fixedly connected to the top threads of the dowel bars, connecting columns are rotatably connected to the tops of the constructional columns, rotary blocks are fixedly connected to the bottoms of the connecting columns, mounting plates are fixedly connected to the left side and the right side of each connecting sleeve, connecting plates are fixedly connected to connecting plates, springs are fixedly connected to the bottoms of the two opposite sides of the connecting plates, and inserting rods are fixedly connected to the opposite sides of the springs.
When the vertical ribs are connected to the bottom of the first floor board, the positioning plates connected with the vertical ribs are placed on the outer surfaces of the two positioning rods, then the vertical ribs are rotated and screwed up in the preset nuts, so that the annular plates are connected in a sliding mode in the positioning plates, the positioning plates move upwards under the limit of the positioning rods, the positioning plates are attached to the inner bottom wall of the first floor board, and the effect of connecting and positioning the vertical ribs is achieved; and then the constructional column is connected to the top of the second floor board in a threaded manner and positioned on the outer surface of the dowel bar, finally, the connecting sleeve is connected to the outer surface of the bottom of the vertical dowel bar in a threaded manner, the connecting sleeve is rotated to enable the bottom of the connecting sleeve to be positioned in a preliminary clamping manner with the connecting column, the connecting column is rotated to adjust the clamping position, and then the two plugging rods are pulled to be clamped into the connecting column under the action of the springs, so that the final positioning, installation and connection are carried out, and the purpose that the constructional column and the vertical dowel bar are vertically distributed is achieved.
Further, the shape of the two dowel bars is a round bar, threads are formed on the outer surfaces of the dowel bars, dowel bar blind holes are formed in the constructional column, and the constructional column is in threaded connection with the dowel bars through the dowel bar blind holes.
The beneficial effects of adopting the further scheme are as follows: when the constructional column is installed and positioned, the constructional column can be quickly connected to the outer surface of the dowel bar in a threaded manner, and a bedding effect is achieved for subsequent fixation.
Further, the annular groove is formed in the positioning plate, the positioning plate rotates on the outer surface of the annular plate through the annular groove, two positioning rod holes are formed in the positioning plate, and the positioning plate is located on the outer surface of the two positioning rods through the two positioning rod holes.
The beneficial effects of adopting the further scheme are as follows: when guaranteeing to erect the muscle when rotatory, the locating plate can not rotate, and the locating plate can also rotate at the surface of locating lever simultaneously, makes its interior diapire of hugging closely first floor board to reach the joint bar and erect the muscle and be in on the same straight line.
Further, a positioning block groove is formed in the vertical rib, and the positioning block is located in the vertical rib through the positioning block groove.
The beneficial effects of adopting the further scheme are as follows: when the connecting sleeve is mounted on the outer surface of the vertical rib, the positioning block can be clamped into the positioning block groove, so that the condition that the subsequent connection is on the same straight line and the deviation is avoided as much as possible is achieved.
Further, the shape of spliced pole is the circular post, the rotation cavity has been seted up to the inside of constructional column, the turning block is rotatory in the inside of constructional column through rotating the cavity, the constant head tank has been seted up to the inside of adapter sleeve, the spliced pole is located the inside of adapter sleeve through the constant head tank.
The beneficial effects of adopting the further scheme are as follows: the aim at constructional column is at the screw thread connection back to the top of second floor board, and spliced pole when carrying out the joint with the adapter sleeve, spliced pole 13 can be in the inside rotation adjustment joint's of constructional column 12 position, and the constant head tank can play the effect of quick location installation, is fixed for follow-up joint and is done the bedding effect.
Further, the shape of two mounting panel is square board, and two sliding through holes has all been seted up to the inside of connecting plate, and two the plug-in pole is all through sliding through hole in the inside slip of two connecting plates.
The beneficial effects of adopting the further scheme are as follows: the sliding through holes can play a role in guiding when the two inserting connection rods relatively move or move in a separated mode, and stability of the device is further improved.
Further, the inside of spliced pole has offered the quantity and has been two spliced pole holes, two the opposite one end of spliced pole is located the inside of spliced pole through spliced pole hole.
The beneficial effects of adopting the further scheme are as follows: after the two plugging rods are clamped into the connecting column under the action of the spring, the two plugging rod holes can play a limiting role, so that the situation that the connecting sleeve rotates subsequently is avoided as much as possible, and the positioning connection of the connecting sleeve is more stable and firm.
Further, two the plug rod is from the equal fixedly connected with toggle ring of one end that leaves, and two the antiskid line has all been seted up to the surface of toggle ring.
The beneficial effects of adopting the further scheme are as follows: the purpose is that when pulling the plug rod, more conveniently exert oneself, improves the convenience of this device.
Compared with the prior art, the application provides the floor constructional column main rib alignment installation positioning structure, which has the following beneficial effects:
When the vertical ribs are connected to the bottom of the first floor board, positioning plates connected with the vertical ribs are placed on the outer surfaces of two positioning rods, then the vertical ribs are rotated to be screwed up in the preset nuts in a rotating mode, so that the annular plates are connected in a sliding mode in the positioning plates, the positioning plates move upwards under the limiting of the positioning rods, the positioning plates are attached to the inner bottom wall of the first floor board, and the effect of connecting and positioning the vertical ribs is achieved; and then the constructional column is connected to the top of the second floor board in a threaded manner and positioned on the outer surface of the dowel bar, finally, the connecting sleeve is connected to the outer surface of the bottom of the vertical dowel bar in a threaded manner, the connecting sleeve is rotated to enable the bottom of the connecting sleeve to be positioned in a preliminary clamping manner with the connecting column, the connecting column is rotated to adjust the clamping position, and then the two plugging rods are pulled to be clamped into the connecting column under the action of the springs, so that the final positioning, installation and connection are carried out, and the purpose that the constructional column and the vertical dowel bar are vertically distributed is achieved.
Drawings
FIG. 1 is a front cross-sectional view of the structure of the present application;
FIG. 2 is a front view of a structural locating plate and vertical bars of the present application;
Fig. 3 is a top view of the structural adapter sleeve of the present application.
Reference numerals illustrate: 1. a first floor board; 2. a second floor panel; 3. a dowel bar; 4. presetting a nut; 5. vertical ribs; 6. a positioning rod; 7. an annular plate; 8. a positioning plate; 9. connecting sleeves; 10. a positioning block; 11. a positioning groove; 12. constructing a column; 13. a connecting column; 14. a mounting plate; 15. a connecting plate; 16. a spring; 17. inserting a connecting rod; 18. and rotating the block.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Referring to fig. 1-3, the floor constructional column main rib alignment installation positioning structure comprises a first floor board 1 and a second floor board 2, wherein a positioning connection assembly is arranged between the first floor board 1 and the second floor board 2 and used for connecting and positioning constructional columns.
The positioning connection assembly comprises two dowel bars 3, the two dowel bars 3 are fixedly connected to the tops of the first floor board 1 and the second floor board 2, the two dowel bars 3 are circular rods, threads are formed in the outer surfaces of the dowel bars, a constructional column 12 is connected to the tops of the dowel bars 3 in a threaded mode, dowel bar blind holes are formed in the constructional column 12, the constructional column 12 is connected with the dowel bars 3 in a threaded mode through the dowel bar blind holes, and the dowel bars can be quickly connected to the outer surfaces of the dowel bars 3 in a threaded mode to achieve a bedding effect for subsequent fixing.
The bottom fixedly connected with of first floor board 1 presets nut 4, the inside threaded connection of presets nut 4 has erects muscle 5, the bottom fixedly connected with of first floor board 1 is two locating lever 6 of quantity, the surface fixedly connected with annular slab 7 of erectting muscle 5, the surface sliding connection of annular slab 7 has locating plate 8, the quantity is two locating lever holes in the inside of locating plate 8, locating plate 8 is located the surface of two locating levers 6 through two locating lever holes, the ring channel has been seted up to the inside of locating plate 8, locating plate 8 passes through the ring channel and rotates at the surface of annular slab 7, guarantee to erect muscle 5 when rotatory, locating plate 8 can not rotate, locating plate 8 can also slide at the surface of locating lever 6 simultaneously, make it paste the interior diapire of first floor board 1, thereby reach the dowel 3 and erect muscle 5 and be in same straight line.
The connecting sleeve 9 is connected to the outer surface of the vertical rib 5 in a threaded manner, the positioning block 10 is fixedly connected to the inner portion of the connecting sleeve 9, the positioning block groove is formed in the inner portion of the vertical rib 5, the positioning block 10 is located in the vertical rib 5 through the positioning block groove, when the connecting sleeve 9 is mounted on the outer surface of the vertical rib 5, the positioning block 10 can be clamped into the positioning block groove, the fact that the subsequent connection is in the same straight line is achieved, and the situation of deviation is avoided as much as possible.
The top threaded connection of dowel 3 has constructional column 12, the top of constructional column 12 rotates and is connected with spliced pole 13, the bottom fixedly connected with dwang 18 of spliced pole 13, the shape of spliced pole 13 is the circular post, the inside of constructional column 12 has been seted up and has been rotated the cavity, the inside of spliced pole 12 is passed through to the dwang 18, the constant head tank 11 has been seted up to the inside of adapter sleeve 9, spliced pole 13 is located the inside of adapter sleeve 9 through constant head tank 11, aim at constructional column 12 is at the top of threaded connection second floor board 2 after, the spliced pole is when carrying out the joint with the adapter sleeve, spliced pole 13 can be in the inside rotation adjustment joint's of constructional column 12 position, and constant head tank 11 can play quick location installation's effect, make the bedding effect for follow-up joint is fixed.
The left and right sides of adapter sleeve 9 all fixedly connected with mounting panel 14, the shape of two mounting panels 14 is square board, the equal fixedly connected with connecting plate 15 of bottom of two mounting panels 14, the equal fixedly connected with spring 16 of two opposite sides of connecting plate 15, the equal fixedly connected with peg graft pole 17 of one side that two springs 16 are relative, slide through hole has all been seted up to the inside of two connecting plates 15, slide through hole in the inside of two connecting plates 15 is all passed through to two peg graft pole 17, guarantee that two peg graft poles 17 are at relative movement or when moving mutually apart, slide through hole can play the effect of guide, further promote the stability of device.
Wherein, the inside of spliced pole 13 has been offered and has been quantity for two spliced pole holes, and two spliced poles 17 relative one end all is located the inside of spliced pole 13 through the spliced pole hole, guarantees that two spliced poles 17 joint to the inside of spliced pole 13 under the effect of spring 16 after, and two spliced pole holes can play spacing effect, avoid adapter sleeve 9 to take place follow-up pivoted condition as far as possible, make its location connection more stable firm.
In this embodiment, two grafting poles 17 are all fixedly connected with stir the ring from one end, and antiskid line has all been seted up to the surface of two stirring rings, and convenient hard more when the pulling grafting pole 17 of aim at improves the convenience of this device.
In this embodiment, although the dowel bar 3 cannot pass through the formwork below the first floor board 1 when installed, the nut 4 can be preset at the bottom end of the dowel bar 3, and the preset nut 4 is located on the bottom wall of the floor board after the first floor board 1 is poured, so that convenience is provided for subsequent connection.
The working principle of the embodiment is as follows:
when the vertical ribs 5 are connected to the bottom of the first floor board 1, the positioning plates 8 connected with the vertical ribs 5 are placed on the outer surfaces of the two positioning rods 6, then the vertical ribs 5 are rotated to be screwed up in the preset nuts 4 in a rotating mode, so that the annular plates 7 are connected in a sliding mode in the positioning plates 8, the positioning plates 8 move upwards under the limiting of the positioning rods 6, the positioning plates 8 are attached to the inner bottom wall of the first floor board 1, and the effect of connecting and positioning the vertical ribs 5 is achieved; then the constructional column 12 is connected to the top of the second floor board 2 in a threaded manner and positioned on the outer surface of the dowel bar 3, finally the connecting sleeve 9 is connected to the outer surface of the bottom of the vertical bar 5 in a threaded manner, the connecting sleeve 9 is rotated to enable the bottom of the connecting sleeve 9 to be positioned in a preliminary clamping manner with the connecting column 13, the connecting column 13 is rotated to adjust the clamping position, then the two plugging rods 17 are pulled under the action of the springs 16, the two plugging rods 17 are clamped into the connecting column 13, and finally the final positioning, mounting and connection are carried out, so that the purpose that the constructional column 12 and the vertical bar 5 are vertically distributed is achieved.
The electrical components are electrically connected with the main controller and the power supply, the main controller can be conventional known equipment for controlling a computer and the like, standard parts used in the application can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawing, the specific connection modes of the parts adopt mature bolts, rivets, welding and the like in the prior art, and the mechanical, part and equipment adopt conventional models in the prior art; in addition, the circuit connection is in a conventional connection manner in the prior art, and details not described in detail in this specification belong to the prior art known to those skilled in the art.

Claims (8)

1. The utility model provides a floor constructional column main muscle aligns installation location structure, includes first floor board (1) and second floor board (2), its characterized in that: a positioning connection assembly is arranged between the first floor board (1) and the second floor board (2) and used for connecting and positioning the constructional column;
The positioning connection assembly comprises two dowel bars (3), the two dowel bars (3) are fixedly connected to the tops of a first floor plate (1) and a second floor plate (2), a preset nut (4) is fixedly connected to the bottom of the first floor plate (1), vertical bars (5) are fixedly connected to the inner threads of the preset nut (4), positioning rods (6) with the number being two are fixedly connected to the bottom of the first floor plate (1), annular plates (7) are fixedly connected to the outer surfaces of the vertical bars (5), positioning plates (8) are fixedly connected to the outer surfaces of the annular plates (7) in a sliding mode, connecting sleeves (9) are fixedly connected to the outer surfaces of the vertical bars (5) in a threaded mode, a constructional column (12) is fixedly connected to the top of the dowel bars (3), connecting columns (13) are rotatably connected to the tops of the constructional column (12), rotating blocks (18) are fixedly connected to the bottoms of the connecting columns (13), springs (14) are fixedly connected to the left side and right side of the connecting sleeves (9), two connecting plates (15) are fixedly connected to the bottoms of the connecting plates (15), the opposite sides of the two springs (16) are fixedly connected with plug-in rods (17).
2. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the two dowel bars (3) are round bars, threads are formed on the outer surfaces of the dowel bars, dowel bar blind holes are formed in the constructional column (12), and the constructional column (12) is connected with the dowel bars (3) through the dowel bar blind holes in a threaded mode.
3. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the inside of locating plate (8) has seted up the ring channel, locating plate (8) are rotated at the surface of annular plate (7) through the ring channel, the inside of locating plate (8) has been seted up and is two locating lever holes in quantity, locating plate (8) are located the surface of two locating levers (6) through two locating lever holes.
4. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the inside of the vertical rib (5) is provided with a positioning block groove, and the positioning block (10) is positioned in the inside of the vertical rib (5) through the positioning block groove.
5. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the connecting column (13) is in a round column shape, a rotating cavity is formed in the constructional column (12), the rotating block (18) rotates in the constructional column (12) through the rotating cavity, the positioning groove (11) is formed in the connecting sleeve (9), and the connecting column (13) is located in the connecting sleeve (9) through the positioning groove (11).
6. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the shape of the two mounting plates (14) is a square plate, the interiors of the two connecting plates (15) are provided with sliding through holes, and the two plugging rods (17) slide in the interiors of the two connecting plates (15) through the sliding through holes.
7. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the inside of spliced pole (13) has seted up quantity and is two spliced pole holes, two spliced pole (17) are relative one end all is located the inside of spliced pole (13) through spliced pole hole.
8. The floor constructional column main rib alignment installation positioning structure according to claim 1, wherein: the two plug-in rods (17) are fixedly connected with poking rings at the separated ends, and anti-slip lines are formed on the outer surfaces of the poking rings.
CN202323064424.8U 2023-11-14 2023-11-14 Main rib alignment installation positioning structure of floor constructional column Active CN221031563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323064424.8U CN221031563U (en) 2023-11-14 2023-11-14 Main rib alignment installation positioning structure of floor constructional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323064424.8U CN221031563U (en) 2023-11-14 2023-11-14 Main rib alignment installation positioning structure of floor constructional column

Publications (1)

Publication Number Publication Date
CN221031563U true CN221031563U (en) 2024-05-28

Family

ID=91137654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323064424.8U Active CN221031563U (en) 2023-11-14 2023-11-14 Main rib alignment installation positioning structure of floor constructional column

Country Status (1)

Country Link
CN (1) CN221031563U (en)

Similar Documents

Publication Publication Date Title
CN110424636B (en) Prefabricated building transfer floor reserved sleeve joint bar positioning device and construction method
CN110778023B (en) Installation device and installation method of assembled combined prefabricated column
CN111042340B (en) Steel house frame
CN105781100A (en) Template component for sidewall of subway station
CN111980197B (en) Assembling type shear wall mounting process
CN221031563U (en) Main rib alignment installation positioning structure of floor constructional column
CN102828614B (en) Building template system capable of being quickly detached and installed and installation method thereof
CN109138457B (en) Support system for installing prefabricated building and construction method thereof
CN205243006U (en) Side form supports top and holds in palm
CN104452810B (en) The erecting device of pipe trench interior conduit buttress and mounting method thereof
CN220521999U (en) Construction formwork device for building outer wall
CN111255221B (en) Supporting structure for erecting pipe fittings
CN210127638U (en) Building engineering template fixing device
CN115822257A (en) Automatic reinforcing equipment for building wood formwork
CN107313451B (en) Inner supporting device of basement prefabricated slab forming die and construction method thereof
CN112727045A (en) Anchoring device for overhanging scaffold and construction method thereof
CN111482751A (en) Manufacturing process of municipal concrete prefabricated part forming reinforcement formwork
CN219158402U (en) Constructional column template structure
CN216921499U (en) Top bracing device for controlling crack of super-long reinforced concrete structure
CN219840374U (en) Angle adjusting device suitable for multi-angle inclined roof formwork support
CN220868807U (en) Clamp device for cast-in-place concrete reinforced column template
CN219826232U (en) Assembly type steel structure auxiliary construction equipment
CN111206772B (en) Temporary mounting bracket structure of secondary wall electric box and mounting process thereof
CN220301867U (en) Building construction precast floor plank strutting arrangement
CN215905762U (en) Combined tower body and base structure thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant